OPERATING DATA REPORT 50-409 DOCKET NO.
DATE 05-05-82 COMPLETED BY G.R.GA00W TELEPilONE 3 8-689-2331 i
OPERATING STATUS La Crosse Boiling Water Reactor N'"e5
- 1. Unit Name:
- 2. Reporting Period: 0001. 04-01-82 to 2400. 04-30-82
- 3. Licensed Thermal Power (MWt):
165 65.3
- 4. Nameplate Rating (Gross MWe):
50
- 5. Design Electrical Rating (Net MWe):
50
- 6. Masimum Dependable Capacity (Gross MWe):
48
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reamns:
4 i
- 9. Power Lesel To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
4 This Month Yr..t o.Date Cumulatise 720 2880 109,539
- 11. Ilours in Reporting Period 197 9 1796.6
_73,070.2
- 12. Number Of flouri Reactor Was Critical 0
0 478
- 13. Reactor Rewne Shutdown flours l
- 14. Hours Generator On-Line 197.8 1706.2 67,393.4
- 15. Unit Resene Shutdown Hours
._ 0 0
79
- 16. Gruss Thermal Energy Generated (MWil) 23,639.8 212,692.4 9,208,481.1
- 17. Gross Electrical Energy Generated (MWH) 6601 59.143 3.749.001
- 18. Net Electrical Energy Generated (MWil) 5796 54.397 2,542,389 27.5 59.2 61.5
- 19. Unit Senice Factor 27.5 59.2 61.6
- 20. Unit AsailabWity Factor 16.8
_39.4 48.4
- 21. Unit Capacity Factor IUsing MDC Net,
_ 16.1 37.8 46.4
- 22. Unit Capacity Factor (Using 1)FR Net) 0 27.6 8.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months IType. Date,and Duration of Each1:
Refueling in Progress - Commenced April 9, 1982.
Exoncted Duratinn is 12 wonke.
July 6, 1982
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI \\L OPER ATION n -- >
l 8206010 I
50-409 UNlr slluloowNs Asp rower Rrnecisoss DOCKET No.
MN UNIT N AME DATE 05-05-62 b.K.bAUUW APRIL 198.?
COMPLET ED BY REPOR T MON 11:
TELEFilONE 6U0-669-44J1 W.r
.a e
1
{ ~t, Cauw A Curretine 33 1;
~ E4 Laa nset E
-h 3?
4 2s5 f.wns
?
E3 Assaun to I
Date
$5 5
ji=
Repois r 80 j ~*
Picsent Recurrente d
4 82-07 04-09-82 S
522.8 C
1 NA NA NA SCHEDULED REFUELING OUTAGE.
EXPECTED DURATION OF 11 WEEKS.
l l
I I
)
b l
i I
2
.I 4
i i 1.used Reason:
M et h.=l -
talubit G. Instrussi.wis s 5,heduled A faguspment Failurell.splain) 1 Manual to: Picparation.it' Dr.a B Maintenance or Test 2-Manual S s ain.
I.nti> Shet-is sor I.icemce C Refueling 4 Autoniaise Nrain.
I sent Report 11.1 R t I'de int.RI G-l D NrFulator) Ressiiction 4 Other il splaint O t til i l'4)perator Traming A Iisenv 1 umination l' Adnurmiraine 4
fe OntCrJf 604 JI I flol (I spIJin)
I slUlui 1 NJine Saulfte s'8 77) ll Other 11 splaus) l
.-mw,,,
- -, - -, ~.., -
e
AVERAGE DAILY UNIT POWER LEVEL
- 09 DOCKET NO.
LACBWR v3,7 DATE 05-05-82 COMPLETED ay G.R.GADOW TELEPHONE 608-689-2331 April, 1982
\\tDNDI DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-Neti 20 i
17 0
28 2
18 0
34 0
.t 19 34 4
20 0
34 0
5 21 35 0
6 22 34 7
23 0
34 8
24 0
3 0
9 25 0
to 26 0
0 11 27 0
0 a
12 28 0
0 0
13 29 0
0 14 30 0
15 38 0
16 INSTRUCTIONS On this format,hst the average daily unit power lesel in MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.
s 19/77)
5 I
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE APRIL 1982 i'
At the onset - of April 1982 reporting period, the reactor was at 28%
Rated Thermal Power (8 MWe-Net).
A gradual escalation to 80% Rated Thermal Power (37 MWe-Net) was in progress due to an automatic shutdown in the preceding report period.
On April 8, -1982 at 2300, a de-escalation commenced for the scheduled refueling outage.
The turbine was manually tripped at 0550 4
on April 9,
1982 and the reactor was manually shut down immediately thereafter.
Significant maintenance iteiits performed during the reporting period a re indicated or the attached Mechanical Maintenance and Instrument and Electrical Maintenance listings.
1 i
i 3
4
APRIL 1982 Page 1 of 4 INSTRUMENT RND ELECTRICAL MAINTENANCE LER OR NATURE OF OUTAGE MALFUNCTION l
EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION SECURITY METAL DETECTOR CORRECTIVE OUTAGE UNKNOWN CONTINU0US ALIGNED AND BALANCED I
MR-0242 82-07 ALARM CIRCUIT SECURITY CRT READ 0UT #3 CORRECTIVE OUTAGE UNKNOWN IN0 PERATIVE REPLACED CAPACITOR 1
MR-0239 82-07 SECURITY E-FIELD CORRECTIVE OUTAGE UNKNOWN CONTINUOUS TIGHTENED WIRE LOOP 82-07 ALARM SECURITY E-FIELD CORRECTIVE OUTAGE UNKNOWN CONTINUOUS ALIGNED AND BALANCED 1
MR-0323 82-07 ALARM CIRCUIT I
SAFETY SYSTEM CH 1, 2 PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS COMPLETED SAFETY AND H O #3 82-07 SYSTEM TESTS 2
NUCLEAR CH N-5 THROUGH PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS COMPLETED TESTS N-5 I
N-8 82-07 THROUGH N-8 NUCLEAR CH N-1 PREVENTIVE OUTAGE NORMAL USAGE LOW COUNTS REPLACED NEUTRON MR-0276 82-07 DETECTOR QUALIFIED "J" B0X FACILITY OUTAGE ADDITIONAL COMPLETED COMPLETED INSTALLATION CHANGE 82-07 EQUIPMENT INSTALLATION INSTALLATION J.
74-82-11; MR-0214 RELOCATION OF TURBINE FACILITY OUTAGE RELOCATION RELOCATED COMPLETED BUILDING OILER COOLER CHANGE 82-07 REQUIRED EQUIPMENT RELOCATION CONTROL 06-81-14; MR-0270 METEOROLOGICAL FACILITY OUTAGE RELOCATION RELOCATED COMPLETED EQUIPMENT RELOCATION CHANGE 82-07 REQUIRED EQUIPMENT RELOCATION 48-81-2 MR-0103 WP6
i APRIL 1982 INSTRUMENT AND ELECTRICAL MAINTENANCE i
l LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION i
J HALON SYSTEM AUXILIARY FACILITY OUTAGE ADDITIONAL COMPLETED COMPLETED SHUTDOWN SWITCH CHANGE 82-07 EQUIPMENT INSTALLATION INSTALLATION 06-80-3A3; MR-0236 TENSIOMETER CORRECTIVE OUTAGE CALIBRATION COMPLETED COMPLETED CALIBRATION CALIBRATION MR-0209 82-07 REQUEST CALIBRATION i
MDS REGULATOR N2 CORRECTIVE OUTAGE REQUEST FOR REPLACED REPLACED GAUGES GAUGE MR-0157 82-07 CALIBRATION GAUGES FUEL GRAPPLE CORRECTIVE OUTAGE USAGE NO RED ADJUSTED STR0KE MR-0234 82-07 LIGHT 1B STATIC INVERTER FANS CORRECTIVE OUTAGE NORMAL USAGE INTERMITTENT REPLACED FAN MOTORS MR-0893 82-07 TROUBLE ALARMS 1B DIESEL BANK " A" PREVENTIVE OUTAGE CHANGE TIME REPLACED REPLACED START START BATTERIES MR-0288 82-07 BATTERY BATTERY FUEL GRAPPLE CORRECTIVE OUTAGE USAGE N0 GREEN LIGHT ADJUST LINKAGE MR-0296 82-07 l
MSIV BYPASS CORRECTIVE OUTAGE WATER IN INCORRECT CLEARED WATER AND l
VALVE POSITION MR-0227 82-07 POSITIONING INDICATION-ADJUSTED INDICATOR UNIT MAIN STEAM BYPASS CORRECTIVE OUTAGE UNKNOWN INTERMITTENT CLEANED SET POINT-
)
VALVE WIDE RANGE MR-0228 82-07 OPERATION POTENTIOMETER CONTROLLER MSIV BYPASS VALVE CORRECTIVE OUTAGE USAGE INCORRECT VALVE READJUSTED FEED BACK POSITION MR-0260 82-07 POSITION UNIT FUEL GRAPPLE CORRECTIVE OUTAGE USAGE MOTOR SHAFT RETIGHTENED GEAR TO MR-0295 82-07 SLIPPAGE SHAFT WP6
6 APRIL 1982 Page 3 of 4 a
INSTRUMENT AND ELECTRICAL MAINTENANCE LER OR
[
NATURE OF OUTAGE MALFUNCTION 6
EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION FCP 1A FLOW TRANSMITTER CORRECTIVE OUTAGE UNKNOWN CAUSING RECORDER REPLACED CONTROL j
MR-0182 82-07 SPIKE AMPLIFIER FUEL GRAPPLE CORRECTIVE OUTAGE POOR DESIGN NO RED LIGHT REPLACED REED SWITCH I
MR-0296 82-07 AND RETURN SPRINGS I
i FCP 1B LEAK-0FF CORRECTIVE OUTAGE UNKNOWN INTERMITTENT REPLACED TEMPERATURE l
j TEMPERATURE ALARM MR-0160 82-07 ALARM ALARM UNIT REACTOR HEAD THERM 0 COUPLE CORRECTIVE OUTAGE ROUGH USAGE NO CONTACT TO REPLACED BROKEN BOLT MR-0298 82-07 REACTOR HEAD d
i FCP LEAK-0FF FLOW REPLACEMENT OUTAGE SUBSTITUTION INCREASE IN REPLACED FLOW TUBES j
METERS MR-0272 82-07 REQUEST RANGE AND CALIBRATED l
j l
CONDENSER VACUUM GAUGE CORRECTIVE OUTAGE MERCURY HARD TO READ INSTALLED CLEAN i
i MR-0229 82-07 CONTAMINATION GAUGE TUBE 1
REACTOR FEED PUMP PREVENTIVE OUTAGE CALIBRATION CALIBRATED CALIBRATED GAUGES PRESSURE INDICATOR MR-0302 82-07 REQUESTED GAUGES CCTV UNDERWATER CORRECTIVE OUTAGE LEAKAGE WATER INSIDE CLEANED AND SEALED INSPECTION CAMERA MR-0311 82-07 CAMERA CAMERA CCTV UNDERWATER CORRECTIVE OUTAGE SHORT INSIDE NO PICTURE REPLACED VIDICON INSPECTION CAMERA MR-0311 82-07 CAMERA PREAMP AND REPAIRED SHORT AND OPEN IN WIRING 1
1 LOCA QUALIFIED SOLEN 0ID PREVENTIVE OUTAGE UPGRADED COMPLETED COMPLETED j
VALVES MR-0280 &
82-07 EQUIPMENT INSTALLATION INSTALLATION MR-0328 i
SOLEN 0ID CLIP PREVENTIVE OUTAGE 10 CFR 21 COMPLETED COMPLETED INSPECTION i
i VERIFICATION MR-0325 82-07 REPORT INSPECTION i
i f
I WP6
l APRIL 1982 i
Page 4 of 4 j
f INSTRUMENT AND ELECTRICAL MAINTENANCE LER OR j
NATURE OF OUTAGE MALFUNCTION
]
EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION j
l l
LPSW PRESSURE TRANSMITTER CORRECTIVE OUTAGE LINE PLUGGED NO READ 0UT CLEARED LINE AND CALIBRATION MR-0294 82-07 CALIBRATED 7
DRY CLEANER CORRECTIVE OUTAGE USAGE N0 HEAT REPLACED HEATER MR-0324 82-07 ELEMENT FCP 17 DISCHARGE VALVE CORRECTIVE OUTAGE UNKNOWN NO INDICATION REPLACED WIRE ON l
INDICniOR MR-0287 82-07 P0TENTIOMETER l
FCP 1A BYPASS VALVE CORRECTIVE OUTAGE UNKNOWN INCORRECT REPAIRED AIR LEAK
}
POSITIONER MR-0332 82-07 POSITION
}
1A WASTE WATER PUMP CORRECTIVE OUTAGE PLUGGED GAUGE IN0 PERATIVE REPLACED GAUGE MR-0331 82-07 I
FUEL GRAPPLE CORRECTIVE OUTAGE USAGE IN0 PERATIVE REPAIRED OPEN WIRE j
MR-0335 82-07 AND ADJUSTED CLUTCH
[
t WASTE WATER MONITOR CORRECTIVE OUTAGE HIGH RADIATION SATURATED FLUSHED LINE AND MR-0336 82-07 DETECTOR ADJUSTED SET POINT i
i METEOROLOGICAL PREVENTIVE OUTAGE CALIBRATION NA CALIBRATED METEOROLOGICAL EQUIPMENT 82-07 DUE EQUIPMENT
)
i l
I i
i WP6
APRIL 1982 Page 1 of 2 MECHANICAL MAINTENANCE LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER.
CAUSE RESULT CORRECTIVE ACTION REACTOR VESSEL HEAD DISASSEMBLY OUTAGE REFUELING HEAD REMOVED HEAD REMOVED MR-0243 82-07 HIGH PRESSURE SERVICE CORRECTIVE OUTAGE SCALE BUILDUP PRESSURE LOSS CLEANED PIPING WITH WATER PUMP (HPSW)
MR-0274 82-07 WATER LANCE 1A CONTROL ROD DRIVE PREVENTIVE OUTAGE PREVENTIVE PREVENTIVE PERFORMED PREVENTIVE EFFLUENT PUMP MR-0281 82-07 MAINTENANCE MAINTENANCE MAINTENANCE ON PUMP 12 LOWER CONTROL R0D PREVENTIVE OUTAGE PREVENTIVE NA LOWERED AND PERFORMED DRIVE MECHANISMS MR-0247 82-07 MAINTENANCE /
PREVENTIVE MAINlENANCE ON ACCESS TO LOWER CONTROL R0D UPPER CONTROL DRIVE MECHANISMS R0D DRIVE MECHANISM (UCRDM) 1B FORCED CIRCULATION CORRECTIVE OUTAGE SEAL WEAR SEAL WATER REPLACED MECHANICAL, UPPER PUMP MR-0805, 0207 82-07 LEAKAGE AND LOWER SEALS EMERGENCY SERVICE WATER FACILITY OUTAGE NA NA INSTALLED AUTOMATIC BALL SYSTEM CHANGE 82-07 DRIP CHECK VALVE 83-82-2 MR-0271 1A REACTOR FEED PUMP CORRECTIVE OUTAGE WEAR WATER LEAKAGE FROM REMOVED PIPING, INSTALLED COUPLING MR-0177 82-07 COUPLING COOLER UNION AND SEALED OUTLET PIPING LUBE OIL COOLER CORRECTIVE OUTAGE WEAR WATER LEAKAGE CLEANED AND REPACKED TEMPERATURE CONTROL MR-0275 82-07 VALVE VALVE HIGH PRESSURE CORE SPRAY CORRECTIVE OUTAGE WEAR INCREASED STR0KE INSTALLED NEW PACKING PUMP DEMINERALIlED INLET MR-0243 82-07 TIME AND PACKING AND STROKED VALVE VALVE LEAK MP6
APRIL 1982 Page 2 of 2 l
MECHANICAL MAINTENANCE LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION i
REACTOR SIGHT GLASS CORRECTIVE OUTAGE AGE WATER / STEAM REBUILT UPPER SECTION MR-0076 82-07 LEAKAGE AND TORQUED EMERGENCY SERVICE WATER CORRECTIVE OUTAGE ORIGINAL LEAKING CONNEC-TIGHTENED GAS 4
SUPPLY SYSTEM PUMPS MR-0225 82-07 MANUFACTURE TIONS ON GAS CONNECTIONS LINES I
FORCED CIRCULATION PUMPS PREVENTIVE OUTAGE WEAR IN NA INSTALLED NEW CUP SEALS DISCHARGE VALVES MR-0267 82-07 SIMILAR I
DIAPHRAGMS TURBINE-GENERATOR PREVENTIVE OUTAGE 5 YEAR PM NA COMMENCED DISASSEMBLY OF MR-0244 82-07
. TURBINE-GENERATOR FOR O
MR-0245 OVERHAUL SEISMIC RESTRAINTS FACILITY OUTAGE NRC REQUIREMENT NA INSTALLING SEISMIC 1
CHANGES 82-07 RESTRAINTS 78-82-5, 74-82-12, 78-82-4, 74-81-7, 74-81-9 1
INSERVICE INSPECTION PREVENTIVE OUTAGE NA NA PERFORMING ISI MR-0282 82-07
{
MR-0283 MR-0240 l
l i
i
~
WP6 t
.-