Summary of 820429 Meeting W/Util & Eds Nuclear,Inc Re plant-unique Analysis Rept for Mark I Containment Program. List of Attendees Encl
ML20053B591
Person / Time
Site: Cooper 
Issue date: 05/10/1982
From: Siegel B
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20053B592 List:
References
NUDOCS 8206010022
Download: ML20053B591 (2)


Text

r.'.

  1. g n%g Jg UNITED STATES

!"y g

NUCLEAR REGULATORY COMMISSION l

WASHINGTON, D. C. 20555 gsy

/y 9

\\*****/

RGcyI!'i!D 9

7;g May 10,1982 af,.?S Jgg

}

Docket tio. 50-341-h$$ll%

q,

//

LICEtiSEE:

Nebraska Public Power Station (NPPD)

FACILITY: Couper Nuclear Statfor.

SUBJECT:

SUMMARY

OF APRIL 29, 1982 MEETING ON PLANT UNIQUE ANALYSIS REPORT FOR MARK I CONTAINMEtlT PROGRAM On April 29, 1982 the staff met with representatives of NPPD and EDS Nuclear. The purpose of this meeting was for the licensee to brief the staff on the contents and scope of its plant unique analysis report (PUAR) and to provide copies of the report to the staff for review.

The meeting attendees are identified in Enclosure 1.

Copies of the viewgraphs presented during the meeting are contained in Enclosure 2.

After the presentation by M. Shulman of EDS Nuclear, the staff and its contractors caucused and informed NPPD that it appeared to the staff that the PUAR submitted was primarily a summary of the program effort.

Therefore, NPPD would have to submit copies of all referenced material in the PUAR that the staff does not have. We requested that this infor-mation be provided prior to October 1982, the earliest the review of this report could commence. The staff and NPPD will work together to determine the appropriate referenced material to be provided. NPPD was also informed that a trip to EDS Nuclear may be necessary to obtain additional information.in specific areas once the review has commenced.

L. Sie el, Lead Project Manager 5

l Mark I Long-Tem Program j

Operating Reactors Branch #2, DL i

i f

Enclosures:

i i

1.

tieeting Attendees l

2.

Viewgraphs cc w/o Enclosure 2:

NRC Meeting Attendees W. Segraves, FRC S. Maise, BNL J. Pilant, NPPD (4 cys.)

l J. Ranlet, BNL DVassallo BSiegel cc w/ Enclosures 1 & 2:

Std. Distribution

~ DESIGNATED ORIGINAD e

a CertifiedBfr 8206010022 820510 PDR ADOCK 05000298 P

PDR

4~

April 29, 1982 PRESENTATION OF COOPER NUCLEAR STATION PUA NRC EDS Nuclear NPPD Syron Siegel Arthur Cimento Larry Kuncl Keith R. Wichman R. J. Stuart Jay M. Pilant D. B. Vassallo Randy Broman Dick Boyle C. I. Grimes M. N. Shulman S. S. Bajwa NUTECH Kaiser Eng.

J. S. Creswell BNL Dave Ogden George Maise John D. Ranlet Franklin Research Center William A. Segraves i

L l