Forwards IE Insp Repts 50-338/82-09 & 50-339/82-09 on 820405-09.No Noncompliance Noted
ML20053B444
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/06/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20053B445 List:
References
NUDOCS 8205280411
Download: ML20053B444 (2)


See also: IR 05000338/1982009

Text

Md

'

-

y

.

MAY - 61982

Virginia Electric and Power Company

ATTN:

Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gen t l er..en :

Subject:

Report Nos. 50-338/82-09 and 50-339/82-09

_

This refers to the routine safety inspection conducted by Mr. E. H. Girard

of this office on April 5-9,

1982, of activities authorized by NRC License

Nos. NPF-4 and NPF-7 for the North Anna facility and to the discussion of our

findings held with Mr. W. R. Cartwright, Station Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

Three new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

8205280 MR

k

ZEol 5 ,

.

o-

.

Virginia Electric and Power Company

2

MAY - 61982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-338/82-09

and 50-339/82-09

cc w/ encl:

P

G. Godwin', Director, Nuclear Security

J. it. Ferguson, Executive

Vice President

W. R. Cartwright, Station Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

Commonwealth of VirgiMa

i

[

'

6

t

'

a

,

E Girard:ht

>/ARHerdt

j/6 /82

Klandis

HCDance