ML20053B361

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/82-07 & 50-425/82-07 on 820311-0410.No Noncompliance Noted
ML20053B361
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/27/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20053B362 List:
References
NUDOCS 8205280332
Download: ML20053B361 (2)


See also: IR 05000424/1982007

Text

.

.

.

APR 2 7199g

I

Georgia Power Company

ATIN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject: Report Nos.<$@[82-07_ and 50-425/82-07

This refers to the routine safety inspection conducted by Mr. W. F. Sanders of

this office on March 11, 1982 - April 10, 1982 of activities authorized by NRC

Construction Permit Nos. CPPR-108 and CPPR-109 for the A. W. Vogtle facility and

to the discussion of our findings held with H. H. Gregory, Construction Project

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

One new unresolved item result (d from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

i

Should you have any questions concerning this letter, we will be glad to discuss

l

them with you.

Sincerely,

/

ff/!

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

i

j

Resident Programs

Enclosure (See page 2)

l

8205280332

q

SGol * /

-

.

O

Georgia Power Company

2

APF 2 7 1932

Enclosure:

Inspection Report Nos. 50-424/82-07

and 50-425/82-07

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

License Fee Management Branch

State of Georgia

RII

RII

RII

RII

p

j)L

VBrd,!f, lee

g) f

A

WSanders:gr

JKogge

wn

RDance

4/f/82

4/

82

4/}u/82

441/82