Forwards IE Insp Repts 50-250/82-07 & 50-251/82-07 on 820301-05 & 08-12 & Notice of Violation
ML20053B329
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/05/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20053B314 List:
References
NUDOCS 8205280295
Download: ML20053B329 (2)


See also: IR 05000250/1982007

Text

y fem

,

.

,

DR 5 1982

Florida Power and Light Company

ATTN:

Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject:

Report Nos. 50-250/82-07 and 50-251/82-07

This refers to the routine safety inspection conducted by Messrs. G. A. Belisle,

P. E. Fredrickson, and P. H. Skinner of this office on March 1-5 and 8-12, 1982,

of activities authorized by NRC Operating License Nos. DPR-31 and DPR-41 for

the Turkey Point facility.

Our preliminary findings were discussed with

Mr. H. E. Yaeger, Site Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to a previously reported

unresolved item. The status of this item is discussed in the enclosed report.

One new unresolved item is identified in the enclosed inspection report.

This

item will be examined during subsequent inspections.

As discussed in paragraph 6 of the enclosed report, temporary procedures are not

being issued under the same requirements as permanent procedures. This area was

discussed by Messrs. J. Hayes, D. Jones, G. Belisle, and P. Skinner on March 11,

1982.

It is our understanding, based on this conversation, that the mechanism

for issue of temporary procedures will be changed by May 1,1982 to reflect the

same review and approval requirements as permanent procedures.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

8205280654

.

.

.

Florida Power and Light Company

2

APR

5 1982

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/82-07

and 50-251/82-07

cc w/ encl:

H. E. Yaeger, Site Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

RII

IJ

RII

RII

i

RII

Th

(lM

N

GA@Belisle:ht

'

C.

right

ARHerdt

K

'n is

FJLong

& .ph /82

$/

82

4/g /82

efff//82

4/2-/EI2

1