Text
y fem
,
.
,
DR 5 1982
Florida Power and Light Company
ATTN:
Dr. R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
Gentlemen:
Subject:
Report Nos. 50-250/82-07 and 50-251/82-07
This refers to the routine safety inspection conducted by Messrs. G. A. Belisle,
P. E. Fredrickson, and P. H. Skinner of this office on March 1-5 and 8-12, 1982,
of activities authorized by NRC Operating License Nos. DPR-31 and DPR-41 for
the Turkey Point facility.
Our preliminary findings were discussed with
Mr. H. E. Yaeger, Site Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to a previously reported
unresolved item. The status of this item is discussed in the enclosed report.
One new unresolved item is identified in the enclosed inspection report.
This
item will be examined during subsequent inspections.
As discussed in paragraph 6 of the enclosed report, temporary procedures are not
being issued under the same requirements as permanent procedures. This area was
discussed by Messrs. J. Hayes, D. Jones, G. Belisle, and P. Skinner on March 11,
1982.
It is our understanding, based on this conversation, that the mechanism
for issue of temporary procedures will be changed by May 1,1982 to reflect the
same review and approval requirements as permanent procedures.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
8205280654
.
.
.
Florida Power and Light Company
2
APR
5 1982
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-250/82-07
and 50-251/82-07
cc w/ encl:
H. E. Yaeger, Site Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Florida
RII
IJ
RII
RII
i
RII
Th
(lM
N
GA@Belisle:ht
'
C.
right
ARHerdt
K
'n is
FJLong
& .ph /82
$/
82
4/g /82
efff//82
4/2-/EI2
1