ML20053B279
| ML20053B279 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/27/1982 |
| From: | Dance H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20053B280 | List: |
| References | |
| NUDOCS 8205280245 | |
| Download: ML20053B279 (2) | |
See also: IR 05000348/1982010
Text
'
I. .
.
.
pfR 2 7 N
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 3529,
cantlemen:
Subject: Report Nos.
/8I-10 ' and 50-364/82-09
This refers to the routine safety inspection conducted by Mr. W. H. Bradford of
this of fice on March 16 - April 15, 1982, of activities authorized by NRC
Operating License Nos. NPF-2 and NPF-8 for the Farley facility and to the
discussion of our findings held with Mr. W. G. Hairston, Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
\\
Sincerely,
-,
d$O
W
H.C.'(Dance, Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
Inspection Report Nos. 50-348/82-10
and 50-364/82-09
cc w/ enc 1: See page 2
8205280S h 62
1601://
.
..
o
2
APR 4 7 bd2
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. G. Ware, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Alabama
RII
RII
RII
RII
4
\\/L0
,f#
(U3
gt
WBradford:dt
JRogge
VBrownlee
C4 c
4/g82
4/)T82
4/ V82
4/z7/82
7
.