t
4,
0FFICIAL RECORD COPY
-
.
APR 2 91982
Mississippi Power and Light Company
ATTN: Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject: Report No. 50-416/82-20
This refers to the routine safety inspection conducted by Mr. A. L. Cunningham of
this office on April 14-16, 1982, of activities authorized by NRC Construction
Permit No. CPPR-118 for the Grand Gulf Nuclear Station and to the discussion of
our findings held with C. K. McCoy, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consirted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you hve any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosure:
Inspection Report No. 50-416/82-20
cc w/ encl (See page 2)
820 5 2 8 0,L y/
4
T6ol j
-.
C.
APR
' 1982
- -
)
.
Mississippi Power and Light Company
2
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bec w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of Mississippi
RII
RII
RII
RII e 73
RII
,8
hb
- ([
b
Q*
ALCunningham:gr
DMMontgomery
RCButcher
JPStohr
FJLjo g
W
4/27/82
4/ V82
4/Z /82
4/3/82
4/25/82
3