Text
k
s
.
,
APR 2 71%2
Florida Power and Light Company
ATTN:
Dr. R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
fliami, FL 33152
Gen tlemen:
Subject:
Report Hus. 50-335/82-12 and 50-389/82-14
This refers to the routine safety inspection conducted by fir. S. A. Elrod of this
office on 11 arch 11 - April 10,1982, of activities authorized by NRC Operating
License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie
facility and to the discussion of our findings held with Mr. C. ft. Wethy and
B. J. Escue, Plant flanagers, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/frmk
H. C. Dance, Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
Inspection Report Nos. 50-335/82-12
and 50-389/82-14
cc's (See page 2)
8205280$33
Q
16Di>g
,
f
.
.
Florida Power & Light Company
2
APR 2 71982
cc w/ encl:
C. fl. Wethy, Plant Manager
N. Weems, Assistant QA
Construction fianager
B. J. Escue, Plant fianager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Florida
I
i
l
RII
RII
.
RII
RII r'
I
l
od:dt
K ndis
in
HCDance
4/ 1/82
4/p /82
4/ (/82
4/g\\/82
'
g
7
9