ML20053B221

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Undocumented Section of Pipe & Welds in C-E Gas Stripper,Initially Reported 811121.No New Info or Change to Rept.Complete Rept to Be Submitted by 820920
ML20053B221
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/14/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20967-GHD, DER-81-39, NUDOCS 8205280189
Download: ML20053B221 (2)


Text

..

___.._.m

.. S,-,

Y$

YYYY

$VYY $bS YY P. O. B O X 216 6 6 PHOENIX art 2ON A 85036 May 14, 1982 ANPP-20967-CIID/BSK U S Nuclear Regulatory Commission Creekside Oaks Office Park 1450 Maria Lane - Suite 210

,y Walnut Creek, California 94596-5368 x

Th, o-Attention:

Mr. T. W. Bishop, Chief 9

n Reactor Construction Projects Branch E

nEl

> rn Subj ect:

Time Extension for Report - DER 81-39 3

!j1 A 50.55(e) Potentially Reportable Deficiency Relating g

to Unit #1 Cas Stripper by CE Has Undocumented Section m

of Pipe and Welds in Violation of ASME Code to File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on November 21, 1981 l

(B) ANPP-19646, dated December 9, 1981 (Interim Report)

(C) ANPP-20011, dated January 28, 1982 (Time Extension)

(D) ANPP-20618, dated April 5, 1982 (Time Extension)

Dear Sir:

{

I The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and time exten-l sions were requested by References (C) and (D). At that time, it was i

estimated that a Final Report would be available by June 8, 1982.

i Due to the extensive iraestigation and evaluation required, it is now expected that this information will be finalized by September 20, 1982, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly ours,,

Cc\\

1 m

l C - C. \\, cLLt nm G

E. E. Van Brunt, Jr.

8205280l%9 APS Vice President g

Nuclear Projects ANPP Project Director EEVBJr/GHD:ske 0

cc: See Attached Page 2 D-I2%

U. S. Nucicar Regulatory Commission Attention:

Mr. T. W. Bishop, Chief ANPP-20967-CIID/BSK May 14, 1982 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. IIawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Ilarmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503