Confirmatory Action Ltr Re Agreements Made During 820514 Mgt Exit Interview Following Emergency Preparedness Insp. Corrective Actions Required:Description of Personnel Who Can Respond in 30 to 60 Minutes During Off Shift Hours
ML20053B177
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/21/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
CAL, NUDOCS 8205280143
Download: ML20053B177 (2)


Text

CONFlRMATORY ACTION LE' ITER 4

s MAY 2 1 082.

Docket No. 50-409 Dairyland Power Cooperative ATTN:

Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:

This letter is to confirm agreements reached between Mr. J. Taylor, Assist-ant General Manager, and others of your staff, and Mr. J. A. Pagliaro and other members of the NRC staff on May 14, 1982, during the management exit interview following the NRC Emergency Preparedness inspection.

Immediate corrective actions are required for Significant Inspection Findings. The exact nature of the required actions, as well as the agreed upon dates for such actions are as follows:

Shift Staffing 1.

The licensee shall describe by position / title the number of personnel who can respond to the site in thirty and sixty minutes during off-shift hours and the job qualifications or performance capabilities of each of these individuals to meet the position described in NUkEG-0654, Table B-1.

This shall be completed by June 16, 1982.

2.

The licensee shall describe the method by which he can assure notifi-cation of the staff such that they can augment the on-shift staff within thirty and sixty minutes. This method shall include provisions for thirty and sixty minute augmentation on holiday weekends.

This shall be completed by June 16,, 1982.

8205280l'13 F

Le.

2

, /

r-CONFIRMATORY ACTION LETTER e

w Dairyland Power Cooperative 2

3.

Administrative tests or drills shall be conducted to demonstrate that the thirty and sixty minute shift augmentation pursuant to NUREG-0654 can be met.

This shall be completed by July 1, 1982.

4.

The licensee shall submit a report to the NRC, Region III Regional Administrator by July 1, 1982, describing the results of all of the above actions.

If our understanding of your planned actions described above is not in accordance with the actual plans and actions being implemented, please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Sincerely, Original signed by, A. Bert Davis James G. Keppler Regional Administrator cc:

R. E. Shimshak, Plant Superintendent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief Boiler Section Stanley York, Chairman Public Service Commission l