Advises That Proposed Change to Tech Spec Surveillance Requirement 4.1.3.1 Approved.Changes Necessary & Adequate to Support Tech Spec Change 37
ML20053B132
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/17/1982
From: Barrett L
Office of Nuclear Reactor Regulation
To: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20053B133 List:
References
CON-NRC-TMI-82-027, CON-NRC-TMI-82-27 NUDOCS 8205280097
Download: ML20053B132 (1)


Text

9 y 's DISTRIBUTION G

_ Decket No. 50-320 g

NRC PDR Local PDR RECEtVED P

gg 201982D-TERA

~

)

TMIP0 HQ r/f wisianos TMI Site r/f s

" uma8 # "

LBarrett ac e

May 17, 1982 g

AFasano NRC/THI-82-027 RBellamy ft Docket No. 50-320 ey, ELD IE ACRS h"

Mr. John J. Barton e

Acting Director TMI-2 GPU Nuclear Corporation P.O. Box 480 Middletown, PA 17057

Dear Mr. Barton:

Subject:

Recovery Operations Plan Change No. 13 (Control Mechanism Energization)

The Nuclear Regulatory Commission staff has reviewed your Recovery Operations Plan Change Request No. 13, dated April 8,1982 (4400-82-L-0049).

The change request proposed that in verifying at least once per seven days that control rod drive mechanisms are de-energized, exceptions be made for a single mechanism when it is energized in accordance with NRC approved procedure (s). Following completion of a rod movement test, the affected rod drive mechanism shall be verified de-energized within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

You stated that this change request supports Technical Specification Change No. 37, which requests allowing the energization of individual con +.ral assembly mechanisms.

The staff agrees that these changes are necessary and adequate to support Technical Specification Change No. 37. We have therefore, approved the proposed change in surveillance requirement 4.1.3.1.

For clarity we have changed the word mechanism to the plural (mechanisms).

A cop," of Change No.13 to the Recovery Operations Plan is enclosed.

dq Lake H. Barrett Deputy Program Director TMI Program Office

Enclosure:

As stated cc: See Service Distribution List 8205280 077 (,

o"'ah T jP0 TMIP0 g,

TMIP smah,hp,ie[e,:js RRBellamy LH r

.. /.k/.82..

.5/.h82 82.

mnc ronu na nosoi sacu mo OFFICI AL RECORD. COPY

___