Forwards IE Insp Rept 50-423/82-05 on 820412-16.No Noncompliance Noted
ML20053A725
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/14/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20053A726 List:
References
NUDOCS 8205270197
Download: ML20053A725 (2)


See also: IR 05000423/1982005

Text

T

v

, f ., p . n 1

. y

.

i

MAY l 4 1982

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operation's Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/82-05

This refers to the routine safety inspection conducted by Mr. A. Finkel of

this office on April 12-16, 1982 at the Millstone Nuclear Power Station, Unit

3, Waterford, Connecticut of activities authorized by NRC License No. CPPR-113

and to the discussions of our findings held by Mr. Finkel with Mr. Diedrick of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, measurements made by the inspector, and observations

by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Dacument Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the require-

ments of 2.790(b)(1).

The telephone notification of your intent to request

j

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

l

incerely,

3W?

origivl31L7-

homas T. Martin, Director

Division of Engineering and Technical

,

s

Programs

(

f

Enclosure:

NRC Region I Inspection Report Number 50-423/82-05

0FFICIAL RECORD COPY

f'

8205270

M1

'/

q

i

-

.

.

Northeast Nuclear Energy Company

2

cc w/ encl:

K. W. Gray, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. G. Diedrick, Manager of Quality Assurance

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Oper ational Support Section (w/o encl)

T. C. Elsasser

h

Y

kY

/lb

Y

b:DETP

R1:DETP

Finkel/wb

Ebneter

5/10/82

y

b\\ y

/

OFFICIAL RECORD COPY