ML20053A725
| ML20053A725 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/14/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20053A726 | List: |
| References | |
| NUDOCS 8205270197 | |
| Download: ML20053A725 (2) | |
See also: IR 05000423/1982005
Text
T
v
, f ., p . n 1
. y
.
i
MAY l 4 1982
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operation's Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-423/82-05
This refers to the routine safety inspection conducted by Mr. A. Finkel of
this office on April 12-16, 1982 at the Millstone Nuclear Power Station, Unit
3, Waterford, Connecticut of activities authorized by NRC License No. CPPR-113
and to the discussions of our findings held by Mr. Finkel with Mr. Diedrick of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, measurements made by the inspector, and observations
by the inspector.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Dacument Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require-
ments of 2.790(b)(1).
The telephone notification of your intent to request
j
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
l
incerely,
3W?
origivl31L7-
homas T. Martin, Director
Division of Engineering and Technical
,
s
Programs
(
f
Enclosure:
NRC Region I Inspection Report Number 50-423/82-05
0FFICIAL RECORD COPY
f'
8205270
M1
'/
q
i
-
.
.
Northeast Nuclear Energy Company
2
cc w/ encl:
K. W. Gray, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat, Manager, Generation Facilities Licensing
D. G. Diedrick, Manager of Quality Assurance
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Oper ational Support Section (w/o encl)
T. C. Elsasser
h
Y
kY
/lb
Y
b:DETP
R1:DETP
Finkel/wb
Ebneter
5/10/82
y
b\\ y
/
OFFICIAL RECORD COPY