MISSISSIPPI POWER Ah3 LIGHT COMPANY MIDDLE SOUTH ENERGY, INC.
SOUTH MISSISSIPPI ELECTRIC PO'fER ASSOCIATION GRAND GULF NUCLEAR STATION, UNIT NO.1 DOCKET NO. 50-416 ORDER EXTENDING CONSTRUCTION COMPLETION DATE Mississippi Power and Light Company, Middle South Energy,-Inc.,
and South Mississippi Electric Power Association are the holders of Construction Permit No. CPPR-ll8 issued by the Atomic Energy Commission
- on September 4,1974 and extended on October 30, 1979, for the construction of the Grand Gulf Nuclear Station, Unit No.1, which is presently undei-construction at the Middle South Energy, Inc. site in Claiborne County.
Mississippi. On January 8,1982, Mississippi Power and Light Company, on behalf of itself and as agent for Middle South Energy, Inc. and South Mississippi Electric Power Association, requested an extension of the construction completion date for Grand G.s.f, Unit No.1 because construction has been delayed due to the following factors:
1.
Problems with pre-operational testing.
2.
Final inspection and quality assurance work.
3.
Assuring that all applicable NRC requirements are met, including
~
those resulting from the TMI-2 accident.
- Effective January 19, 1975, the Atomic Energy Commissinn became the Nuclear Regulatory Commission and Permits in effect on that day were continued under the authority of the Nuclear Regulatory Commission.
820524b436 820503 PDR ADOCK O500041b A
.P.DR--
omy NRc FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY a m mi-m uoi
g-k m.
m m -~
ya a.
cw
,r m
, y --
3 sy 9
g g
y y
. This action involves no significant hazards consideration; good cause has been shown for the delays; and the requested extension is for a reasonable period. The staff's conclusions are set forth in the staff's evaluation of the request for extension.
The Commission has determined that this action will not result in any significant environmental impact and, pursuant to 10 CFR 51.5(d)(4),
an environmental impact statement, or negative declaration and environmental impact appraisal, need not be prepared in connection with this action.
The NRC staff evaluation of the request for extension of the construc-tion permit is available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C.
20555 and at the Hinds Jr. College, George M. McLendor Library, Raymond, Mississippi 39154.
IT IS HEREBY ORDERED THAT the latest completion date for CPPR-ll8 is extended from March 1,1982 to November 1,1982.
FOR THE NUCLEAR REGULATORY COMMISSION Robert A. Purple, Deputiy Director Division of Licensing Office of Nuclear Reactor Regulation N0 M2 Date of Issuance:
P Dh1 GNAT RIGINAL
\\
- See previous concurrences on next page.
0l.i.B#2/,L,A D,L,: LB #2/ P,M, D,L,:LB,#2[BC,
,, 0, ELD,,,,,,,, pt. AD/L.
.DU l
"'c'>
E,l,1 1, ton : kw DHo,us to,n A,S,c,hwen,c,er,,,
MWagner,,,,
, R,L,Te d e s c o,,,,,
D,,,, s e,,,,u t,,,
"^"'>
7,
,, fy82
- >. 3/.2 3/8,2,,,,,3/2,3/82,,,,
,,,3 /,2,3 f,82,,,,,,,,,,,4/s/82 4
,,,/2/,82 4
NRC FOR*4 318 410s BO) NRCM O240 OFFIClAL RECORD COPY
'" ' w32n2$
ii$'
C w
Q,
.This action involves no significant hazards consideration; good cause has been shown for tihe 3elays; and the' requested extension is for a reasonable period, the basisMr which are set forth in the aff's
~
evaluation of the request for extension.
The Commission has determined that this action wi 1 not result in any significant environntental impact and, pursuant to 10 CFR 51.5(d)(4),
\\
/
an environmental impact statement, or negative declaration and environmental x
impact appraisal, need not be prepared in connect on with this action.
The NRC staff evaluation of the reqbest for/
extension of the construc-tion permit is available for public inspection /
at the Commission's Public
'/
Document Room,1717 H Street, N.W., Washington, D.C.
20555 and at the
\\
HindsJr. College,GeorgeM.McLendorLib./ary,\\ aymond, Mississippi 39154 R
IT IS HEREBY ORDERED THAT the lates completion date for CPPR-ll8 is extended from March 1,1982 to Novembe /
1,1982.
F,0R THE NUCLEAR REGULATORY COMMISSION Darrell G. Eisenhu, Director Division of Licensi'ng Office of Nuclear Reactor Regulation Date of Issuance:
l I
1]IA D0Dft) f.
a omer >.D.L,;,L,B,#,.,(6,,,,D,L:LB#2 PM, DL
],B.C..
,,9,E L D..
. DL.;.a
.L.,
, DL : DJ.13.,,
sunscr> f.!I
.. ;..W...
. D.
. 0 0.....
hS.C.b.W. 9.0.c.RC.. $.:. I E. M.-
T.
.e.S.c.0..
. 0.M.i.S.enh.4.t...
.../.f..).3.../82 3/.... 82
..p..../.g/. 82... '
1/.82
/ /82
..../.p.../.. 2 3
3 ore >
OFFICIAL RECORD COPY usa m e _3A m j Nnc ronu sia nown NRCM 0ao