ML20052J012
| ML20052J012 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/26/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20052J013 | List: |
| References | |
| NUDOCS 8205240312 | |
| Download: ML20052J012 (4) | |
See also: IR 05000397/1982006
Text
_ _ _ _ _ _
_
.,
%
-
.
4
C;Q
.
,.
Q
W
,-
.
-
,
APR 261981
Docket No. 50-397
Washington Public Power Supply System
P. O. Box 968
Richland Washington 99352
Attention: Dr. R. G. Matlock
Program Director
Gentlemen:
Subject: NRC Inspection
This refers to the inspection conducted by Messrs. A. D' Angelo, R. Dodds,
J. Elin, and D. Fox of this office on March 1-5 and 15-19,1982 of activities
authorized by NRC Construction Permit No. CPPR-93, and to the discussion of
our findings held with Mr. C. S. Carlisle and other members of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter. Such application
must be consistent with the requirements of 2.790(b)(1).
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely.
lEO;
8205240312 820426
T. W. Bishop. Acting Chief
(I
PDR ADOCK 05000397
Reactor Construction Projects Branch
G
_
" ' " > ...?.h.'
... N ....
........0000
BISDOP
.6
.
.... k. ... ..
.. . .
F
.
.
.. .
->
. 9."U
.?.' ^.".G {0
.
..
.,
,, , , , ,
,
, ,,
_
,
, ,,
,
, , ,
, , g82
4/4jaz
4/ 7,/82
,
,
,, ,
,
""> ..4/.9/82
. .a//82
4
4
,9 ,
, ,,,,,
, , , ,
,
usc ronu aie no.soinscu ono
OFFICIAL RECOFiD COPY
' " ' + 32"2 4
-
.
.
Washington Public Power Supply System
-2-
-
ppq .; g gg7
Enclosure:
IE Inspection Report
No. 50-397/82-06
cc w/o enclosure:
C. S. Carlisle, Deputy Program Director
R. B. Glasscock, Quality Assurance Director
bec:
DMB/ Document Control Desk (RIDS)
Distributed by RV:
State of WA (Lewis)
resident Inspector (2)
Engleken (ltr)
.
_ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _
[{'
o,,,
UNITED STATES
+
g
NUCLEAR REGULATORY COMMISSION
s
j
REGION V
b;
4
1450 MARIA LANE. SUITE 260
% *,*... '
,o
WALNUT CREEK, CAUFORMA 94596
April 26,1982
Docket No. 50-397
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Dr. R. G. Matlock
Program Director
Gentlemen:
Subject: HRC Inspection
This refers to the inspection conducted by Messrs. A. D' Angelo, R. Dodds,
J. Elin, and D. Fox of this office on March 1-5 and 15-19,1982 of activities
authorized by NRC Construction Permit No. CPPR-93, and to the discussion of
our findings held with Mr. C. S. Carlisle and other members of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter. Such application
must be consistent with the requirements of 2.790(b)(1).
Should you have any questions concerning this inspection, ue will be glad
to discuss them with you.
Sincerely,
C~
F.'u.I '
T. W. Bishop, Acting Chief
Reactor Construction Projects Branch
l
-
._
..-
.
.-
-
.- .
- - _ -
- - _-,
.
..
.
..
- - . .
.
.
1
i
'
Washington Public Power Supply System
-2-
April 26,1982
.
i
i
Enclosure:
IE Inspection Report
,No. 50-397/82-06
4
cc w/o enclosure:
,
C. S. Carlisle, Deputy Program Director
'
j
R. B. Glasscock, Quality Assurance Director
i
i
$
i
i
+
.
l
.!.
I
k
'
-
.
I
i
i.
f
!
!
,
.
1
i
.
.'
. - .