Forwards IE Insp Rept 50-397/82-06 on 820301-05 & 15-19.No Noncompliance Noted
ML20052J012
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/26/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20052J013 List:
References
NUDOCS 8205240312
Download: ML20052J012 (4)


See also: IR 05000397/1982006

Text

_ _ _ _ _ _

_

.,

%

-

.

4

C;Q

.

,.

Q

W

,-

.

-

,

APR 261981

Docket No. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland Washington 99352

Attention: Dr. R. G. Matlock

Program Director

Gentlemen:

Subject: NRC Inspection

This refers to the inspection conducted by Messrs. A. D' Angelo, R. Dodds,

J. Elin, and D. Fox of this office on March 1-5 and 15-19,1982 of activities

authorized by NRC Construction Permit No. CPPR-93, and to the discussion of

our findings held with Mr. C. S. Carlisle and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1).

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely.

lEO;

8205240312 820426

T. W. Bishop. Acting Chief

(I

PDR ADOCK 05000397

Reactor Construction Projects Branch

G

PDR

_

" ' " > ...?.h.'

... N ....

........0000

BISDOP

.6

.

.... k. ... ..

.. . .

F

.

.

.. .

->

. 9."U

.?.' ^.".G {0

.

..

.,

,, , , , ,

,

, ,,

_

,

, ,,

,

, , ,

, , g82

4/4jaz

4/ 7,/82

,

,

,, ,

,

""> ..4/.9/82

. .a//82

4

4

,9 ,

, ,,,,,

, , , ,

,

usc ronu aie no.soinscu ono

OFFICIAL RECOFiD COPY

' " ' + 32"2 4

-

.

.

Washington Public Power Supply System

-2-

-

ppq .; g gg7

Enclosure:

IE Inspection Report

No. 50-397/82-06

cc w/o enclosure:

C. S. Carlisle, Deputy Program Director

R. B. Glasscock, Quality Assurance Director

bec:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

resident Inspector (2)

Engleken (ltr)

.

_ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _

[{'

o,,,

UNITED STATES

+

g

NUCLEAR REGULATORY COMMISSION

s

j

REGION V

b;

4

1450 MARIA LANE. SUITE 260

% *,*... '

,o

WALNUT CREEK, CAUFORMA 94596

April 26,1982

Docket No. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Dr. R. G. Matlock

Program Director

Gentlemen:

Subject: HRC Inspection

This refers to the inspection conducted by Messrs. A. D' Angelo, R. Dodds,

J. Elin, and D. Fox of this office on March 1-5 and 15-19,1982 of activities

authorized by NRC Construction Permit No. CPPR-93, and to the discussion of

our findings held with Mr. C. S. Carlisle and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1).

Should you have any questions concerning this inspection, ue will be glad

to discuss them with you.

Sincerely,

C~

F.'u.I '

T. W. Bishop, Acting Chief

Reactor Construction Projects Branch

l

-

._

..-

.

.-

-

.- .

- - _ -

- - _-,

.

..

.

..

- - . .

.

.

1

i

'

Washington Public Power Supply System

-2-

April 26,1982

.

i

i

Enclosure:

IE Inspection Report

,No. 50-397/82-06

4

cc w/o enclosure:

,

C. S. Carlisle, Deputy Program Director

'

j

R. B. Glasscock, Quality Assurance Director

i

i

$

i

i

+

.

l

.!.

I

k

'

-

.

I

i

i.

f

!

!

,

.

1

i

.

.'

. - .