Forwards IE Insp Rept 50-460/82-07 on 820405-09 & Notice of Violation
ML20052H986
Person / Time
Site: Washington Public Power Supply System
Issue date: 05/03/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Root R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20052H987 List:
References
NUDOCS 8205240276
Download: ML20052H986 (2)


See also: IR 05000460/1982007

Text

.

m

s

,m

e

?r

o

a

.

y

. ;; y

g -

y

,4:

wins J

1931

Docket No. 50-460

k'ashington Public Power Supply System

P. O. Box 968

3000 George Washington Way

Richland, Washington 99352

Attention: Mr. R. W. Root

Acting Program Director, WMP-1

Gentlemen:

Subject: NRC Inspection of Washington Nuclear Projects 1

This refers to the routine inspection conducted by Mr. Narbut of this office

on April 5-9, 1982 of activities authorized by NRC Construction Permit No.

CPPR-134, and to the discussion of our findings held by Mr. Narbut with

Mr. Root and other members of your staff at the conclusion of the inspection.

treas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

ased on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with 'IRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the provisions

of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

8205240276 820503

O'

PDR ADOCK 05000460

h\\h

O

_

omer >

RV/do;

/

,'

,

g,

,

,

,

, ,

, , ,,

,

sua~4wr>

,'N RBUT 4 DDS

SHOP

,,,

,

, ,, ,

,

,,

,

, , ,

,,

, , , , ,

^ " > i. .

4d'/ 32 ,, g g, .

gg,82

4

82

.

,,

,,

, , , ,

,,,, ,

,,

,, ,

,

,,

qc ronu aie no somscu o240

OFFICIAL RECORD COPY

' um um-aan2

)

L

MAY 3

1982

-

Pashington Public Power fupply System

-2-

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of "anagement and Budget

as required by the Daperwork Reduction Act of 1980, PL 96-511.

Sincerely,

.::" n.1.L S1Gqn in

.

R. T 000"5

T. !!. Bishop, Acting Chief

Reactor Construction Projects Branch

Enclosures:

A.

Notice of Violation

9.

IE Inspection Report

No. 50-460/82-07

cc w/o enclosure R:

R. B. Glasscock, t.PPSS

bcc:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

RHE (w/o enc B)

A. Johnson (w/o enc B)

Resident Inspector

Project Inspector

j