Text
.
m
s
,m
e
?r
o
a
.
y
. ;; y
g -
y
,4:
wins J
1931
Docket No. 50-460
k'ashington Public Power Supply System
P. O. Box 968
3000 George Washington Way
Richland, Washington 99352
Attention: Mr. R. W. Root
Acting Program Director, WMP-1
Gentlemen:
Subject: NRC Inspection of Washington Nuclear Projects 1
This refers to the routine inspection conducted by Mr. Narbut of this office
on April 5-9, 1982 of activities authorized by NRC Construction Permit No.
CPPR-134, and to the discussion of our findings held by Mr. Narbut with
Mr. Root and other members of your staff at the conclusion of the inspection.
treas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
ased on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with 'IRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this notice is to be submitted in accordance with the provisions
of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days
of the date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1).
8205240276 820503
O'
PDR ADOCK 05000460
h\\h
O
_
omer >
RV/do;
/
,'
,
g,
,
,
,
, ,
, , ,,
,
sua~4wr>
,'N RBUT 4 DDS
SHOP
,,,
,
, ,, ,
,
,,
,
, , ,
,,
, , , , ,
^ " > i. .
4d'/ 32 ,, g g, .
gg,82
4
82
.
,,
,,
, , , ,
,,,, ,
,,
,, ,
,
,,
qc ronu aie no somscu o240
OFFICIAL RECORD COPY
' um um-aan2
)
L
MAY 3
1982
-
Pashington Public Power fupply System
-2-
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of "anagement and Budget
as required by the Daperwork Reduction Act of 1980, PL 96-511.
Sincerely,
.::" n.1.L S1Gqn in
.
R. T 000"5
T. !!. Bishop, Acting Chief
Reactor Construction Projects Branch
Enclosures:
A.
9.
IE Inspection Report
No. 50-460/82-07
cc w/o enclosure R:
R. B. Glasscock, t.PPSS