Wi May 14, 1982 4
Qo 0
MEMORANDUM FOR: Comissioner Ahearne f
. 4p/ b;Dc r3 1
8 FROM:
William J. Dircks V
Executive Director for Operations 4
yi
SUBJECT:
DEFINITION OF STANDARDIZED PLANT In your memorandum dated May 3,1982, you requested that the staff coment i
on the potential problems associated with the definition of a standardized plant as:
1 "an essentially complete final design for a whole nuclear power plant intended for use at multiple sites,"
~
and suggest any modifications to that definition.
We perceive two potential problems with this definition; first, the extent t
to which the desfgn should or can ba "whole" and, second, whether the design must be " intended" for use at multiple sites.
I With respect to the phrase "whole nuclear power plant," the prop (both NSSS osed defini-tion would appear to exclude standard reference system designs l
i and 80P) that are currently permitted in the Commission's policy statement l
of August 31, 1978 and 10 CFR 50, Appendix 0, since they are only designed e
for portions of a plant.
In addition, there are some structures and systems that must be designed for site specific characteristics (e.g., water intake structuresandassociatedcondensatecoolingsystem)and,therefore,there is a limit to the extent to which the design can be "whole." We believe f
that the sxtent to which a standardized plant design, for the purposes of the Act, must be for a whole plant is a policy decision for Commission con-sideration.
From a technical standpoint, the more "whole" the design is, the better since this would reduce the safety significance and number of interface problems that must be considered by the applicant and the staff.
With regard to the second potential problem, if the design must be
" intended" for use at multiple sites, then replicate plants would appear to be excluded from the coverage of the Act. Replication is also currently permitted by the Commission's policy statment of August 31, 1978, and there l
has been an ongoing interest by the industry to retain this option.
If the Commission intends to permit replication under the proposed Act, then explicit provisions would probably have to be included in the body of the f[O, Act as well as the definition of a standardized plant.
}
1A) y GO e
l
~ T205240011 820514
~
PDR COMMS NRCC j.
CORRESPOfCENCE PDR
Commissioner Ahearne Related issues have been raised with the Commission previously in the context of the severe accident policy, a revised version of which is expected to be submitted shortly.
ni n@ William J.Dircks rikT1amJ.Dircks Executive Director for Operations cc:
Chairman Palladino Commissioner Gilinsky Commissioner Roberts J. Tourteliotte OPE OGC SECY Revised in 0/EDO.
DL/NRR NRR ED0 CGrimes HDenton WDircks 5-11-82 5-11-82 5-14-83
Distribution:
Document Control TERA NRC PDR DL:L Rdg Tedesco/ Berry CGrimes Eisenhut/ Purple MJambor ELD SCavanaugh MBridgers (ED0 11827)
IE WJDircks KCornell RMinogue GCunningham PFine Denton/ Case PPAS SHanauer RMattson RVolliner HThompson PCheck BSnyder
i j'
.g.
~,
l i
l FROM:
_ ACTION CONTROL DATES l CONTROL NO idId2 ra c. /*hr ece OF' oce.NowLE ac M ENT
</
DATE OF DOCUMENT
?NTERIM REPLY E;.]
IO:
PREPARE FOR SIGNATURE OF:
~~
p,p g g g
. INAL. REPLY
/
f,
,/-
O CHAIRMAN a
';lLE LOCATION
/
y EXECUTIVE otRECTOR
.b/ f h OTHER:
DESCRIPTION O LETTER [jMEMO O R E PO R T C OTHER SPECI AL INSTRUCTIO'n CR PF. MARK!
bcu,95t comnts o.9 Cefinition of MICRITY Stsnianttrol P13ct y
A CLASSIFIED DATA OOCUMENT/C$NNo. l CLASSlFICATIONl
'4UMUE.st OF PAGLS
}
kFI AL HrGIST RY No.
~
CATEGORY O NSI O Ro O rRo ASSIGNED TO:
DATE INFORMATION ROUTING LEG AL REVIEW D FitJAL U COPY fiM W L M2
- A N' DlTCki CSSO/DGAt0R
^ '"
^"
T\\FY:
AL OBJECTIONS
-sisenhut -
5/4/"
UNIl P. Fine
-4.-Vellter O coo noMisa. CORRes ea
_T;.rl e%
I/4/:W RChR 1.
PPAS
-5.--E^i:-.
4nmc; GN14 NID0 M 2.
Ilansun COMMENTS, NOTIFY:
g O.ec Othm 3
yg,ttstggt%OTif MADON RECOMMENDED:
c_..._
m i
cr,rgn,y.yt 0 Yts O NO NRC mnM m EXECUT;VE DIRECTOM f04'. OPERATIONS DO NOT 17EMOVE THIS ' COPY PRINCIPAL CORRESPONDENCE CONTROL