Monthly Operating Rept for Apr 1982
ML20052H239
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20052H236 List:
References
NUDOCS 8205200096
Download: ML20052H239 (6)


Text

., .

  • l

+ .

OPERATING DATA REPORT i DOCKET NO. 50 -369 DATE 5-15-82 COSIPLETED BY J. A. Reavis TELEPil0NE 704-373-8552 OPERATING STATUS McGuire #1 N"$

1. Unit Name:

April 1, 1982 - April 30, 1982

. Reporting Period:

3. Licemed Thennal Power d!WI):

3 411

4. Nameplate Itating (Grow MWei.

1 220

5. Doign Electrical Rating (Net alWei: 1 180
6. Maximum Dependable Capacity (Grow 51We):
7. Masimum Dependable Capacuy (Net MWe):

S. If Changes Occur in Capac:ty Ratings litems Number 3 Through 7)Since Last Report.Gise Reasons:

. 9. Power Level To Which Restricted. lf Any (Net MWe):

10. Reasons For Restrictions. If Any.

This Month Yr..to Date Cumulative i1. Ilours in Repvrting Penod 719.0 2 879.0 3 623.0

12. Number Of li.mn Reactor Was Critical 704.3 2 287.3 2 333.0
13. Reactor Resene Shutdown linurs
14. Ilours Generator On Line 695.5 2 263.0 2 308.7
15. Unit Resene Shutdown llours
16. Gross Thermal Energy Generated OlWil) 1 192 627 4 051 201 4 136 156 .
17. Gross Electrical Energy Generated OlWil) 408 960 ,

1 368 551 1 396 987 IS. Net Electrical Energy Generated (MWii) 382 958 1 275 987 l'295 043

19. Unit Senice Factor 96.7 78.6 63.7
20. Unit Assilability Factor 96.7 78.6 63.7
21. Unit Capacity Factor (Using MDC Neti 45.1 37.6 30.3
22. Unit Capacity Factor (Using DElt Net) 45.1 37.6 30.3
23. Unit Forced Outace Rate 3.3 21.4 36.3
24. Shutdowns Scheduled Oser Nest 6 \lonths(Type. Date.and Duration of Facht;

- Stonm conorator Eddy Current Testing - 3 weeks - June 20

25. If Shut Down At End Of iteport Perind. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operaimnl: Forecast Achiesed

-lNITi \ L Cit!TICA LITY INITI A L l'.LEC l RICI f Y CO\lMI.ItCIA L Ol'Elt A IlON

.8205200096 B20515 PDR ADOCK 05000369 0 PDR en/77)

- y ..

DOCKET NO. 50-369 IJNIT McGuire #1 DATE 5-15-82 AVERAGE DAILY UNIT POWER LEVEL MONTil April, 1982 AVERAGE DAILY POWElt LEVEL AVERAGE D AILY POWER LEVEL DAY (MWe net) DAY (MWe-net) ,

552 37 555 1

557 18 sss 2

558 554 3 19 1

554 20 552 4

551 21 ssa 5

550 22 551 6

552 23 499 7

8 552 24 551 25 501 9

553 26 ssa 10 553 27 561 11 564 28 560 12 _

568 29 559 13 I 563 30 553 14 556 31 15 558 16 DAILY UNIT POWER LEVEL FOR\1 INSTRUCTIONS On this fonn, list the aserage daily unit power lesel in MWe net for each day in the reporting n.onth.

Compute to the nearest wnole megawatt.

These Ogures will I e used to plot a graph for each reporting month. Note that by using maximum dependable capseity f or stie net electrical ratin; of the unit there may be n easions when the daily average power lese' enceils the ItU hoe (or tlie restrhted power lesel huel. In such cases, the average daily unit pawer output sheet should be footnoted to tsplam the apparent anomaly.

DOCK ET NO.

50-369 UNITSilUll) OWNS AND i'OWER REDUC 110NS 1, UN!1 NAME McGuire DATE 5-15-82 COstPLETED ltY L A. h vis RI.POR r MONTil April

  • 1982 TELEPflONE 704-373-8552 i

"h

, 3E 'k 25's Licensee ,E-r, , Cause A Corrective N" - Dat e i 5? 4 isE Event a7 9. ] Atinin to

$5 5 jdj Report c (E U 5' Prevent Reeurtente Q

6-p 82-04-01 F --

H --

CB HTEXCH Reduced to 50% power awaiting further analysis of steam generator condition.

10 82-04-23 F 23.47 A 3 CH INSTRU While reducing power for tech. spec.

requirement, the feedwater pump trip-ped due to discharge pressure set

  • point trip being too low.

7-p 82-04-24 F --

H --

CB HTEXCH Holding at 50% power awaiting further' analysis of steam generator condition.

I 2 3 4 F: Entced Reamn: Method: Extiibit G - Instructions S. Sdicduled A Eilinpinen. Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance oi Test 2 Manual Scram. Entry Sheets for I.icensee C-Refueling 3 Autoniatic Scram. lisent Report (1.ER) Fi!e (NURI.G-D Regulatory Restriction 4-Ot her (lixplain) Of tili I: Ope.ator Training & License lixamination F Administrative 5 G Opciational la ror (Ihplain ) Estnbit I .Saine Sousee l')/77) II-Oilier iINplain)

DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: May 15, 1982 NARRATIVE

SUMMARY

Month: April, 1982 McGuire 1 began the month of April at 50% power awaiting further analysis of the steam generator condition.

}.

)

On April 23, while reducing power because of a tech. spec. requirement, the feed-water pump tripped due to the discharge pressure setpoint trip being too low. This caused a unit trip. Setpoint corrections were made and the unit was returned to service on April 24, and increased to 50% power continuing the recainder of the month.

1 1

ii l

f l

I 1

1-t a, ,,---%.r .

.,,e---- - - . - , . - - . . . ~ , , , , . - , p yy

MONTHLY REFUILING INFOR.'!ATION REOUEST

1. Facility name: McGuire Unit 1 ,

June, 1983 2.

Scheduled next refueling shutdown: .

3. Scheduled restart following refueling: .
4. Will refueling.or resumption of operation thereafter require a technical specification change or other license a=endment? .

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

If no, when is review scheduled? N/A .

5. Scheduled date(s) tor submitting proposed licensing action and supporting info rma tion: N/A ,
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
7. Number of fuel asse=blies (a) in the core: 193 .

(b) in the spent fuci pool: 27 ,

8. Present licensed fuel pool capacity: 500 ,

Slae of requested or planned increace: .

9. Projected date of last refueling which can be accoccodated by present licensed capacity:

4 DUKE POWER COMPANY Date: May 15, 1982 Name of

Contact: