ML20052H202
| ML20052H202 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/10/1982 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20052H200 | List: |
| References | |
| NUDOCS 8205200058 | |
| Download: ML20052H202 (3) | |
Text
,
UNACCEPTABLE
.0PERATION
-- 120
(-26.88,112)
(22.4,112)
- -10 c,
ACCEPTABLE 1
4 PUNP
(-45,100)
OPERATION
- -100 (38,100)
(-26.88.88.92)
(22.4,88.92)
- - 90 88.92 ACCEPTABLE
- - 80
(-45,76.92)
}
OPERAT Di
-- 70
(-26.88,62.22)
(22.4,62.22) 62.22 ~
~
3 ACCEPTABLE
(-45,50.22) 2,3 & 4 PUMP
- - 50 (38,50.22)
OPERATION
-- 40
- - 30
-- 20
- ~
-- 10 t
i i
t i
i i
i i
i i
-60
-50
-40
-30
-20
-10 0
10 20 30 40 50 60 Reactor Power Imualance, '4 CURVE REACTOR COOLANT FLOW (GPN) 1 374,880 2
280,035 J:
3 184,441 CORE PROTECTION SAFETY LIMITS l
Figure 2.1-2
\\
- gu -
8205200050 003 3 PDR ADOCK 0 PDR P
. :7
.e n
- N g
2500
. s.
..s P = 2300 PSIG T = 618 F Lh 2300
, su go.
ACCEPTABLE
/
_ E.
OPERATION 5
2100
- ~
0
~
P = (11. 75 Tout 5103)PSIG mt.
2 O
"~
f 1900 B
M UNACCEPTABLE 5!
OPERATION P = 1800 PSIG 1700 1500 560 580 600 620 640 660 Reactor Outlet Temperature, F
. /-
PROTECTIVE SYSTEM MAXIMUM ALLOWABLE SETPOINT Figure 2 3-1 i
- 143 -
THERMAL POWER LEVEL S
,p UNACCEPTA8LE
. 120 OPERATION
(-1,1 5. 4)
~~I
~
M = 0. 7833 (8.105.4) 105.4
- - 100 ACCEPTABLE
(-30,91.3) 4 PUVP OPERATION
_ _ 90 (24 91 1)
(-12.78.73) -
80 (8,78.73) 78.73 ACCEPTABLE
.- 70
(-30,64.63) 3 g 4 pyyp (24,64.43)
OPERATION
-- 60
(-12,51.05)
(8,51.85) 51.85
- ~ 50 ACCEP TA8LE
(-30,37.75)
/
2,3 & 4
-- 40 (24 37 55)
PUMP OPERATION
-- 30
- - 20 Z
m
- - 10 n n
n n
m i
I t
I l
I I
I I
I I
-60
-50
-40
-30
-20
-10 0
10 20 30 40 50 60 Power imoalance, 5 PROTECTIVE SYSTEM MAXIMUM ALLOWA8LE SETPOINTS Figure 2.3-2 4
- 14b--