I o nerg#
/
UNITED STATES l
['
'i NUCLEAR REGULATORY COMMISSION g
.j WASHINGTON D. C. 20555
\\*..../
j VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-339 I
NORTH ANNA POWER STATION, UNIT NO. 2 i
l i
AMENDMENT TO FACILITY OPERATING LICENSE i
I I
Amendment No. 22 License No. NPF-7 f'
t 1.
The Nuclear Regulatory Commission (the Commission) has found that:
I l
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated February 17, as revised March 18, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Paragraphs 2.C.(15), 2.C.(15)(h)(2) and 2.C.(15)(h)(4) of Facility Operating License NPF-7 are hereby amended to read as follows:
2.C.(15) Prior to resuming power operation following the first refueling outage except as specifically noted in para-graphs (h)(2) and (h)(4) below:
l 8205190005 820503 PDR ADOCK 05000339 P
PDR e
L
. 2.C.(15)(h)(2) "The lube oil system shall be modified to the manufacturer's recommendations for providing continuous lubrication of the lower portions of the engine. The modifications shall further provide for partial filling of the upper lube oil supply header and a lube oil booster /accum-ulator system which will force oil into the upper lube oil header during engine startup. The modi-fications shall be completed no later than the October 1982 Fall maintenance outage."
2.C.(15)(h)(4) "The fuel oil storage and transfer system shall be modified to include,the installation of a separate high level alarm for each day tank, the installation of independent pressure switches for each pump which will be set to stop the pumps on high day tank level, and the submittal of Technical Speci-fications verifying proper operation of all transfer pump control switches and day tank high level alarms.
The modifications shall be completed no later than the October 1982 Fall maintenance outage."
3.
This license amendment is effective as cf the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Fw Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance: May 3, 1982 l