ML20052G829
| ML20052G829 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/14/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Clayton F ALABAMA POWER CO. |
| References | |
| TASK-1.A.2.6, TASK-TM NUDOCS 8205190038 | |
| Download: ML20052G829 (3) | |
Text
- - _ _ _
...[
L.
q f
t 7
4 s
DISTRIBUTION
)
gg ) 41982 Docket NRC PDR L PDR NSIC
,,9 / [-
ORB #1 Rdg DEisenhut Docket Hos. 50-348
['n 4\\
OELD and 50-364 J[ r} 3gg ACRS-10 IE
~f kT w a q
prj g g!
CParrish
!!r. F. L. Clayton "QL g e.
EReeves
~
y} g ]
g Gray Senior Vice President Alabama Power Company 0;
Y j
s Post Office Box 2641 4
Bfrningham, Alabama 35291 o
Dear Mr. Clayton:
Pursuant to the NRC Task Action Plan I.A.2.6(4), the Division of Human Factors Safety (DHFS) has contracted with Battelle-Pacific Northwest Laboratory to conduct and evaluate regional workshops as a method of obtaining reactor operator feedback on selected issues of concern to both the NRC and the operator.
Two workshops havt already been completed under this project: Workshop I, (Region III) Chicago, Illinois, December 8-9, 1981; and Workshop II, (Region I)
Bostcn, l'assachusetts, March 16-17, 1982. The issues discussed by the operators at these workshops included:
(1) plant drills, (2) the role of the STA, (3) strengths of and improvements to the operator licensing process, (4) simulator training, and (5) requalification. The quality of the feedback from these two workshops has been extrenely good. The operators have been very participative in thesc two-day sessions and their connents have had some inpact on current issues.
The third operator feedback workshop is being planned for Region II and is to be held on May 25-26 in Atlanta, Georgia, at the Century Inn - 1996 Phoenix Boulevard, College Park, Atlanta. The topics for discussion will be:
1.
HRC Policy on Overtime 2.
Operator Licensing Examination (guidelines, requalification) 3.
Requirement for a Second SP0 on Shift as of July 1,1982.
The intent of these workshops is to develop a mechanism whereby licensed reactor operators can communicate directly with the NRC. This would include R0s, SR0s, and Shift Supervisors.
If possible, we would like to have one or two of your licensed shift personnel attend these neetings in Atlan' 4.
You should also be aware that participation is voluntary both on the part of the utility and the operators.
8205190038 820514
~
o PDR ADOCK 05000348 sua V PDR
............ ~
... ~. ~ ~ ~..
DATEf OFFICIAL REC ORD COPY
'""*-**2*
nac ronu ais.io so> nacu o24o
.f' 4
4 Hr. F. L. Clayton Since Battelle is responsible for conducting theco workshops for the NRC, they will bc contacting you directly. Battelle will send specific information regarding the content of Workshop III to those operators who will be attending.
If there are any questions concerning the topics for discussion, the workshop process, or the facility arrangements, please discuss them with Battelle when they contact you or call J. Persensky, the NRC monitor, at 301/492-8349.
Sincerely,)
Originst signed b Steven A.pga,
Steven A. Varga, Chief Operating Reactors Branch fl Division of Licensing cc: See next page t
i l
l
@ E.9L 98@.T f
ancEt
([.,.b.
.b..
.I SURNAME)
/-
4....
.o.5.. 2.u..
o41= >
NRC FORM 318 (10-80) NRC 02c OFFICIAL RECORD COPY usa,o.i
,_m..
f' Mr. F. L. Clayton, Jr.
Alabama Power Company cc: tir. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabana 35291 Ruble A. Thomas, Vice President Southern Company Services, Inc.
Post Office Box 2525 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Robert A. Buettner, Esquire Balch, Binghan, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street l
Dothan, Alabama 36303 l
l Resident Inspector U. S. Nuclear Regalatory Commission Post Office Box 24-Route 2 Columbia, Alabama 36319 i
Mr. R. P. Mcdonald Vice President - Nuclear Generation l
Alabama Power Company l
P.O. Box 2641 Birmingham, Alabama 35291 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 l
l I
f
,.