Advises That 810908 Final Deficiency Rept Re Beam to Column Connection Design in Reactor Containment Bldg Lacks Sufficient Corrective Action Info.Final Rept Should State Scope of Design Error & Design Inputs
ML20052G763
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/26/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20052G764 List:
References
NUDOCS 8205180653
Download: ML20052G763 (2)


Text

r-en

/

y' kn&-

n..

h*.

%s is 9:

b W-5 October 26, 1981 Dockets: 50-498 50-499 Houston Lighting & Power Company ATTN: Mr. G. W. Oprea, Jr.

Executive Vice President Post Office Box 1700 Houston, Texas 77001 Gentlemen:

Thank you for your letter of September 8,1981, submitting your " Final Report Concerning Beam to Column Connection Design in the Reactor Containment Building."

From our myiew of the submitted report, we find that you have not provided sufficient information to pemit analysis and evaluation of the corrective action as required by 10 CFR Part 50.55(3). Specifically, since the finalization of specific design loads, the completion of the reanalysis, and the completion of the redesign and modification efforts have not been completed, your report lacks finality, in that it does not include the results of the as yet to be completed actions. This lack of detail is brought to 11ght in the following example. You state that since the internal steel columns were designed initially to carry only vertical and local eccentric loads, the horizontal seismic loads will be transferred to the Secondar,d9 Shield wall and the concrete floors. It is not clear whether the design of the Secondar be affected by the imposition of the additional'dy Shield wall or the floors will loads. The same question arises from the proposed application of the Reactor Containment Fan Cooler Duct Design Pressure Load to the Secondary Shield wall.

Your final mport, in addition to addressing the proposed modifications, should state the scope of the design error, the design inputs which have finally been considered and the msultant stresses and safety margins which have been assured.

Specific design calculations and modification details should remain available for review by this office during a follow-up inspection.

Sincemly.

original signed te

w. c, srJoui*

l W. C. Seidle, Chief

~

3 Engineering Inspection Branch j

8205180

/

t

...EM[ll.d

..... R S.-3..f...RRS....Cd..,,.ETR...

.,I,ES..

"'c'>

... EMS..

REHa WACrossman GLMadsen WCSei e JEG liardok TCollins

su m rp JITa a/nh

......f.

"I Nac rouw ais no somacu uno OFFICIAL RECORD COPY

  • ** 'so-329 824

r

'/

f

  • ,{ ex,-gr.

aan.c, g y - g n j.e n n >V, W y, ** R 'z vP ct s + "1

-y-

--. f m e-s y c r<y--

* ~q -W y*=_ v s* *

t

.~

4 v

e-g 1.

1.

7

.,o

-x e

.g_ x

. gg

,s.

_. f Houston Lighting and Power

' Company ~

bec to DMB for dist.

bcc dist. by RIV BC NRR/DHFS Texas Dept. of Health Resources PM NRR/0LB RRI-South Texas AE00 RAD ASMT BR ELD RESEARCH IE FILE LPDR IE/RPRIB NSIC NRC PDR OFFIC E k...............

SURNAwEk DATEk sac resu ais no sc> nacu 02ao -

OFFICIAL RECORD COPY

.- - - 329 24