ML20052G707

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Incorrect Drawings for Reactor Pressure Vessel.Reactor Pressure Vessel Will Be Inspected Using Proper Locations for Intermediate Shell Longitudinal Welds
ML20052G707
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/29/1982
From: Tarkey R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82-618-000 PT21-82-618, PT21-82-618-000, RSEP-82-824, NUDOCS 8205180590
Download: ML20052G707 (2)


Text

. . _ -. ._ . .

s USNRC REGION ATLANTA GEOPdia Carolina Power & Light Company 82 MAY 2 A9: 0 9 H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE B0X 790 HARTSVILLE, SOUTH CAROLINA 29550 APR 2 01982 Robinson File No: 13520A Serial: RSEP/82-824 i

Mr. James P. O'Reilly Regional Administ'_ator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET 50-261 LICENSE NO. DPR-23 10CFR21 5-DAY REPORT

Dear Mr. O'Reilly:

The attached form provides the information required by 10CFR21 for the 5-day written report. Results of the reactor pressure vessel inservice inspection vill be report}ed under separate cover at the end of the inspection.

If you have any questions concerning this letter, please contact me.

4 Very truly yours,

[ [ld R. B. Starkey, .

General Manager H. B. Robinson SEG Plant FMG/bs Enclosure cc: R. C. DeYoung (2)

R. A. Hartfield CIAL COPY 8205180 510 l&/7 s

///

4 Enclosure to Serial: 'RSEP/82-824 Page 1 of 1

  • - NRC - 10CFR21 NOTIFICATION FORM Robinson File No.13520A Report Date: April 29,1982 CAROLINA POWER AND LIGHT COMPANY H. B. ROBINSON SEG PLANT, UNIT NO. 2 POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 1

Docke t No. 50-261 License No. DPR-23

1. Nature of defect or failure to comply:

l The as built drawings for the Reactor Pressure Vessel (RPV) are incorrect which is )

a deviation in the requirement of the reactor pressure vessel procurement document.

2. Date Identified: April 24, 1982 i

4

3. Basic component information (if applicable):
a. Supplier: Combustion Engineering j

)

i b. Component Quantity: On e t

c. Where Located: Reactor Pressure Vessel

't

4. Na ture of the defect or failure to comply and the safety hazard which was or could be created:

During construction of the RPV the intermediate shell was rotated 15' with respect to the lower shell. This resulted in the intermediate shell longitudinal welds being located in a different position than specified on the RPV drawings. This error in the as built drawings could result in failure to inspect the longitudinal welds during the inservice inspection of the RPV which could allow flaws (if any were to exist) in the welds to go undetected.

5. Advice related to the defect or failure to comply received from supplier:

The vendor recommended that the drawings be updated. Since this defect only ef fects the ISI program which the vendor is not a part of, no other recom-mendation was made.

6. Corrective action that was, is, will be taken; and length of time that has been or will be taken to complete the action: (Attach additional sheets as necessary.)

The Reactor Pressure Vessel will be inspected using-the proper locations for tia intermediate shell longitudinal welds. This inspection will be completed during the 1982 refueling outage.

+

Submitted By:

/1d c /[ld/mt< Plant General Manager