Interim Deficiency Rept Re Fisher Pressure Regulating Valves Supplied by C-E,which Do Not Meet Design Pressure Requirements on Downstream Side.Final Rept Will Be Submitted by 820604
ML20052G528
Person / Time
Site: Palo Verde  
Issue date: 05/03/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20852-GHD, NUDOCS 8205180438
Download: ML20052G528 (2)


Text

Docket No. 50-528/529/530

.i' 50.55(e) Report

'g;'<i'G[)

l y;p fg

?

.l,yl (D D T s $ $53?Zg pg.

2PGtW3D EDM21FJDali kWEGYD18%

P. O. B O X 216 6 6 PHOENIX, ARIZON A 85036 L': Q m...

~

May 3,1982 ANPP-20852-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. T. W. Bishop, Chief Reactor Construction Projects Branch Subj ect:

Time Extension for Report - DER 81-44 A 50.55(e) Potentially Reportable Deficiency Relating to Fisher Pressure-Regulating Valves Supplied by Com-bustion Engineering Do Not Meet Design Pressure Require-ment on Downstream Side File:

82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on November 23, 1981 (B) ANPP-19769, dated December 23, 1981 (Interim Report)

(C) ANPP-20319, dated March 5, 1982 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A). An Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by May 4, 1982.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by June 4, 1982, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

? 2. % %dm E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GH'J: skc cc: See Attached Page 2 82051809 gj_fg

. = -

U. S. Nucle.ag gegulatory Commission Attention:

Mr.

T. W. Bishop, Chief ANPP-20852-Gild /BSK May 3, 1982 Page 2 cc:

Richard DeYoung, Director i.

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission l

Washington, D. C.

20555 l

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham 4

R. L. Patterson i

R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 t

i jn w

-,-