"C 0 R R E C T I O N" OPERATING DATA REPORT O
DOCKET NO.
Kn ??O DATE
< / A /R7_
-C05fPLETED BY t u on TELEPilONF. (315) 343-21 0 X1383 OPERATINC ST.*.TUS I. Unit Name:
Nine Nile Point Unit #1 Not*5
- 2. Reportia; Period:
04/01/82 to 04/30/82 1850
.. Licensed Therms! Power (31WC):
- 4. Nameptste Rating (Gross 51We):
- 5. Desi;n Electrical Rating (Net $1We):
- 6. >!aximuru Dependable Capacity (Gross MWe):
630
- 7..\\taximum Dependable Capacity (Net AlWe):
610 S. If Chs::;es Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
~
m.
- 9. Power Level To Whi:h Restricted,if Any (Net $1We):
- 10. Ressons For Restrictions.lf Any*
This 5!onth Yr..to.Dat e Cumulatise
- 11. Hcurs la Reportin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Resetor Was Critics!
0.0 1874.0 81,3us.s
- 13. Resetor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hourc Generstor On Line 0.0 1872.5 78,562.3
- 15. Unit Resen Shutdown Herr 0.0 0.0 20.4
- 16. Cross Therrnst Ener;y Ger.umd (.'. WH) 0.0 3,421,093.0 129,374,390.0
- 17. Gmn Electri:sl Ever;y Genersted D1WH) 0. 0. _. 1.169.791.0 42.743,090.0 J
- 15. Net Ziectriesi Energy Genrrsted (.\\1WH) 0.0 1:134.758.0 41,392,651.0
- 19. Cnu Seni:e r:ctor 0.0 65.0 71.7
- 20. '.*ni:.*.s:!!:b?: :y Fs::ar 0.0 65.0 71.7 2:. '.*r:: C:;:s:i:y Fs::or (ini.:;.'.*CC :*es) 0.0 64.6 61.9
- 22. C:iit Capacity Facter(Usine DER Net) 0.0 63.6 61.0
- 23. Unit Forced Outs;e Rate 100.0 31.8 9.1
-U
' ~
. Shutdowus Sclieduled Over Next 6.\\1unths (Type. Date.s:.C Dur.:tiaa of Esch::
24
- 25. If Shut Down At End Of I.cpurt Period. Estimated Date of Startup:
Meh 1983_
I
- 26. Uras in Test Status (Prior to Commereis! Operatiu.0:
Foreen:
Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY CO\\t.\\lERCIA L Ol'CRATION 820518cic s t
,,y,
"C 0 R R E C T I O N".
OPERATING DATA REPORT DOCKET NO.
KO 220 DATE c; / A /R7_
-CO.\\!PLETED BY - rw on TELEPilONF. (315) 343-21 0 X1383 OPERATING ST/.TUS
- i. Unit Name:
Nine htile Point Unit #1 Notes
~
04/01/82 to 04/30/82
- 2. Reporting Period: _. _ _
1850 2 Licensed Therms! Power OlWt):
D*
- 4. Namep!ste Rating (Gross atWe):
ozu
- 5. Desi;n Electrical Rating (Net atWe):
- 6..staximum Dependable Capacity (Gross htWe):
630
- 7. 51s.simum Dependsble Capscity (Net SIWE):
610 S. If Chst:;es Occur in Capacity Rstings (Icems Number 3 Through 7)Since Last Report.Give Ressorts:
- 9. Power Level To which Restricted,if Any(Net 51We):
~~
- 10. Reasons For Restrictions.If Any:
.O.
This 51onth Yr..to.Date Cumuisth e I1. Mcurs In Reportin; Period 720.0 2880.0 109,536.0
- 12. Number of Hours Resetor Was Crities!
0.0 1874.0 81,30s.d
- 13. Res: tor Resene Shutdown Hours 0.0 0.0 1,204.2
- 14. Hourt Generator On.Line 0.0 1872.5 78,562.3
- 15. L* nit Resene Shutdown Heur 0.0 0.0 20.4 I6. Cross Therms! Encr;y Ger.cated (.'.;WH) 0.0 3,421,093.0 129,374,390,o
- 17. G*nss Electri:al Er er;y Gerersted f.\\lWH)
QJ._.
1.169.791.0 42,743,090.0
- 16. Het Electri:si Ener;y Genersted (.\\tWH) 0.0 1;134,758.0 41,392,651.0
- 19. Cmt Seni:e r:cto:
0.0 65.0 7i.7
- 20. '.'ni: *':2:5?h:y Fs::s:
0.0 65.0 71.7 2:. '.fr : C:;:::i:y Fs: tor (Ush:;.'.;00 ct) 0.0 64.6 61.9
- 22. C::it Capacitv Facter(Usin: DER Net!
0.0 63.6 61.0
~
- 23. Unit Furced Outage Rate 100.0 31.8 9.1
- 24. Shutdowns Scheduled Oier Ne.st 6 Stunths tType. D.ste.si.c' Duration of Esch::
l
- 25. If Shut !>own At End Of I.eport Period. Estimsted Date of 5:srtup:
Mn-r-h 1983 7
l
- 26. Lh:> In Test Status Irrior su Commereis! Operati.. 0:
Forecast Achiesed INITIAL CRITICA LITY INITtA L ELECTl!! CITY CO\\t.\\tERCIAL OPCRATION 4
03/ 0 3 i
1
"C 0 R R E C T I O N" i
OPERATING DATA REPORT O
DOCKET NO.
Kn ??O DATE 9/4/e7.
-CO.\\!PLETED !!Y T t*
en TELEPilONF. (315) 343-21 0 U383 O PERA TING ST *.TUS J. Unit Name:
Nine Nile Point Unit #1 Not*5
- 2. Reportin; Period:
04/01/82 to 04/30/82 1850 Licensed Therms! Power (31Wt):
04U
- 4. Nameptare Rsting (Gross 51We):
- 5. Design Electrical Fating (Net alWe):
s
~
- 6..\\!ssimum Dependsble Capacity (Gross htWe):
630
- 7..\\fsximum Dependsble Capseity (Net atWe):
610 S. !! Chst:;es Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power LevelTo Which Restricted,If Any(Net.\\tWe):
- 10. Ressons For Restricticas.If Any:
This.\\!onth Yr to-Date Cumulo:is e
- 11. Hcurs In Reportin; Pen. d 720.0 2880.0 109,536.0 e
- 12. Number Of Hours Resetor Was Crities!
0.0 1874.0 81,305.d
- 13. Res tor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Fiouri Generstor On.Line 0.0 1872.5 73,564.4
- 15. Ur:!! Resene Shutdown Heur!
0.0 0.0 20.4
- 16. Cross Th:rms! Ener;y Ger.caud (.*.;WH) 0.0 3,421,093.0 129,374,490,o
- 17. G nss Electri:al Ener;y Generated f.\\1WH)
QA,.
1.169.791.0 42,743,090.0
- 15. Net Electrir.si Ener;y Generated (.\\1WH) 0.0 1:134,758.0 41,392,651.0
- 19. Cmt Senice F:ctor 0.0 65.0 71.7
- 20. '.".-!:
- t-!!:5:! :y Fs::ar 0.0 65.0 71.7 2:. L*:. : C:ps:i:y Fs: tor (IAi::;.*.;00 : ct) 0.0 64.6 61.9
- 22. C: tit Capacity Facter IUsic; DER Net) 0.0 63.6 61.0
- 23. Unit Forced Outs;e Rate 100.0 31.8 9.1 l
- 24. Shutdemns Scheduled Oser Ne.st 6.itunths tType. Date.si.C Dur.:tiaa uf Esels::
1
[
- 25. If Shut !)uwn At End Of I.epart Period. Estimsted !bre of *tsrtup:
Ma ve h, 1983 1
- 26. Um:> In Test Status (Prior to Commereist Operariu.0:
Forecast Achiesed INITIA L CRITICA LITY INITIAL CLECTRICITY CO\\l.ilERCIA L UPCRATION O
l I
2
i
~.
i "C 0 R R E C T I O N" OPERATING DATA REPORT DOCKET NO.
'in _"2 20 DATE c / A /St? __
-CO.\\!PLETED BY
'w on TELEPl!ONF. (315) 343-21 0 X1383 OPERATING ST/.TUS I. Unit Name:
Nine Nile Point Unit #1 Not*5
- 2. Reporting Period:
04/01/82 to 04/30/82 1850
- Li:ensed Thenna! Power (31Wt):
04u
- 4. Namepbre Rating (Gross 5tWe):
04U
- 5. Desi;n Elec ical Rating (Net blWe):
- 6. 31ssirnum Dependsble Capacity (Gross htWe):
630
- 7. 31srimum Dependsble Capacity (Net AIWe):
610 S. If Changes Occur in Capscity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
T
- 9. Pow er Level To Whi:h Restricted,If Any(Net 51We):
- 10. Ressons For Restrictions.lf Any:
~
's This.\\!onth Yr..to.Da t e Cumulatise
- 11. Heurs in neportin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Resetor Was Critica!
0.0 1874.0 si, Jus.s
- 13. Res: tor Resene Shutdown Hours 0.0 0.0 1,204.2
- 14. Hour < Generator On.Line 0.0 1872.5 78,564.3
- 15. Unit Resene Shutdown He:::,
0.0 0.0 20.4
- 16. Cross Therms! Energy Ger.eisted (.*.!'.','H) 0.0 3,421,093.0 129,374,390.0
- 17. G nss Electrical Erer;y Genersted f.\\lWH)
QJ.
1.169.791.0 42.743,090.0 15.14ct Ziectri:si Ener;y Genersted (.\\lWH) 0.0 1:134,758.0 41,392,651.0 l
- 19. Unit Seni:e r::ter 0.0 65.0 71.7
- 20. '.*n!:.'.u!h5!! :v Fs::ar 0.0
-65.0 71.7 2. * *.-!: Cs;:s:I:y Fs: tor (I' sis:;.'. OC :'ct) -
0.0 64.6 61.9
- 22. C: tit Capacity FacterIUsin: DER Net) 0.0 63.6 61.0
- 23. Unit Forced Outs;e Rate 100.0 31.8 9.1
- 24. ShutJou ns Sclieduled Oser Next 6 Stunths tType. Date,as.C Dur.:ti.m uf Escht:
- 25. If Shur Down At End Of 1.eport Period. Estimated Date urStsrtup:
Afa rr h 1983 1
- 26. Crats in Test Status (Prior io Commereis! Operstiu.il:
Forecast Achiesed INIT! tl CRITICA LITY INITIAL ELECTI ! CITY COitalERCIAL OPCRATION 0
('8 E l s
"C 0 R R E C T I O N" OPERATING DATA REPORT p%./
Kn.'??n DOCKET NO.
DATE C /6 /M
-C051PLETED BY tw on TELEPilONF. (315) 343-zl 0 X1383 CPER ATING ST/.TUS I. Ur:it Name:
Nine Nile Point Unit #1 Not*5
- 2. Reportin; Period:
04/01/82 to 04/30/82 1850 Li:ensed Thermal Power (31Wt):
04U
- 4. Nameplate Rating (Gross 51We):
- 5. Desi;n Electrical Rating (Net SIWE):
- 6..staximum Dependable Capacity (Gross alwe):
630
- 7..\\lsrimum Dependable Capacity (Net SIWE):
610 S. If Chan;es Occur in Capacity Rstings (items Number 3 Through 7) Since Last Report. Give Reasons:
7
- 9. Power Level To Whi:h Restricted,if Any (Net.\\lWe):
- 10. Reasons For Restrictions.lf Any:
e.--
This 5!onth Yr to.Date Cumuistive
/
- 11. Hcurs In neportin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Reseror Was Critical 0.0 1874.0 81,30s.s
- 13. Reseror Reserve Shutdown Hours 0.0 0.0 1,204.2 I4. Hours Generator On.Line 0.0 1872.5 78,562.3
- 15. Unit Resene Shutdown He::
0.0 0.0 20.4
- 16. Cross Therms! Ener y Ger.usted (.'.lWH) 0.0 3,421,093.0 129,374,390.0
- 17. G nss Electrie:I Er er;y Ger ersted (51WH)
QJ._ 1.169.791.0 42.743,090.0
- 16. Nc Electri:si Energy Genersted (alWH) 0.0 1:134.758.0 41,392,651.0
- 19. Una Seni:e r:ctor 0.0 65.0 71.7
- 20. '.'ni:
- t:!!:b ! :v F:::ar 0.0 65.0 71.7 2;. ', r.:: C:ps:i:y Fs: tar (Usi::;'.;0C :! )
0.0 64.6 61.9
- 22. Unit Capacity Facter IUsin; DER Net) 0.0 63.6 61.0
- 23. Unit Forced Outage Rate 100.0 31.8 9.1
- 24. Shutdowns Scheduled Oser Nest 6 alunths IType. Date.st.d Dur.:tiaa of Esch::
g
- 25. If Shut !)own at EnJ Of I.cpurt Period. Estimsted thre of Stsrtup:
Mai r h 1983 7
- 26. Lm:, In Test Status IPrior to Commereis! Operatiu. ):
Forecss Achiesed INITIAL CRITICALITY INITIAL ELCCTRICITY CO\\l.\\lERCIA L Ol'CRATION O
I I
"C 0 R R E C T I O N".
OPER ATING DATA REPORT O
DOCKET NO.
en 220 i
DATE
< / A / R')07
-COS!PLETED BY rw TELEPilONE (315) 343-21 0 X1383 G ?E R ATING ST.?.TUS
- i. Unit Name:
Nine Nile Point Unit #1 Notes
~
- 2. Reportin;: Period:
04/01/82 to 04/30/82 1850
.. Li:ensed Thermal Power (31Wt):
- 4. Nameplate Ratins (Gross AlWe):
- 5. Design Electrical Rating (Net blWe):
- 6..\\laximum Dependsble Capsdty (Gross hlwe):
630
~
- 7..\\fsrimum Dependsble Capacity (Net AlWe):
610 S. !f Chs..;es Occur in Capscity Rstings (Iterns Number 3 Through 7) Since Last Report.Give Ressons:
- 9. Power Level To Whi:h Restricted,If Any(Net.s!We):
- 10. Reasons For Restrictions.If Any:
This.\\!onth Yr to.Dste Cumulstise I1. Mc.;rs In Reportin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Rescror Was Critics!
0.0 1874.0 81,305.s
- 13. Res: tor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Ho:ars Generator On.Line 0.0 1872.5 78,56Z.3
- 15. Unit Mesene Shutdown He. r 0.0 0.0 20.4
- 16. Cros: Therms! Energy Ger.cated (a;'.'.*H) 0.0 3,421,093.0 129,374,390.0
- 17. (;ms: Electries! Erer;y Generated DlWH)
QJ_.
1.169.791.0 42,743,090.0
- 15. Net Electri:si Energy Generated (alWH) 0.0 1:134,758.0 41,392,651.0
- 19. Unit Senice F:ctor 0.0 65.0 71.7
- 20. '."..!:.'.t:!!:bi! :y F:::s:
0.0 65.0 71,7 2:. '*:.!: Cs;:s:i:y Fs: tor (Unit:;.'.;DC :*ct) 0.0 64.6 61.9
~
- 22. Unit Capacity l~seter lUsin: DER Net!
0.0 63.6 61.0
- 23. Unit Forced Outi;e Rate 100.0 31.8 9.1
- 24. Shutdowns Scheduled Oser Next 6 Stunths IType. Date.si.C Duratina uf Each::
- 25. If Shur !>own A End Of !.eport Period. Estimsted Date of Startup:
Mu,.h 1983.
7
- 26. Ci: : In Test Sistus IPrior to Commercial Operaniu.il:
Furecast Asidesed INITML CRITICA LITY INITIA L ELECTI:! CITY CO\\talERCIAL OPERATION C
bl I
~
"C 0 R R E C T I O N".
OPERATING DATA REPORT DOCKET NO. _ c;n-220 DATE
< / A / 9 7_
f
-COh!PLETED BY rw om TELEPilONF. (315) 343-1 0 11303 OPERATINC ST/.TUS I. Ur.it Name:
Nine Nile Point Unit #1 Notes
- 2. Reporting Period:
04/01/82 to 04/30/82 1850
.. Licensed Thenns! Power (31Wt):
04U
- 4. Namepiste Rating (Gross 51We):
beu
- 5. Design Electrical Rstin;(Net blWe):
~
- 6. ?!aximum Dependsble Capscity (Gross AIWe):
630
- 7. 3!s.simum Dependsble Capacity (Net AlWe):
610 S. !! Chsn;es Occur in Capscity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons:
- 9. Power Level To Whi:h Restricted,If Any(Net 51We):
- 10. Reasons For Restrictions.If Any:
a--
This S!onth Yr..to-Ds t e Cumuls ise
- 11. Hcurs In neportin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Rescror Was Critics!
0.0 1874.0 81,30s.d
- 13. Res tor Resene Shutdown Hours 0.0 0.0 1,204.2
- 14. Hourt Generator On.Line 0.0 1872.5 78,562.3
- 15. C :it Resene Shutdown Ho rt:
0.0 0.0 20.4
- 16. Cross Therms! Enct;y Ger.ustad (a:WH) 0.0 3,421,093.0 129,374,390.0
- 17. C ass Electri:sl Erer;y Gerersted falWH)
Qd_.
1.169.791.0 42,743,090.0
- 16. Net Electriesi Ener;y Genersted (alWH) 0.0 1:134.758.0 41,392,651.0
- 19. C: u Senice r:: tor 0.0 65.0 71.7 l
- 22. '.'.m!:
- s:!::b!! :y Fs::ar 0.0 65.0 71.7 2. '.'r : C:pa:i:v Fs::or (Usi;;;.'.;00 ;ct) 0.0 64.6 61.9
- 22. Unit Capacit$ Facter iUsin:
100.0 31.8
'3.1
- 23. Unit urced Outs; Rate ' DER Net 1 0.0 63.6 61.0 l
r
- 24. Shutdowns Scheduled Oser Ne.st 6 Stunths iType. Date.s:.d Dur.:t'aa of Eac!:::
- 25. If Shut l>uwn At End Of Leport Period. Estimsted I) ate of Sisrtup:
M,,.r. h 1983 7
- 26. Lia:s in Test Status (Prior to Commercis! Operatiu.il:
Furecast Achiesed l O rNiTiAt caiT>CAliTv INITIAL ELECTI ! CITY COS:AIERCIAL Ol'CRATION h
~
"C 0 R R E C T I O N"
~
OPERATING DATA REPORT O
DOCKET NO.
Kn 770 DATE 9 / A / R7_
-COSIPLETED BY v t r' on TELEPl!ONF. (315) 343-21 0 X1383 OPE R A TINC ST.?.TUS
- i. Unit Name:
Nine blile Point Unit #1 Notes
- 2. Reportia; Period:
04/01/82 to 04/30/82 1850
. Li:ensed Therms! Power (31Wt):
- 4. Nameplate Rating (Gross 51We):
- 5. Desi;n Electrical Rsting (Net blWe):
- 6. 51stimune Dependsble Capacity (Gross hlWe):
630
- 7. S!srimum Dependsble Capacity (Net MWe):
--610 S. If Chsn;es Occur in Capscity Ratings (!! ems Number 3 Through 7) Since Lsst Report.Give Reasons:
~
~
- 9. Power Level To Whi:h Restricted,If Any(Net MWe):
- 10. Ressons For Res :ictions.If Any:
This Month Yr..to. Dst e Cumulmise I
!1. Hcurs In Reportin; Period 720.0 2880.0 109,536.0 l
- 12. Number Of Hours Reseror Was Critical 0.0 1874.0 81, Jus.d
- 13. Res: tor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generster On-Line 0.0 1872.5 78,564.4
- 15. L* nit Resene Shutdown He:: r 0.0 0.0 20.4
- 16. C:sss Ther.T.s! Ener;y Ger.e.sted (.*.;'..'H) 0.0 3,421,093.0 129,374,490.0
- 17. G ass Electriesl Ever;y Cerersted (MWH) 0 Q _., 1.169.791.0 42.743,090.0
- 16. Net Electriesi Energy Generated (MWHj 0.0 1:134.758.0 41,392,651.0
- 19. Unit Seni:e r:: tor 0.0 65.0 71.7
- 20. '."n!:
- t:!!:5!! :y Fs:::::
0.0 65.0 71.7 2:, '*. : Cs;:s:i:y Fs: tor (Usi;;;.*.;;,C ::et) 0.0 64.6 61.9
- 22. C::ir Capacity FacterIUsing DER Net) 0.0 63.6 61.0
- 23. Unit Forced Outs;e Rate 100.0 31.8 9.1
. _j
- 24. Shutdou ns Scheduled Oser Next 6 Munths (Type. Date.si.t* Dur.:tiaa of Esch::
- 25. If Shut thewn At End Of 1.eport Periud. Estimsted Date of Startup:
M2,.,.h 1983_
1
- 26. Um:> In Te Status IP-iur to Commereis! Operstical:
Forecast Achiesed O
ixiTiAL CRiTiCA LiTv INITIAL ELECTI ! CITY COMMERCIA L UI'CR ATION O
('8 E l s
2
"C 0 R R E C T I O N".
OPERATING DATA REPORT O
DOCKET NO.
KO 220 DATE
</A/R7
-CO. !PLETED BY r t' on
\\
TELEPl!ONE (315) 343-21 0 X1383 OPER ATING ST.*.TUS
- f. Ur:it Name:
Nine Mile Point Unit #1 Not*5
- 2. Reportin; Period:
04/01/82 to 04/30/82 1850
.. Licensed Therms! Power (MWt):
04u
- 4. Nameplate Ratin;(Gross 5tWe):
D#"
S. Desi;n ElectricalRating(Net AtWe):
- 6. Maximum Dependable Capscity (Gross MWe):
630
- 7. Msximum Dependsble Capscity (Net MWe):
610 S. If Chs..;es Occur in Capscity Rstings (! ems Number 3 Through 7)Since Last Report.Give Reasons:
~
~
- 9. Pow er Level To Whi:h Restricted,If Any (Net MWe):
- 10. Ressons For Restrictions.If Any:
e This Month Yr to.Date Cumulstis e II. Hcurs !n Reportin; Period 720.0 2880.0 109,536.0
- 12. Numter Of Hours Reactor Was Critica!
0.0 1874.0 81,30s.3
- 13. Res: tor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hour < Generstor On.Line 0.0 1872.5 78,56z.3
- 15. Unit Resers Shutdown Ha::.7 0.0 0.0 20.4
- 16. Crcss Thert::s! Ener;y Gencested (MWH) 0.0 3,421,093.0 129,374,390.0
- 17. G nss Electriesl Erer;y Gerersted (MWH)
O d.
1.d@9.791.0 42,743,090.0 in.. Net Electrie.si Ener;y Genersted (MWH) 0.0 1;134,758.0 41,392,651.0
- 19. Unit Se-Oe r:ctor 0.0 65.0 71.7
- 20. '.*ni:
- t:!!:5.'! :y F:::s:
0*0 65.0 71.7 2. *.?r. : Caps:i:y Fs: tor (Usi::;.*.;0C.*.*ct) 0.0 64.6 61.9
- 22. C: tit Capacitv Facter IUsin; DER Net) 0.0 63.6 61.0
~
- 23. Unit Forced Outs; Rate 100.0 31.8 9.1
- 24. ShurJonus Selieduled Oser Next 6 Months (Type. Date.si.c: Duratina uf Esch::
- 25. If S! ut IAmn At End Of I.eport Period. Estimated !) ate of Startup:
h-r h 1983 7
- 26. Um:s in Test Status (Prior in Commereist Operatiu.nl:
Furecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPCRATION
('3773 r
i
~
'C 0 R R E C T I O N" OPERATING DATA REPORT O
DOCKET NO.
90 220 DATE
< / 6 /"
-CO3!PLETED BY r on TEl.EPilONF. (315} 343-21 X1383 C.PE RA TING ST.*.TUS
- i. Unit Name:
Nine Mile Point Unit #1 Notes
- 2. Reporting Period:
04/01/82 to 04/30/82 1850 2 Licensed Thermal Power (31Wt):
.~
- 4. Nameplate Rsting (Gross 31We):
biU
- 5. Desi;n Electrical Rating (Net blWe):
- 6..%!sumum Dependsble Capacity (Gross MWe):
630
- 7. 3!s.simum Dependsble Capscity (Net MWe):
610 S. !! Chs..;es Occur in Capscity Rstings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Pow er Level To Whi:h Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
~
This.\\!onth Yr..to-Da te Cumulstis e
- 11. Hcurs in Reportin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Rescror Was Critics!
0.0 1874.0 81,30s.:
- 13. Res: tor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generstor On.Line 0.0 1872.5 78,562.3
- 15. Unit Resene Shutdown He:: r 0.0 0.0 20.4
- 16. Cross Ther.T.:! Enct;y Ger.usted (.'.;WH) 0.0 3,421,093.0 129,374,39u.0
- 17. G nss Electrieel Ener;y Gerersted (SIWH)
QJ.
1.169.791.0 42,743,090.0
- 15. Het Electri si Energy Genersted (.\\lWH) 0.0 1:134.758.0 41,392,651.0
- 19. Cmt Seni:e r:ctor 0.0 65.0 71.7
- 22. '. !:
- t:1!:5!! :y Fs::ar 0.0 65.0 71.7
- . Lr. : C:;s:i:y Fs::or (Usis:;.'.*M :!ct) 0.0 64.6 61.9
- 22. C: tit Capacity Facter(Using DER Net) 0.0 63.6 61.0
- 23. Unit Furced Outs;e Rare 100.0 31.8 9.1
- 24. Shutdowus Scheduled Oser Ne.st 6 Months iType. Date.si.i Dur.:tiaa ur Each::
- 25. If Shur l>own At End Of !.eport Period. Estimated !)are of Startup:
m v, h 1983 7
- 26. Cu:> In Test Stssus (Prior o Cmnmereist Operatina):
Forecast
/ chiesed INITIA L CRITICA LITY INITIAL ELECT!!! CITY CO.\\t.\\lERCIAL OPERATION C
('If I
"C 0 R R E C T I O N".
OPERATING DATA REPORT O
DOCKET NO.
'in _2 20 DATE
< / /' / 5t 7
-COMPLETED BY
'v' '" Da TELEPl!ONF. (315) 343-21 0,l X1383
)
OPERATING ST1.TUS 1
- i. Unit Name:
Nine Nile Point Unit #1 Not*5
- 2. Reportin; Period:
04/01/82 to 04/30/82 e
1850
. Li:ensed Thermal Power (31Wt):
osu
- 4. Nameplate Rating (Gross MWe):
S. Desi;n Electriest Rating (Net MWe):
- 6. Maximun: Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610 S. !f Chsn;es Occur in Capacity Ratinp (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Whi:h Restricted. If Any (Net MWe):
- 10. Ressons For Restrictions.If Any:
This Month Yr.-to-Dst e Cumuisthe II. Hcurs in nerottin; Period 720.0 2880.0 109,536.0
- 12. Number Of Hours Resetor Was Crities!
0.0 1874.0 81,3us.s
- 13. Res:for Reserie Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Grnerator On Line 0.0 1872.5 78,562.3
- 15. Unit Resene Shutdown Hourr 0.0 0.0 20.4
- 16. Cross Thermal Enct;y Cer.usted (M*.'.'H) 0.0 3,421,093.0 129,374,390.0
- 17. G nss Electriesl Ener;y Ger ersted (MWH) 0J.
1.169.791.0 42.743,090.0
- 15. Net Electri:si Energy Genersted (MWH) 0.0 1:134,758.0 41,392,651.0 l'
- 20. U.-!:.'.t:!':5!! :y F:::ar 0.0 65.0 71.7
- 19. Umt Senice r:ctor 0.0 65.0 71.7
- 21. Ur.!: C:;:s:I:y Fs: tar (Usis:;.'.;C,0 *ct) 0.0 64.6 61.9
- 22. C: tit Capacitv Facter (Usin: DER Net 1 0.0 63.6 61.0
- 23. Unit Forced Outage Rate '
100.0 31.8 9.1
- 24. Shutdowns Scheduled Oser Ne.st 6 Months iType. Date.si.4 Dur.:tiaa ur Each::
- 25. If Shur Down At End Of I.eport Period. Estimated !) ate of Stsrtup:
Ma vr h, 1983.
1
- 26. L ::: In Te t Status (Prior to Commercist Operatiu. l:
Furecast Achiesed INITIAL CRITICA LITY l
INITIA L ELCCTRICITY l
COMMERCIAL UPCRATION l
e i 1
_.