Forwards Corrected IE Insp Repts 50-250/82-14 & 50-251/82-18 on 820327-29.No Noncompliance Noted
ML20052G147
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/19/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20052G148 List:
References
NUDOCS 8205140351
Download: ML20052G147 (2)


See also: IR 05000250/1982014

Text

-

.

/

'

0FFICIAL

APR 191982

<

e

RECEIVED

Florida Power and Light Company

,

ATTN:

Dr. R. E. Uhrig, Vice President

5

MAY 131982>- I

Advanced Systems and Technology

- muur.ns ma

'

P. O. Box 529100

8Cagm 88

p

filami, FL 33152

9

Gentlemen:

4

m

Subject: Report Nos. 50-250/82-14 and 50-251/82-18 Corrections

This refers to the routine safety inspection conducted by Mr. E. H. Brooks of

this office on fiarch 27-29, 1982, of activities authorized by NRC Operating

License Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discus-

sion of our findings held with J. K. Hays, Plant fianager, at the conclusion of

the inspection.

Our Report Nos. 50-250/82-14 and 50-251/82-18 contained typographical errors.

A corrected copy of the report is enclosed. We regret any inconvenience this

may have caused.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

0/Ne

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Prograns

Enclosure:

Inspection Report No. 50-250/82-14 and 50-251/82-18

cc w/ encl:

H. E. Yaeger, Site ftanager

k?&CK05000

351 820419

\\

0

f

__

_ _ . _ -

_ _ . -

_.

..

_

,

. .. _ _. _

i --

Florida Power and Light Company

2

.

bec w/ encl:

NRC Resident Inspector

H. Whitener

.

Document Management Branch-

.

State of Florida

,

h

RII:EP0

RII:ETP

RII:PBP

RII:PRP

RII:PRP

EHBrooks:ejw

FJape W

KLpdb

HDance

FJLong

4//f/82

4//T/82"

4/fy/82

4//6 /82

4//k/82

.

e..,,.,,.,+,..m-

- - , , , - - - - . - - , , . , . , , , . , - , , - , , . , , , ,

,--.--a

- - . ~

,_n.,.n,a.

. _ . ,