Monthly Operating Rept for Mar 1982
ML20052G061
Person / Time
Site: Ginna 
Issue date: 04/07/1982
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20052G047 List:
References
NUDOCS 8205140274
Download: ML20052G061 (1)


Text

_1_

OPERATING DM'A REPORT DOCKET NO.

50-244 DATE April 7, 1982 CCMPIETED BY dh 2. 7vr%%%

Andrew E. McNamara

'IELEPfKNE 1 (315) 524-4446 OPERATING STA'IUS Ext. 293 or 501

1. Unit Name: GIMIA STATICN, UNIT #1 Notes: % e unit remained shutdown for
2. Reporting Period: March, 1982 the entire report period for repairs
3. Licensed %ermal Power (Pett):

1520 to the "B" Steam Generator and normal

4. Nameplate Rating (Gross MWe):

490 refueling outage activities.

5. Design Electrical Rating (Net MWe): 470
6. Maximin Dependable Capacity (Gross PMe): 490
7. Maxim m Dependable Capacity (Net Pese):

470

8. If Changes Occur in Capacity Ratings (Itens Ntaber 3 through 7) Since Last Beport, Give Reasons:
9. Power Level to Miicf1 Restricted, If Any (Net P90e):
10. Reasons For Restrictions, If Any:

his Itxith Yr.-to-Date Ctumulative

11. Hours In Reporting Period 744 2,160 108,216.00
12. Ntaber of Hours Reactor was Critica]

O 585.5 82,228.12

13. Reactor Reserve Shutdown Hours 0

0 1,631.32 *

14. Hours Generator On-Line 0

585.5 80,413.13

15. Unit Reserve Shutdown Hours 0

0 8.5 *

16. Gross %ermal Energy Generated (PSGH) 0 881,568 109,787,122
17. Gross Electrical Energy Generated (MMI) 0 288,921 35,723,886
18. Net Electrical Energy Generated (Ptel) 0 274,977 **

33,853,050

19. Unit Service Factor 0%

27.11%

74.3Ti

20. Unit Availability Factor 0%

27.11%

74.32%

21. Unit C@acity Factor (Using 70C Net) 0%

27.09%

68.59%

22. Unit Capacity Factor (Using DER Net) 0%

27.09%

68.59%

23. Unit Forced Outage Rate 0%

53.08%

9.0%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

l

25. If Shutdown At End Of Report Period, Estimated Date Of Startup: May 1, 1982
26. Units In Test Status (Prior to Ccamercial Operation):

Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY (XPMERCIAL OPERATICN

  • Ctamulative total Conmencing January 1,1975.
    • Corrects calculating error in the January,1982 Cperating Data Report.

8205140274 4

PDR ADOCK 0 PDR R

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 (MIT #1 Ginna Station IRTE April 7, 1982 COMPLEIED BY 6 L _r-E,'>>%4o Andrew E. McNamara

'IELEPHNE 1 (315) 524-4446 Ext. 293 or 501 McNat March, 1982 DAY AVERAGE DAILY POER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(P90e-Net) 1.

17.

2.

18.

3.

19.

4.

20.

5.

21.

6.

22.

7.

23.

8.

24.

9.

25.

10.

26.

11.

27.

12.

28.

13.

29.

14.

30.

15.

31.

16.

l l

l l

INSIBUCTIONS l

on this format, list the average daily unit power level in P90e-Net for each day in the reporting month. Conpute to the nearest whole megawatt.

l l

l l

l l

DOOTT N0 50-244 0

[EIT NPME il Ginna StGtion UNIT SHUIDOIN APO POWER REDUCTICNS DPdE April _7, 1982 (IMPLEIED BY h F. h e,4

~

Andrew E. Mdiamarh REPORr M3mi March, 1982

'IELEPfENE 1 (315) 524-4446 Ext. 293 or 501 Method of Duration Reason Shutting Licensee System Cbnponent Cause & Corrective No.

Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report i Prevent Recurrence 01 01/25/82 8*

744

  • C 3

82-003

'Ihe unit remained shutcbwn for the entire period for repairs to the "B" Steam Generator and normal refueling outage activities.

4 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Rpipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets fcr Licensee C-Refueling 3-Automatic Scrm.

Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Administrative

  • Hours for Report G-Operational Error (Explain)

Pbnth.

5 H-Other (Explain)

Exhibit 1 - S m e Source

  • On February 22, 1982, regularly scheduled refueling shutdwon hours comunenced, reflected by the change from forced outage to scheduled outage hours.

NARRATIVE Sul#UWY & TERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit il IRTE April 7, 1982 COMPLETED BY kb> 8.

o-1 Andrew E. McNasnara

'IELEPHCNE 1 (315) 524-4446 Ext. 293 or 501 M[NIH March, 1982 The unit remained shutdown in the report period for Steam Generator inspection and repairs.

Normal refueling activities were conpleted.

Routine shutdown maintenance proceeded according to schedule.

~

w

i GDem SmTION Maintenance Report March, 1982 A a:nplete report covering all phases of maintenance activities performed during this shutdown will be submitted at the end of the shutdown, attached to the monthly operating data report.