Monthly Operating Rept for Mar 1982
ML20052G061
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/07/1982
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20052G047 List:
References
NUDOCS 8205140274
Download: ML20052G061 (1)


Text

,

_1_

OPERATING DM'A REPORT DOCKET NO. 50-244 DATE April 7, 1982 CCMPIETED BY dh 2. 7vr%%%

Andrew E. McNamara

'IELEPfKNE 1 (315) 524-4446 OPERATING STA'IUS Ext. 293 or 501

1. Unit Name: GIMIA STATICN, UNIT #1 Notes: % e unit remained shutdown for
2. Reporting Period: March, 1982 the entire report period for repairs
3. Licensed %ermal Power (Pett): 1520 to the "B" Steam Generator and normal
4. Nameplate Rating (Gross MWe): 490 refueling outage activities.
5. Design Electrical Rating (Net MWe): 470
6. Maximin Dependable Capacity (Gross PMe): 490
7. Maxim m Dependable Capacity (Net Pese): 470
8. If Changes Occur in Capacity Ratings (Itens Ntaber 3 through 7) Since Last Beport, Give Reasons:
9. Power Level to Miicf1 Restricted, If Any (Net P90e):
10. Reasons For Restrictions, If Any:

his Itxith Yr.-to-Date Ctumulative

11. Hours In Reporting Period 744 2,160 108,216.00
12. Ntaber of Hours Reactor was Critica] O 585.5 82,228.12
13. Reactor Reserve Shutdown Hours 0 0 1,631.32 *
14. Hours Generator On-Line 0 585.5 80,413.13
15. Unit Reserve Shutdown Hours 0 0 8.5 *
16. Gross %ermal Energy Generated (PSGH) 0 881,568 109,787,122
17. Gross Electrical Energy Generated (MMI) 0 288,921 35,723,886
18. Net Electrical Energy Generated (Ptel) 0 274,977 ** 33,853,050 **
19. Unit Service Factor 0% 27.11% 74.3Ti
20. Unit Availability Factor 0% 27.11% 74.32%
21. Unit C@acity Factor (Using 70C Net) 0% 27.09% 68.59%
22. Unit Capacity Factor (Using DER Net) 0% 27.09% 68.59%
23. Unit Forced Outage Rate 0% 53.08% 9.0%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

l

25. If Shutdown At End Of Report Period, Estimated Date Of Startup: May 1, 1982
26. Units In Test Status (Prior to Ccamercial Operation): Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY (XPMERCIAL OPERATICN

  • Ctamulative total Conmencing January 1,1975.
    • Corrects calculating error in the January,1982 Cperating Data Report.

, 8205140274 4 PDR ADOCK 0 PDR R

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 (MIT #1 Ginna Station IRTE April 7, 1982 COMPLEIED BY 6 L _r-E,'>>%4o ... .

Andrew E. McNamara

'IELEPHNE 1 (315) 524-4446 Ext. 293 or 501 McNat March, 1982 DAY AVERAGE DAILY POER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (P90e-Net)

1. 17.
2. 18.
3. 19.
4. 20.
5. 21.
6. 22.
7. 23.
8. 24.
9. 25.
10. _.

26.

11. 27.
12. 28.
13. 29.
14. 30.
15. 31. .

16.

l l

l l

INSIBUCTIONS l on this format, list the average daily unit power level in P90e-Net for each day in the reporting month. Conpute to the nearest whole megawatt.

l l

l l

l l

DOOTT N00 50-244

[EIT NPME il Ginna StGtion -

UNIT SHUIDOIN APO POWER REDUCTICNS DPdE April _7, 1982 (IMPLEIED BY h F . h e,4 _

~

Andrew E. Mdiamarh REPORr M3mi March, 1982 'IELEPfENE 1 (315) 524-4446 Ext. 293 or 501 Method of Duration Reason Shutting Licensee System Cbnponent Cause & Corrective No. Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report i Prevent Recurrence 01 01/25/82 8* 744

  • C 3 82-003 'Ihe unit remained shutcbwn for the entire period for repairs to the "B" Steam Generator and normal refueling outage activities.

4 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Rpipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets fcr Licensee C-Refueling 3-Automatic Scrm. Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative

  • Hours for Report G-Operational Error (Explain) Pbnth. 5 H-Other (Explain) Exhibit 1 - S m e Source ,
  • On February 22, 1982, regularly scheduled refueling shutdwon hours comunenced, reflected by the change from forced outage to scheduled outage hours.

NARRATIVE Sul#UWY & TERATING EXPERIENCE DOCKET NO. 50-244 UNIT Ginna Station, Unit il IRTE April 7, 1982 COMPLETED BY kb> 8. o- 1 Andrew E. McNasnara

'IELEPHCNE 1 (315) 524-4446 Ext. 293 or 501 M[NIH March, 1982 The unit remained shutdown in the report period for Steam Generator inspection and repairs. Normal refueling activities were conpleted. Routine shutdown maintenance proceeded according to schedule.

-- -- ~ w --

i

- GDem SmTION Maintenance Report March, 1982 A a:nplete report covering all phases of maintenance activities performed during this shutdown will be submitted at the end of the shutdown, attached to the monthly operating data report.