_1_
OPERATING DM'A REPORT DOCKET NO.
50-244 DATE April 7, 1982 CCMPIETED BY dh 2. 7vr%%%
Andrew E. McNamara
'IELEPfKNE 1 (315) 524-4446 OPERATING STA'IUS Ext. 293 or 501
- 1. Unit Name: GIMIA STATICN, UNIT #1 Notes: % e unit remained shutdown for
- 2. Reporting Period: March, 1982 the entire report period for repairs
- 3. Licensed %ermal Power (Pett):
1520 to the "B" Steam Generator and normal
- 4. Nameplate Rating (Gross MWe):
490 refueling outage activities.
- 5. Design Electrical Rating (Net MWe): 470
- 6. Maximin Dependable Capacity (Gross PMe): 490
- 7. Maxim m Dependable Capacity (Net Pese):
470
- 8. If Changes Occur in Capacity Ratings (Itens Ntaber 3 through 7) Since Last Beport, Give Reasons:
- 9. Power Level to Miicf1 Restricted, If Any (Net P90e):
- 10. Reasons For Restrictions, If Any:
his Itxith Yr.-to-Date Ctumulative
- 11. Hours In Reporting Period 744 2,160 108,216.00
- 12. Ntaber of Hours Reactor was Critica]
O 585.5 82,228.12
- 13. Reactor Reserve Shutdown Hours 0
0 1,631.32 *
- 14. Hours Generator On-Line 0
585.5 80,413.13
- 15. Unit Reserve Shutdown Hours 0
0 8.5 *
- 16. Gross %ermal Energy Generated (PSGH) 0 881,568 109,787,122
- 17. Gross Electrical Energy Generated (MMI) 0 288,921 35,723,886
- 18. Net Electrical Energy Generated (Ptel) 0 274,977 **
33,853,050
- 19. Unit Service Factor 0%
27.11%
74.3Ti
- 20. Unit Availability Factor 0%
27.11%
74.32%
- 21. Unit C@acity Factor (Using 70C Net) 0%
27.09%
68.59%
- 22. Unit Capacity Factor (Using DER Net) 0%
27.09%
68.59%
- 23. Unit Forced Outage Rate 0%
53.08%
9.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
l
- 25. If Shutdown At End Of Report Period, Estimated Date Of Startup: May 1, 1982
- 26. Units In Test Status (Prior to Ccamercial Operation):
Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY (XPMERCIAL OPERATICN
- Ctamulative total Conmencing January 1,1975.
- Corrects calculating error in the January,1982 Cperating Data Report.
8205140274 4
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 (MIT #1 Ginna Station IRTE April 7, 1982 COMPLEIED BY 6 L _r-E,'>>%4o Andrew E. McNamara
'IELEPHNE 1 (315) 524-4446 Ext. 293 or 501 McNat March, 1982 DAY AVERAGE DAILY POER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(P90e-Net) 1.
17.
2.
18.
3.
19.
4.
20.
5.
21.
6.
22.
7.
23.
8.
24.
9.
25.
10.
26.
11.
27.
12.
28.
13.
29.
14.
30.
15.
31.
16.
l l
l l
INSIBUCTIONS l
on this format, list the average daily unit power level in P90e-Net for each day in the reporting month. Conpute to the nearest whole megawatt.
l l
l l
l l
DOOTT N0 50-244 0
[EIT NPME il Ginna StGtion UNIT SHUIDOIN APO POWER REDUCTICNS DPdE April _7, 1982 (IMPLEIED BY h F. h e,4
~
Andrew E. Mdiamarh REPORr M3mi March, 1982
'IELEPfENE 1 (315) 524-4446 Ext. 293 or 501 Method of Duration Reason Shutting Licensee System Cbnponent Cause & Corrective No.
Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report i Prevent Recurrence 01 01/25/82 8*
744
- C 3
82-003
'Ihe unit remained shutcbwn for the entire period for repairs to the "B" Steam Generator and normal refueling outage activities.
4 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Rpipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets fcr Licensee C-Refueling 3-Automatic Scrm.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative
- Hours for Report G-Operational Error (Explain)
Pbnth.
5 H-Other (Explain)
Exhibit 1 - S m e Source
- On February 22, 1982, regularly scheduled refueling shutdwon hours comunenced, reflected by the change from forced outage to scheduled outage hours.
NARRATIVE Sul#UWY & TERATING EXPERIENCE DOCKET NO.
50-244 UNIT Ginna Station, Unit il IRTE April 7, 1982 COMPLETED BY kb> 8.
o-1 Andrew E. McNasnara
'IELEPHCNE 1 (315) 524-4446 Ext. 293 or 501 M[NIH March, 1982 The unit remained shutdown in the report period for Steam Generator inspection and repairs.
Normal refueling activities were conpleted.
Routine shutdown maintenance proceeded according to schedule.
~
w
i GDem SmTION Maintenance Report March, 1982 A a:nplete report covering all phases of maintenance activities performed during this shutdown will be submitted at the end of the shutdown, attached to the monthly operating data report.