APR 2 61982
m
q,
C)
9
L
ND
Docket No. 50-546
.
g
Docket No. 50-547
5:
MAY181982m- 2'
"
- 3n m aE m r nungay
Public Service of Indiana
InEu mac2mr u
U*
M
AT7N:
Mr. S. W. Shields
9
Senior Vice President
Nuclear Division
Gu
n3
Post Office Box 190
New Washington, IN 47162
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. J. Harrison
of this office on March 1-31, 1982, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized bv NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the f cussion of our findings with
Messrs. Petro, Ramsett, and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requiremants were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding;
and (b) submit within twenty-five (25) days from the date of this letter
a written application to this office to withhold such information.
If
your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to
be withheld, and which contains a full statement of the reasons which are
the bases for the claim that the information should be withheld from
8205140202 820426
PDR ADOCK 05000546
G
PlHf
gg
ZE C/
_ . -
.
6
)
Public Service of Indiana
2
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter and-
the enclosures will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
"Or! sinal signed by R.L. Spes:crd"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure:
Inspection
Reports No. 50-546/82-08(DPRP)
and No. 50-547/82-08(DPRP)
cc w/ enc 1:
W. M. Petro, Executive Director
Nuclear Project Management
C. Kammerer, CA
J. H. Sniezek, IE
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of Attorney
General
John R. Galloway, Staff Director
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley Power
Association
Thomas M. Dattilo, Save the Valley
1
RII
RIII
RII
W.heeter
f
<G
Konklin jp
St
Spessprd
4/22/82
4/yggt
y
MAY 10 mag
. . -
_ _
.