ML20052F636
| ML20052F636 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 05/06/1982 |
| From: | Norris H CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20052F632 | List: |
| References | |
| NUDOCS 8205130276 | |
| Download: ML20052F636 (3) | |
Text
Page 1 of 3 4
OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 820506 COMPLETED BY: 11. Ray Norris TELEPHONE: (803) 383-4524 OPERATING STATUS Notes:
- 1. Unit Name: __II.
B. ROBINSON UNIT TWO THERE ARE PRESENTLY 270 SPENT FUEL
- 2. Reporting Period: 820401, 0000/820430, 2400 ASSEMBLIES IN THE SPENT FUEL POOL
- 3. Licensed Thermal Power (FMt): 2300
- 4. Nameplate Rating (Gross F7Je):
739
- 5. Design Electrical Rating (Net IMe): 700
- 6. Maximum Dependable Capacity (Gross FMe): 700
- 7. Maximum Dependable Capacity (Net MWe):
665.
- 8. If Changes Occur in Capacity Ratings (ltem Number 3 through 7) Since Last Report, Give Reasons:
NO CHANGE
- 9. Power Level to Which Restricted, If Any (Net FMe): APPROXIMATELY 535 (80% REACTOR POWER)
- 10. Reasons For Restrictions, If Any: ALTHOUGH TIIE UNIT IS NOT RESTRICTED BY ANY OUTSIDE AGENCY. Tile POWER LEVEL IS PRESENTLY REDUCED DUE TO STEAM GENERATOR CONSIDERATIONS This Month Yr.-to-Date Cunulative
- 11. Ilours in Reporting Period 719 2879 97.805
- 12. Number of flours Reactor Was Critical 0
1,367.1 73,712.52
- 13. Reactor Reserve Shutdown llours 0
0 1,085.30
- 14. Hours Generator On-Line 0
1,367.1
.71,922.41
- 15. Unit Reserve Shutdown llours 0
0 23.20
- 16. Gross Thermal Energy Generated (MWH) 0 2.501,310 145,596,684
- 17. Gross Electrical Energy Generated (FMH) 0 798,330 46,876,300
- 18. Net Electrical Energy Generated (FMll)
-1381 747,157 44,367,408
- 19. Unit Service Factor 0
47.48 73.53
- 20. Unit Availability Factor 0
47.48 73.56
- 21. Unit Capacity Factor (Using MDC Net) 0 39.02 68.21
- 22. Unit Capacity Factor (Using DER Net) 0 37.07 64.80
- 23. Unit Forced Outage Rate 0
0 14.35
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NONE
- 25. If Shut Down At End of Report Period, Estimated Date of Startup: JULY 1, 1982 l
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 820513o276 82051o (9/77)
PDR ADOCK 05000261 R
pyg
Page 2 of 3 AVERAGE DAILY UNIT POWER LEVEL
~
i DOCKET NO.
50-261 UNIT WO DATE 820506 COMPLETED BY H. RAY NORRIS TELEl' HONE 803-383-4524 APRIL MONT11 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 0 0
1 37 2
0 1g 0
0 0
3 39 0
0 4
20 5
0 21' 0
0 0
6 22 7
n 23 n
0 0
8 24 9
0 25 0
10 0
26 0
0 0
27 12 0
28 0
i 13 0
29 0
~
0 0
14 30 7
15 0
31 0
16 l
INSTRUCTIONS On this format, list the serage daily unit power leve!in MWe Net for each d:y in the reporting nwnth. Compute to the nesic>t whole rnegawstt.
(9/77) i
~
i tA +
i
,, ~.
Page 3 of 3 Dgg Ag UNIT S!!UTDOWNS AND POWER REDUCTIONS H. B O NSON DATE 820506 COMPLETED BY H. RAY NORRIS REPORT AtONTl! APRIL TEl.Li'l!ONE 803-383-4524 E
E
,{g 3
4.Y 2 l Licensee h
y'%
Cause 1 Corrective No, Date Q
53 4
.5 5
Event
- ? ?
9'S Action to y
5 35a Report :
tN U SV Present Recurrence l
H 1
u 6
02-01 820401 S
719 B/C 3
ZZ ZZZZZZ SHUTDOWN FOR MAINTENANCE / REFUELING J
OUTAGE I
l I
l I
2 3
4 l
F: Forced Reason:
Method:
Ex!iibit C Instructions S: S !:edu'ed A Equipment Fai!ure(Explain) 1-Manual for Prepar.ition of Data B Maintenan: of Test 2.Manu21 Scram.
Ent y Sheets for !.ieensee C Refueling 3 Automatic Scram.
Event Repoit (1.1:10 I: le tNUREG-l D Regnfa:ury Restriction 4-Other (Explain) 016s1 1
1.-Ope ator Tr:.ining1 License Examination
~
F Adnuni>tra:nc 5
G Oper :icnal linsur (Explain)
Ex!nhis I - Same Source (9/77)
Il Dihes ( Es;%in)
I l
-