ML20052F636

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1982
ML20052F636
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/06/1982
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20052F632 List:
References
NUDOCS 8205130276
Download: ML20052F636 (3)


Text

Page 1 of 3 4

OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 820506 COMPLETED BY: 11. Ray Norris TELEPHONE: (803) 383-4524 OPERATING STATUS Notes:

1. Unit Name: __II.

B. ROBINSON UNIT TWO THERE ARE PRESENTLY 270 SPENT FUEL

2. Reporting Period: 820401, 0000/820430, 2400 ASSEMBLIES IN THE SPENT FUEL POOL
3. Licensed Thermal Power (FMt): 2300
4. Nameplate Rating (Gross F7Je):

739

5. Design Electrical Rating (Net IMe): 700
6. Maximum Dependable Capacity (Gross FMe): 700
7. Maximum Dependable Capacity (Net MWe):

665.

8. If Changes Occur in Capacity Ratings (ltem Number 3 through 7) Since Last Report, Give Reasons:

NO CHANGE

9. Power Level to Which Restricted, If Any (Net FMe): APPROXIMATELY 535 (80% REACTOR POWER)
10. Reasons For Restrictions, If Any: ALTHOUGH TIIE UNIT IS NOT RESTRICTED BY ANY OUTSIDE AGENCY. Tile POWER LEVEL IS PRESENTLY REDUCED DUE TO STEAM GENERATOR CONSIDERATIONS This Month Yr.-to-Date Cunulative
11. Ilours in Reporting Period 719 2879 97.805
12. Number of flours Reactor Was Critical 0

1,367.1 73,712.52

13. Reactor Reserve Shutdown llours 0

0 1,085.30

14. Hours Generator On-Line 0

1,367.1

.71,922.41

15. Unit Reserve Shutdown llours 0

0 23.20

16. Gross Thermal Energy Generated (MWH) 0 2.501,310 145,596,684
17. Gross Electrical Energy Generated (FMH) 0 798,330 46,876,300
18. Net Electrical Energy Generated (FMll)

-1381 747,157 44,367,408

19. Unit Service Factor 0

47.48 73.53

20. Unit Availability Factor 0

47.48 73.56

21. Unit Capacity Factor (Using MDC Net) 0 39.02 68.21
22. Unit Capacity Factor (Using DER Net) 0 37.07 64.80
23. Unit Forced Outage Rate 0

0 14.35

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NONE

25. If Shut Down At End of Report Period, Estimated Date of Startup: JULY 1, 1982 l
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 820513o276 82051o (9/77)

PDR ADOCK 05000261 R

pyg

Page 2 of 3 AVERAGE DAILY UNIT POWER LEVEL

~

i DOCKET NO.

50-261 UNIT WO DATE 820506 COMPLETED BY H. RAY NORRIS TELEl' HONE 803-383-4524 APRIL MONT11 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 0 0

1 37 2

0 1g 0

0 0

3 39 0

0 4

20 5

0 21' 0

0 0

6 22 7

n 23 n

0 0

8 24 9

0 25 0

10 0

26 0

0 0

27 12 0

28 0

i 13 0

29 0

~

0 0

14 30 7

15 0

31 0

16 l

INSTRUCTIONS On this format, list the serage daily unit power leve!in MWe Net for each d:y in the reporting nwnth. Compute to the nesic>t whole rnegawstt.

(9/77) i

~

i tA +

i

,, ~.

Page 3 of 3 Dgg Ag UNIT S!!UTDOWNS AND POWER REDUCTIONS H. B O NSON DATE 820506 COMPLETED BY H. RAY NORRIS REPORT AtONTl! APRIL TEl.Li'l!ONE 803-383-4524 E

E

,{g 3

4.Y 2 l Licensee h

y'%

Cause 1 Corrective No, Date Q

53 4

.5 5

Event

  • ? ?

9'S Action to y

5 35a Report :

tN U SV Present Recurrence l

H 1

u 6

02-01 820401 S

719 B/C 3

ZZ ZZZZZZ SHUTDOWN FOR MAINTENANCE / REFUELING J

OUTAGE I

l I

l I

2 3

4 l

F: Forced Reason:

Method:

Ex!iibit C Instructions S: S !:edu'ed A Equipment Fai!ure(Explain) 1-Manual for Prepar.ition of Data B Maintenan: of Test 2.Manu21 Scram.

Ent y Sheets for !.ieensee C Refueling 3 Automatic Scram.

Event Repoit (1.1:10 I: le tNUREG-l D Regnfa:ury Restriction 4-Other (Explain) 016s1 1

1.-Ope ator Tr:.ining1 License Examination

~

F Adnuni>tra:nc 5

G Oper :icnal linsur (Explain)

Ex!nhis I - Same Source (9/77)

Il Dihes ( Es;%in)

I l

-