ML20052F636

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1982
ML20052F636
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/06/1982
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20052F632 List:
References
NUDOCS 8205130276
Download: ML20052F636 (3)


Text

Page 1 of 3 4

OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 820506 COMPLETED BY: 11. Ray Norris TELEPHONE: (803) 383-4524 OPERATING STATUS Notes:

1. Unit Name: __II. B. ROBINSON UNIT TWO THERE ARE PRESENTLY 270 SPENT FUEL
2. Reporting Period: 820401, 0000/820430, 2400 ASSEMBLIES IN THE SPENT FUEL POOL
3. Licensed Thermal Power (FMt): 2300
4. Nameplate Rating (Gross F7Je): 739
5. Design Electrical Rating (Net IMe): 700
6. Maximum Dependable Capacity (Gross FMe): 700
7. Maximum Dependable Capacity (Net MWe): 665.
8. If Changes Occur in Capacity Ratings (ltem Number 3 through 7) Since Last Report, Give Reasons: NO CHANGE
9. Power Level to Which Restricted, If Any (Net FMe): APPROXIMATELY 535 (80% REACTOR POWER)
10. Reasons For Restrictions, If Any: ALTHOUGH TIIE UNIT IS NOT RESTRICTED BY ANY OUTSIDE AGENCY. Tile POWER LEVEL IS PRESENTLY REDUCED DUE TO STEAM GENERATOR CONSIDERATIONS This Month Yr.-to-Date Cunulative
11. Ilours in Reporting Period 719 2879 97.805
12. Number of flours Reactor Was Critical 0 1,367.1 73,712.52
13. Reactor Reserve Shutdown llours 0 0 1,085.30
14. Hours Generator On-Line 0 1,367.1 .71,922.41
15. Unit Reserve Shutdown llours 0 0 23.20
16. Gross Thermal Energy Generated (MWH) 0 2.501,310 145,596,684
17. Gross Electrical Energy Generated (FMH) 0 798,330 46,876,300
18. Net Electrical Energy Generated (FMll) -1381 747,157 44,367,408
19. Unit Service Factor 0 47.48 73.53
20. Unit Availability Factor 0 47.48 73.56
21. Unit Capacity Factor (Using MDC Net) 0 39.02 68.21
22. Unit Capacity Factor (Using DER Net) 0 37.07 64.80
23. Unit Forced Outage Rate 0 0 14.35
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NONE

25. If Shut Down At End of Report Period, Estimated Date of Startup: JULY 1, 1982 l
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY - --

COMMERCIAL OPERATION -- --

820513o276 82051o (9/77)

PDR ADOCK 05000261 R pyg

Page 2 of 3

' AVERAGE DAILY UNIT POWER LEVEL ~

i DOCKET NO. 50-261 UNIT WO DATE 820506 COMPLETED BY H. RAY NORRIS TELEl' HONE 803-383-4524 MONT11 APRIL DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 0 37 0

1 2 0 1g 0 0 0 3 39 0 0 4 20 5 0 21' 0 0 22 0 6

7 -

n 23 n 0 24 0

8 9 0 25 0 10 0 26 0 0 0

!! 27 ,

12 0 28 0

~

13 0 29 0 i

0 0 14 30 7

15 0 31 16 0 l

INSTRUCTIONS On this format, list the serage daily unit power leve!in MWe Net for each d:y in the reporting nwnth. Compute to the nesic>t whole rnegawstt.

(9/77) i

~

i tA +

i

-- . , . - - - - - ,,. . . . . - . , , ~ . -

Page 3 of 3 UNIT S!!UTDOWNS AND POWER REDUCTIONS Dgg .

H. B O NSON

, Ag DATE 820506 COMPLETED BY H. RAY NORRIS REPORT AtONTl! APRIL TEl.Li'l!ONE 803-383-4524

- E E

-, ,{g 3 4.Y 2 l Licensee h y'% Cause 1 Corrective No, Date Q 53 4 .5 5 Event *? ? 9'S Action to H y 5 -

35a1 Report : tN U SV u

Present Recurrence l 6

02-01 820401 S 719 B/C 3 ZZ ZZZZZZ SHUTDOWN FOR MAINTENANCE / REFUELING J OUTAGE I

l I

l I . 2 3 4 l F: Forced Reason: Method: Ex!iibit C Instructions  !

S: S !:edu'ed A Equipment Fai!ure(Explain) 1-Manual for Prepar.ition of Data B Maintenan: of Test 2 .Manu21 Scram. Ent y Sheets for !.ieensee ,

C Refueling 3 Automatic Scram. Event Repoit (1.1:10 I: le tNUREG- l D Regnfa:ury Restriction 4-Other (Explain) 016s1 ~

1 1.-Ope ator Tr:.ining1 License Examination F Adnuni>tra:nc 5 G Oper :icnal linsur (Explain) Ex!nhis I - Same Source ,

(9/77) Il Dihes ( Es;%in) I l

-