'6 APPENDIX C REGION
'l ACTION PLAN Facility wnp 1/4 Accraisal Date -
1.
Escalated Enforcement Action None 2.
Inscection Pronram Chances (include increasec or cecreased frecuencv)
Inspections of contractor quality assurance orograms should include an
' audit of 255 of their work and inspection crocedures against scecific recuirements in the applicable codes, standards and specifications.
Additionally, the scope of inspections should include reviews of licensee's efforts to assure tnat contractors are adequately prepared before performing safety related activities.
3.
Manacement Meetinas Plannea
~
None 4
Status of Action From Previous Acoraisals Corrective actions or. management problems identified during the June 1978 enforcement conference (IE Inspection Reports 78-04 and 78-05) were examined during the February 1979 mid-term QA inspection (IE Inspection Report 79-02).
During this ceriod, it appears that the results of these corrective actions were not wholly effective in correcting the problems.
(See Attachment #4).
Inspections will continue to focus on these identified management problems and the licensee's efforts to correct same.
Regional Director 2955-C-1 4/15/80 8205120357 811112 PDR FOIA BELL 81-378 PDF
- T. m c;43,e w sc g ggg g tr = 7h ;=rtf;;_gm,gg;gyyg,,p
w i
(
REGION y
ACTION PLAN Facility - Washington Nuclear Project No. 2 (UNP-2)
Appraisal Date May 7,1980 1.
Escalated Enforcement Action Based on concerns associated with the sacrificial shield wall, pipe whip restraints, and other recent construction activities, escalated enforcement action has been initiated.
The enforcement action includes a civil penalty and specifies specific licensec actions which are expected.
Rationale for the proposed licensee action is provided in Attachment 1.
2.
Insucclion Program Changes (include _ increased or decreased frecuency)
Increased inspection effort is.to be initiated in the areas of Quality Assurance, management, training, safety related structures, pipe supports, electrical equipment, electrical (trays and wire), and instrumentation.
Rationale for the increases is provided in Attachment 1.
3.
Manactmen,t_ Meetings Planned
.g, A meeting with Licensee management is scheduled for May 20, 1980 at the Licensee's lleadquarters in Richland, Washington.
4.
Status of Action from Previous Appraisals While the licensee has taken action on flRC comments from previous appraisals these actions have not been wholly effective.
Accordingly, the escalated enforcement action has been proposed and increase inspection effort is to be initiated.
Regional Director w
1 t
MC 2'J55
/
'PPEM0!'< C REGION V
'C :21 DLAN Facili ty - 'it!P 2/5 Acoraisal Date -
1.
Escalated Enforcement Action flone recc= mended or needed at present.
2.
inscectica Pronram Cnances iinciuce increasea or cecrearba frecuencv)
Safety related pioing and hangers, structural steel, electrical equipment and instrumentation inspections snould incluce review of quality assurance icolementing procecures of eacn of the relevant contractors.
A samole of 255 of these procecures snould be audited against specific requirements in the applicable coces, stancards and specifications.
3.
Manacernent ::eetines Pianneu flone 4
Status of *.ction,~ c:a P: evious Acoraisals N/A
/OT1,mh Regional Director 2955-C-1 4/15/80 1
6 MC 29'55 (Acc. 3)
WNP 1/4 Inspection Frecuency and/or Sccee FUNCTIONAL AREA Increase i No. Change {
Oecrease 1.
Quality Assurance, Management & Training x
i 2.
SuDstructure & Foundations X
ac 3.
Concrete X(1) i 3
4.
Liner (Containment & Others-)
i X(1) i 4
5.
Safety-Related Structures X(1) 6.
Piping & Hangers (Reactor Coolant x
& Others) 7.
Safety-Related Components (Vessel, 3
x(1)
Interr.als & riVAC) 8.
Electrical Eauipment X(1)
[
9.
Electrical (Tray & Wire)
X(1) 10.
Instrumentation
~
X(1) 11.
Fire Protection y))
12.
Preservice Inspection X(1) 13.
Reporting X(1) i i
i f
t I
I Notes:
(Designated Regional Manage n (1) Status of construction and enforcement history does not warrant any change in i
inscection frecuency and scope at this Ccf 6,
/ 9 fB time with current regional priorities.
Date 1
I 2955-B-4 4/15/80 F
c..-
.----,,.-,.e-w
, = -..
o
~
wNPZ-Inspection Frecuency and/or Stone l
FUNCTIONAL AREA 1ricrease I No. Change Decrease l
1.
Quality Assurance, Management & Training l x
l l
2.
Sucstructure & Foundations x (1) 3.
Cencrete X (1) 4.
Liner (Containment & Others)
X (1) 5.
Safety-Related Structures X
6.
Piping & Hangers (Reactor' Coolant X
& Others) l l
7.
Safety-Related Components (Vessel, i
Internals & HVAC)
(
X (1)
[
8.
Electrical Equipment f
{
X l
9.
Electrical (Tray & Wire)
X j
l l'
l I
1d.
Instrumentation X
11.
Fire Protection l
X (1) 12.
Preservice Inspection f
y (3) i 13.
Reporting (2.)
I i
}
X (1) i I
i i
i i
i i
NOTES:
(1) Status of construction and Iicensec's performance does not warrant any change in programmatic inspection frequency.
(Designateo Regional Manager)
(2) Licensee reporting and followup to Bulletins, Circulars, and 50.55(e) items is satisfactory.
Licensee Date action is summarized in Attachments 4, 5 and 6.
,4
~,
A.....C 2955
( A:c. 3)-
NHP 3/5 Inspection Frecuengy and/or Scoce
, No. Change Decrease FUNCTIONAL AREA Increase 1.
Quality Assurance. Management & Training y
2.
Substructure & Foundations acd,/ity X
ccmoteta i
i 3.
Concrete x
i x
i 4
Liner (Containment & Others) i 5.
Safety-Related Structures x
t 6.
Piping & Hangers (Reactor Coolant y
l
& Others) l 7.
Safety-Aelatea Components (Vess'ei, 3
y Internals & nVAC)
,t 8.
Electrical Equipment y
9.
Electricai (Tray & Wire) y 10.
Instrumentation y
i 11.
Fire Protection y
.12.
Preservice Inspec. ion y
i
[
x 13.
Reporting l
F l
\\
[
t tE*? NAM (Designateo Regional Manager) i
?
O CE $. I'YTo Date i
J 2955-B-4 4/15/80