Forwards CPC-1-A,Revision 12, QA Program Manual for Midland Nuclear Plant,Vol 1
ML20052F232
Person / Time
Site: Midland
Issue date: 04/26/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20052F234 List:
References
16871, NUDOCS 8205120258
Download: ML20052F232 (2)


Text

., -.- - ~ _ -

a i

Consumers Power Jernes W Ceek O

h Vuce President - Projects, Engineering and Construction oeneret Offices: 1946 West ParneH Road. Jackson, MI 49201 * (517) 788 0453 April 26, 1982-l4 C3 gj'y;5U.

S

/

Ilarold R Denton, Director g%1_ of[f x

6

.1 office of Nuclear Reactor Regulation Division of Licensing N

c" US Nuclear Regulatory Commission Washington, DC 20555

/b

)

MIDLAND PROJECT MIDLAND DOCKET N0 50-329, 50-330 QUALITY ASSURANCE TOPICAL CPC-1-A, REVISION 12 FILE:

0.4, 2.0 SERIAL:

16871 Enclosed are 40 copies of Topical Report CPC-1-A, Revision 12, dated i

April 2, 1982. This revision includes the following major changes:

1.

Topical Report CPC-1-A, Revision 12, now addresses only the Quality t

Assurance program for Midland design, construction and testing activities.

The Quality Assurance program for Palisades, Big Rock Point and Midlan'd operations phase activities is described in Topical Report CPC-2-A (the Quality Assurance Program Description for Operational Nuclear Power Plants).

I 2.

' Topical Report CPC-1-A is revised to show only those organizational-responsibilities and commitments which are applicable to Midland design, i

construction and testing activities.

3.

The Introduction to Topical Report CPC-1-A addresses nuclear fuel procurement, spare parts procurement and the relationship between CPC-1-A 1

and CPC-2-A.

.4.

Topical Report CPC-1-A, Policy 1, Organization, is revised to reflect:

a.

The addition of the Director, Environmental and Quality Assurance, to the Midland Project Office, with responsibility for the Midland Project Quality Assurance Department; Q

b.

A more appropriate emphasis on the Midland Project Quality Assurance Department's major. QA role in the Project; i

/

c.

Quality Assurance - Nuclear Operation's limited involvement.

oc0482-0078a100 8205120258 820426 PDR ADOCK 05000329 l

A PDR

2 5.

Topical Report CPC-1-A, Policy 2,'

is revised to include Consumers Power Company commitments and exceptions to NRC Regulatory Guides 1.58 and 1.146, in accordance with J W Cook's letter (Serial 14605 dated November 2, 1981) to H R Denton. These are consistent with those previously approved in CPC-2-A.

Should you have ony questions, contact D Jones (517-788-0444).

JWC/JNL/dsb CC WHBird, P-14-418A, w/o RJCook, Midland Resident Inspector, w/o WHilaass, NRC, w/o Rifernan, NRC, w/o RWiluston, Washington, w/o BWMarguglio, JSC-220A, w/o DBM111er, Midland, w/o l