Consumers Power Jernes W Ceek O
h Vuce President - Projects, Engineering and Construction oeneret Offices: 1946 West ParneH Road. Jackson, MI 49201 * (517) 788 0453 April 26, 1982-l4 C3 gj'y;5U.
S
/
Ilarold R Denton, Director g%1_ of[f x
6
.1 office of Nuclear Reactor Regulation Division of Licensing N
c" US Nuclear Regulatory Commission Washington, DC 20555
/b
)
MIDLAND PROJECT MIDLAND DOCKET N0 50-329, 50-330 QUALITY ASSURANCE TOPICAL CPC-1-A, REVISION 12 FILE:
0.4, 2.0 SERIAL:
16871 Enclosed are 40 copies of Topical Report CPC-1-A, Revision 12, dated i
April 2, 1982. This revision includes the following major changes:
1.
Topical Report CPC-1-A, Revision 12, now addresses only the Quality t
Assurance program for Midland design, construction and testing activities.
The Quality Assurance program for Palisades, Big Rock Point and Midlan'd operations phase activities is described in Topical Report CPC-2-A (the Quality Assurance Program Description for Operational Nuclear Power Plants).
I 2.
' Topical Report CPC-1-A is revised to show only those organizational-responsibilities and commitments which are applicable to Midland design, i
construction and testing activities.
3.
The Introduction to Topical Report CPC-1-A addresses nuclear fuel procurement, spare parts procurement and the relationship between CPC-1-A 1
and CPC-2-A.
.4.
Topical Report CPC-1-A, Policy 1, Organization, is revised to reflect:
a.
The addition of the Director, Environmental and Quality Assurance, to the Midland Project Office, with responsibility for the Midland Project Quality Assurance Department; Q
b.
A more appropriate emphasis on the Midland Project Quality Assurance Department's major. QA role in the Project; i
/
c.
Quality Assurance - Nuclear Operation's limited involvement.
oc0482-0078a100 8205120258 820426 PDR ADOCK 05000329 l
A PDR
2 5.
Topical Report CPC-1-A, Policy 2,'
is revised to include Consumers Power Company commitments and exceptions to NRC Regulatory Guides 1.58 and 1.146, in accordance with J W Cook's letter (Serial 14605 dated November 2, 1981) to H R Denton. These are consistent with those previously approved in CPC-2-A.
Should you have ony questions, contact D Jones (517-788-0444).