Text
...
N C-E Power Systems Tel. 314/937-4691 Combustion Engineering, Inc.
314/296 5640 Route 21-A Hematite, Missouri 63047 NIS/82/924 H SYSTEMS POWER April 27,1982 G. W. Roy, Acting Chief Technical Inspection Branch U.S. Nuclear Regulatory Commission Region III Glen Ellyn, Illinois 60137
Dear Mr. Roy:
The enclosed report is submitted as requested by your letter dated March 30,1982, concerning IE Inspection Report 70-36/82-02.
Please advise if additional information is required.
Very truly yours, COMBUSTION ENGINEERING, INC.
fm H. E. Eskridge Supervisor, Nuclear Licensing, Safety and Accountability
/w9 Enclosure 8205110585 820505 PDR ADOCK 07000036 APR 3 01982 C
.s e
March 26, 1982 License SNM-33 STATUS OF NON-COMPLIANCE ITEM IDENTIFIED IN IE INSPECTION REPORT 70-36/82-02 Following is the current status of the subject item:
A thorough search of the plant failed to locate the missing seals (numbers 19682 through 19697). All currently tamper-safed items were examined for these seal numbers. These seals have now been declared invalid, and all tamper-safed items will be checked during the next physical inventory to ascertain that they were not improperly used to safeguard an inventory measurement.
3eal accountability will be routinely audited by the Nuclear Materials Coordinator to avoid further non-compliance.
We are now in full compliance on this item.
r H. E. Eskridge l