ML20052E968

From kanterella
Jump to navigation Jump to search
Informs That At&T Has Revised Time Intervals for Normal Svc Requests for Emergency Notification Sys & HPN Circuits.At&T Will Schedule Svc According to Listed Examples Upon Receipt of NRC Telecommunications Branch Order
ML20052E968
Person / Time
Site: Monticello, Dresden, Davis Besse, Palisades, Perry, Fermi, Kewaunee, Point Beach, Byron, Braidwood, Prairie Island, Callaway, Duane Arnold, Clinton, Cook, Quad Cities, La Crosse, Big Rock Point, Zion, Midland, LaSalle, 05000000, Zimmer, 07000925, Bailly, Marble Hill, 07001193
Issue date: 05/05/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
AMERICAN ELECTRIC POWER SERVICE CORP., CINCINNATI GAS & ELECTRIC CO., CLEVELAND ELECTRIC ILLUMINATING CO., COMMONWEALTH EDISON CO., CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), DAIRYLAND POWER COOPERATIVE, DETROIT EDISON CO., IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT, ILLINOIS POWER CO., KERR-MCGEE NUCLEAR CORP., NORTHERN INDIANA PUBLIC SERVICE CO., NORTHERN STATES POWER CO., PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA, TOLEDO EDISON CO., UNION ELECTRIC CO., WISCONSIN ELECTRIC POWER CO., WISCONSIN PUBLIC SERVICE CORP.
References
NUDOCS 8205110579
Download: ML20052E968 (3)


Text

_

\\&i

\\'9

/co pe*

9p

'g[

.f\\

.., O Jg,,gA C

[r f 0 M'*

g M ' Cp i.,.9 May 5, 1982 c4 g tb.

s\\

Gentlemen:

This is to inform you that AT&T has revised the time intervals for normal service requests for ENS and HPN circuits. Upon receipt of an order from the NRC Telecommunications Branch, AT&T will schedule service according to the examples below.

1.

New service requiring the telephone company 60 working to conduct engineering tests / design and obtain days additional communications packages; Note: A move of an existing communications package that exceeds 10,000 cable feet from the main control room constitutes a new service.

2.

Additional instruments as part of existing 20 to 30 working packages; days 3.

Move of existing service (not exceeding 20 to 30 working distance limitation);

days 4.

Move of existing service within same building.

7 to 10 working days.

The above time intervals are based on availability of existing cable facilities, sufficient AC power for communications packages, informed con-tacts and accessibility to the work area by telephone company personnel.

t Requests made by licensees should first be coordinated with the regional office. The region will forward the request in writing to NRC Telecommunica-tions Branch, with copies to the resident inspectors. Telecommunications Branch will provide each office with a copy of the order to AT&T.

M 3f f

8205110579 820505 PDR ADOCK 05000010 F

PDR

4 2

May 5, 1982 If you have any questions, contact Roland Lickus of my staff at (312)932-2711.

Sincerely, Original signed by A. Bert Davis i

James G. Keppler Regional Administrator-e A

1 k

i I

/ff RII RI RII RI I RJI:I RlIIy Lickus/so on Paper ello H

Sp azf Davis Kepp er y

4/29/82 g

f/7

3/))$

American E15ctric Powar Strvics C5rporction

~

D. C. Cook 1, 2 (50-225, 50-316)

Cincinnati Gas and Electric Company Zimmer (50-358)

The Cleveland Electric Illuminat ing Company Perry 1, 2 (50-440, 50-441)

Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)

Byron 1, 2 (50-454, 50-455)

Dresden 1, 2, 3 (50-10, 50-237, 50-249)

La Salle 1, 2 (50-373, 50-374)

Quad-Cities 1, 2 (50-254, 50-265)

Zion 1, 2 (50-295, 50-304)

Consumers Power Ccmpany Big Rock Point (50-155)

Palisades (50-255)

Midland 1, 2 (50-329, 50-330)

Dairyland Power Corporation LACBWR (50-409)

The Detroit Edison Company Fermi 2 (50-341)

Illinois Power Company _

Clinton 1, 2 (50-461, 50-462)

Iowa Electric Light and Power Company Duane Arnold-(50-331)

Northern Indiana Public Service Company Bailly (50-367)

Northers, States Power Company

!!onticello (50-263)

Prairie Island 1, 2 (50-282, 50-306)

Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)

Toledo Edison Company Davis-Besse 1 (50-346)

Union Electric Company Callaway 1, 2 (40-483, 50-486)

Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)

Wisconsin Public Service Corporation Kewaunee (50-305)

Kerr-McGee Nuclear Corporation Docket No.70-925 Docket No. 70-1193 N Dl

oste It0UTING AND TRANSMITTAL.SUP

  • fj

% Name, onice symbol, room number, Eding, Agency / Pent)

'Ennans W

1.

9KC z

3.

4.

5.

M'B File Note and Retum "WM

, For Clearance Per Cc;rarsation As Requested For Cwi-- C-:-r, Circulate Prepare Reply

(

For Your information See Me Comment investigate Signature ri:: g; nation Justify REMARKS

)

hM M

fo St.t M Sa & W Y

Ltd W

wbulk a I

DO NOT use this form es a RECORD of approvals, concurrences, disposals, clearances, and similar actions FROM,(Name, ort symbol, Agency / Post)

Room No.--Bidg.

i Phone No.

( LMLL,beA&

88-3N

_ hh.)

Q p

f OPTg FORM 41

=a *> cM-n.=(Rev. 7-76)

. m,.., -....,. n,,,

i i

M