APR 2 71982
Docket No. 50-373
EkQf ,
Docket No. 50-374
\\
w
f\\J
Commonwealth Edison Company
f'
,ff.'
\\,I
ATTN:
Mr. Cordell Reed
.
Vice President
-
-i
Post Office Box 767
b'_
'
Chicago, IL 60690
k
,
\\ ",
/ ,/
/-
Gentlemen:
3
- /
- i; _.. ~^ ,
This refers to the routine safety inspection conducted by Mr. SUlb '
cott
of this office on April 16, 1982, of activities at the LaSalle County
Station, Units 1 and 2, authorized by NRC Construction Permit No. CPPR-99
and No. CPPR-100 and to the discussion of our findings with Mr. D. Shamblin
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
hTC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
B205110281 820427
Py ADOCK 05000
g/
,
Commonwealth Edison Company
2
April 27, 1982
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
gc at
R. C. Knop, Chief
Projects Branch 1
Enclosure: Inspection Reports
No. 50-373/82-24(DPRP) and
No. 50-374/82-24(DPRP)
cc w/ enc 1:
Louis O. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
,