Text
f O
THE CLEVEL AND ELECTRIC ILLUMIN ATING COMPANY P O. BOX 5000 e CLEVELAND, OHIO 44101 e TELEPHONE (216) 622-9800 m ILLUMINATING BLDG.
e 55 PUBLICSQUARE Serving The Best Location in the Nation Dalwyn R. Davidson UICE PRESIDENT O
SYSTEM ENGINEERING AND CONSTRUCTION April 23, 1982 g.
4 i,
!{n f
D4 g.
k
'g Mr. James G. Keppler C
4/ Iyf Director, Region III 1
%hk Office of Iaspection and Enforcement U. S. Nuclear Regulatory Commission N
p, 799 Roosevelt Road M
Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant, Docket Nos.
50-440, 50-441; Unit II Polar Crane Girder Weld Deficiencies (RDC 39(81))
REF: Final Report dated February 26, 1982 to Mr. James G. Keppler
Dear Mr. Keppler:
This letter serves to correct our Final Report of the Unit II Polar Crane girder weld deficiencies.
Subject Final Report is dated February 26, 1982.
In the portion of the report entitled " Corrective Action Taken to Date", we described the following action to be taken:
"... Once the repair weld is umpleted, it will be visually inspected and MT examined in accordance with approved procedures...."
This statement is incorrect.
Nonconformance Report No.17-136 which identified the weld deficiencies was dispositioned to include a visual inspection and an ultrasonic examination (UT). The Final Report inadvertently specified a visual inspection with an MT examination.
It is the intent of The Cleveland Electric Illuminating Company to perform a UT examination as specified in Nonconformance No.17-136.
This matter was discussed with Mr. E. H. Nightingale of your of fice during his inspection conducted at the Perry Nuclear Power Plant on April 22 and 2';,
1982.
6 0
oy e20511o255 820423 PDR ADOCK 05000440 gPR 29 q S
r p.
e d
Mr. James G. Keppler April 23, 1982 The above information supplements our Final Report on this matter.
If you have any questions, please call.
Sincerely, 4*7 Dalwyn. Davidson Vice President System Engineering and Construction DRD/llp cc:
Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D. C. 20555