ML20052E486
| ML20052E486 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/27/1982 |
| From: | Larry Wheeler Office of Nuclear Reactor Regulation |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8205110150 | |
| Download: ML20052E486 (4) | |
Text
s
}
f P
~
~
(
~q.
r
, Q>
J
i APR 2 71982 C
9 Docket Nos: 50-443 g
and 50-444 j
MEMORANDUM FOR:
F. J. Miraglia, Chief Licensing Branch FR0ti:
L. L. Wheeler, Project Manager, Licensing Branch No. 3 DL
SUBJECT:
MECHANICAL L:.GINEERING BRANCH MEETING WITH SEABROOK DATE & TIME:
M?y 10-13, 1982 LOCATION:
May 10: Seabrook Station May 11-13: United Engineers & Constructors, Inc.
30 South 17th Street, Philadelphia, PA PURPOSE:
1.
Observe present status of installation of selected plant components.
2.
Determine requirements for resolving open items related to MEB OL safety review.
AGENDA:
Attached PARTICIPANTS:
May 10, 1982: NRC PNL
_SEABROOK A. Cerne G. Beeman R. Tucker J. Parisano D. Rhoads
!!ay 11-13,1982: NRC PNL UE&C D. Terao, et. al.
G. Beeman H. Katz, et. al.
G. Marr Original Sign 9d By:
Louis L. Wheeler, Project Manager Licensing Branch No. 3 i
Division of Licensir.g cc: See next page 8205110150 820427 PDR ADOCK 05000443 A
PDR NOTE: NRC meetings are open to interested members of the public to attend as observers.
Members of the public who wish to attend this meetin contactL. Wheeler (301/492-7792), or F. Miraglia (301/492-7243)g must
, no later than 3:45 om. May 6. 10R2-
. ph;.t a. 3...
.n. -
.. 1.......
~~A
..Lu.hee1 r.:.P.t
.FM.h182 ia c"4 41.2....t.ea..
. 41.
NRCFORM 318 410,80l N RCM O240 OFFICIAL RECORD COPY
- * 'sesa28 82g
SEABROOK William C. Tallman Chairman and Chief Executive Officer Public Service Company of New Hampshire P. O. Box 330 Manchester, New Hampshire 03105 John A. Ritscher, Esq.
E. Tupper Kinder, Esq.
Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce B. Beckley, Project Manager Public Service Company of New Hampshire The Honorable Arnold Wight P. O. Box 330 New Hampshire House of Representatives Manchester, New Hampshire 03105 Science, Technology and Energy Committee State House G. Sanborn Concord, New Hampshire 03301 U. S. NRC - Region 1 631 Park Avenue Resident Inspector King of Prussia, Pennsylvania 19406 Seabrook Nuclear Power Station c/o U. S. Nuclear Regulatory Commission Ms. Elizabeth H. Weinhold P. O. Box 700 3 Godfrey Avenue Seabrook, New Hampshire 03874 Hampton, New Hampshire 03842 Mr. John DeVincentis, Project Manager Robert A. Backus, Esq.
Yankee Atomic Electric Company O'Neill, Backus and Spielman 1671 Worcester Road 116 Lowell Street Farmingham, Massachusetts 01701 Manchester, New Hampshire 03105 Mr. A. M. Ebner, Project Manager Norman Ross, Esq.
United Engineers and Constructors 30 Francis Street 30 South 17th Street Brookline, Massachusetts 02146 Post Office Box 8223 Philadelphia, Pennsylvania 19101 Karin P. Sheldon, Esq.
Sheldon, Harmon & Weiss Mr. W. Wrignt, Project Manager 1725 I Street, N. W.
Westinghouse Electric Corporation Washington, D. C.
20006 Post Office Box 355 Pittsburg, Pennsylvania 15230 Laurie Burt, Esq.
Office of the Assistant Attorney General Thomas Dignan, Esq.
Environmental Protection Division Ropes and Gray One Ashburton Place 225 Franklin Street Boston, Massachusetts 02108 Boston, Massachusetts 02110 D. Pierre G. Cameron, Jr., Esq.
General Counsel Public Service Company of New Hampshire P. O. Box 330 Manchester, New Hampshire 03105
s.
AGENDA MECHANICAL ENGINEERING BRANCH MEETING WITH SEABROOK MAY 10-13, 1982 DATE:
May 10, 1982 TIME:
8:30 AM to 12:00 Noon LOCATION:
Seabrook Station, Seabrook, New Hampshire Pacific Northwest Laboratory consultants Beeman and Marr tour appropriate portions of the Seabrook project to observe the status of installation of the following items:
Major reactor coolant system components Main steam system containment penetrations and guardpipe Pipe rupture protection devices (whip restraints, missile shields, isolation valves)
Small bore piping and restraints Main steam piping outside containment (from penetration to turbine)*
DATE:
May 11-13, 1982 TIME:
May 11 - 9:00 AM - 12:00 Noon & 1:00 PM - 4:00 PM May 13 - 9:00 AM - 12:00 Noon LOCATION: UE&C Offices, 30 South 17th Street, Philadelphia, PA The NRC Mechnical Engineering Branch (MEB) with consultants from Pacific Northwest Laboratory meet with Seabrook representatives to determine the status of open items in the_MEB OL safety review.
Discussion focus on previously submitted specific requests for additional information. The sequence of addressing each request is at the descretion of the participation.
By 12:00 AM on May 13, 1982, MEB will have developed an updated status report of each request for information.
For those requests still open, the report will include a brief statement of action required to close the item and a date the action is to be completed.
1
-s MEETING NOTICE DISTRIBUTION Document Control (50- 440/441)
NRC PDk LPDR TERA NSIC LB#3 Files JLee Project Manager L. Wheeler ECase DEisenhut/RPurple RTedesco (only if participant or if held in Bethesda)
JYoungblood ASchwencer FMiraglia EAdensam JMiller Glainas WRussell DCrutchfield TIppolito JKnight WJohnston DMuller TSpeis RHouston LRubenstein FSchroeder MErnst JKramer (Division Directors - only if participant in meeting)
Attorney, OELD R. Lessy Ol&E Regional Administrator, Region _I Resident Inspector ACRS (16)
OSD (7)
NRC Participants cc: Service List b