Forwards Results from First Inservice Eddy Current Exam of Steam Generators Conducted During Current Refueling Outage
ML20052D842
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/05/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20052D846 List:
References
267, NUDOCS 8205070259
Download: ML20052D842 (1)


Text

.. r- a

)

VIRGINIA ELucraIc Axi> Powun COMPANY HICIIMONI), VIItOINIA 20 261 H. II. LE AMBUNO vice Panaromwr Noctuam oranarsons May 5, 1982 Mr. Harold R. Denton, Director Serial No. 267 Office of Nuclear Reactor Regulation N0/RMT:acm Attn: Mr. Robert A. Clark, Chief Docket No. 50-339 Operating Reactors Branch No. 3 License No. NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

NORTH ANNA UNIT TWO STEAM GENERATOR INSERVICE INSPECTION SPECIAL REPORT Enclosed are the results of the first inservice eddy current examination of steam generators conducted during the current refueling outage as requested by your staff. The North Anna Station Nuclear Safety and Operating Committee (SNSOC) reviewed this report and determined that the minor denting raises no safety concerns and continued operation is justified.

This report is not being submitted pursuant to North Anna Power Station Technical Specifications as the results are not above the minimum required for reportability.

Very truly yours,

~

R. H. Leasburg Enclosure