Requests Info Re Five-Yr Reactor Bldg Tendon Surveillance Rept for AR Nuclear One-Unit 1. Info Requested within 90 Days from Date of Ltr
ML20052D519
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/29/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8205060539
Download: ML20052D519 (2)


Text

e p' APRIL 29N b

DISTRIBUTION Cpocket File)

NRC PUK L PDR fEsnu Docket No. 50-313 ej, s\\

OELD h00 6

ItECElv50<

,g )

Mr. William Cavanaugh, III 2

ACRS-10 APR 301982 Senior Vice President

{

n smu taxa csF' /)

GVissing Energy Supply

'***W RIN ram Arkansas Power & Light Company Gray File P. O. Box 551 t

y

$ lac d

Little Rock, Arkansas 72203 a "

Dear Hr. Cavanaugh:

ne We have been reviewing the "Five Year Reactor Building Tendon Surveillanch Report for Arkansas Huclear One - Unit 1."

In order to complete our review, the following infomation is needed:

(1) The minimum average design values for the hoop, dome, and vertical tendons; (2) The initial seating force of the hoop, dome and vertical tendons; and (3) The acceptance criteria used for the tendon surveillances conducted at 1 and 3 years after the initial structural integrity test.

We rqquest the above information be submitted within 90 days from the date of this request.

Sincerely,

" ORIGINAL SIG2:3D By JWa r.srgng, John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing cc: See next page 8205060539 820429 PDR ADOCK 05000313 P

PDR

omc,

..... 0R,4,;,D L,,,,,,,,Q,-Og,4,;,pt GV ng;cf JS to k...:

suaeaus>

p l

............/. 82

...../,

2 4

oue, snc ror<u sia tio-noj uncu ano OFFICIAL RECORD COPY usam m,_um

g-Arkansas Power & Light Company cc w/ enclosure (s):

fir. John R. Marshall Manager, Licensing Arkansas Power & Light Company P. O. Box 551 Director, Bureau of Environmental Little Rock, Arkansas 72203 Health Services 4815 West Markham Street Mr. James P. O'Hanlon Little Rock, Arkansas 72201.

General Manager Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Mr. William Johnson U.S. Nuclear Regulatory Commission P. O. Box 2090 Russellville, Arkansas 72801 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Mr. Nicholas S. Reynolds Debevoise & Liberman 1200 17th Street, NU Washington, DC 20036 Arkansas Tech University Russellville, Arkansas 72801 Honorable Ermil Grant Acting County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Regional Radiation Representative EPA Region VI 1201 Elm Street Dallas, Texas 75270 fir. John T. Collins, Regional Administrator U. S. Nuclet Regulatory Commission, Region IV

$1 Arling n a

i

7

[(' ) 3(f(,p, f

'o,,

UNITED STATES k

NUCLEAR REGULATORY COMMISSION s.

WASHINGTON, D. C. 20555

'+A ),'(, #

April 29,1982

)

?

Docket No. 50-313

\\Mr. William Cavanaugh, III Seqior Vice President Eney Supply 4

Arkansa Power & Light Company P. O. Bo 51 Little Rock, Arkansas 72203

)

Dear Mr. Cavanaug We have been reviewing the "Five Year Reactor Building Tendon Surveillance Report fonArkansas Nuclear One yUnit 1."

In order to complete our review, the following infonnation is needed:

'N The minimum average design values for/

(1) the hoop, dome, and vertical tendons; N

'N (2) The initial seating force of t e oop, dome and vertical tendons; and (3) The acceptance criteria used or e tendon surveillances conducted at 1 and 3 years a ter the\\ initial structural integrity test.

We request the above informat n be submitted 'ithin 90 days from w

the date of this request.

K

ncerely, 2

~

oh

Stolz, Chief perating Reactors Branch #4 s

D Wision of Licensing

\\