Notice of Violation from Insp on 820209-0322
ML20052D146
Person / Time
Site: Maine Yankee
Issue date: 04/23/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20052D143 List:
References
50-309-82-01, 50-309-82-1, NUDOCS 8205060312
Download: ML20052D146 (1)


Text

.

APPENDIX A NOTICE OF VIOLATION Mahe Yankee Atomic Power Company Docket No. 50-309 Maine Yankee Atomic Power Station License No. DPR-36 As a result of an inspection conducted at the Maine Yankee Atomic Power Station.

on February 9 - March 22, 1982 and in accordance with Enforcement Policy, 47 FR 9987 (March 9,1982), the following violation was identified:

10 CFR 50, Appendix B, Criterion III, requires desigri control measures to be implemented for field changes.

The Maine Yankee Operational Quality

. Assurance Program as implemented by Procedure 0-01-03, Installation /

Fabrication Instructions, Revision 0, requires changes to install.ation instructions for safety related modifications to be reviewed and approved by the same organizations that approved the original instructions.

Contrary to the above, on March 8, 1982; the installation instructions for Engineering Design Change Request 80-45, Change 3, Time Delay Feature for Secondary Component Cooling Pumps, were changed without review and approval from an independent engineer or the quality assurance departraent, both of whom had approved the original instructions.

This is a Severity Level V violation (Supplement 1.E).

Pursuant to the provisic,qs of 10 CFR 2.201, Maine Yankee Atomic Power Company is hereby required to sul mit to this office within thirty days of the date of this Notice, a written s:atement or explanation in reply, including:

(1) the corrective steps which tave been taken and the results achieved; (2) corrective steps which will'be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation. Where good cause is shown, consideration will be given to extending your response time.

,ksd APR 23 M

/

original signea syn Dated ichard W. Starostecki, Wtor Division of Project and se(sident Programs OFFICIAL RECORD COPY 8205060312 820423 t