Interim Deficiency Rept Re Unit 1 Main Control Panel JM-200 Violation of Wiring Separation Requirements,Initially Reported 811230.Investigation Continuing.Final Rept Will Be Submitted by 820524
ML20052C385
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20744-GHD, DER-81-53, NUDOCS 8205040740
Download: ML20052C385 (2)


Text

Docket Nos. 50-528/529/530

  • gN -

50.55(e) Report

>/

2331rEDhM IFJMEMD SENEFJDEni @ @31ER M 3?J

,/

PHOENIX, AR6ZON A 85036 p, O. B O X 216 6 6 April 22, 1982 ANPP-20744-GHD/BSK U. S. Nuclear Regulatory Commission 5

Region V cp) "'

4 7

Creekside Oaks Of fice Park Ny'

\\q j

g

~1450 Maria Lane - Suite 210 (j y,,

^

gj g

g 7-a Walnut Creek, California 94596-5368 Jf 319825-h'3 E

Attention:

Mr. T. W. Bishop, Chief j

' ' ' 'f Reactor Construction and

y. g:;m mg _,

y Engineering Support Branch 4R f oa 1

3 1,y

3

~

Subject:

Time Extension for Report - DER 81 (3f:-

g A 50.55(c) Potentially Reportable Def(iency R ating to Unit 1 Main Control Panel (JM-200) VioTaTes Wiring Separation Requirements File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on December 30, 1981 (B) ANPP-20013, dated January 28, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A) and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by April 22, 1982.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 24, 1982, when a complete report will be submitted.

There is no change to the Interim Report at this time.

Very truly your

)

COLL q u.L E.'E. Van Brunt, Jr.

APS Vice President Nuclear Projects

' ANPP -Project Director' EEVBJr/GHD:ske cc: 'See Attached Page 2 1(

8205040740 820422 O,PDR ADOCK 05000528 PDR T.2 -105 a

iu U. S. Nucless R,eguistory Commission Attention:

Mr.

T. W. Bishop, Chief

- ANPP-20744-CHD/BSK April 22, 1982 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson

~

L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee Hourihan 6413 South 26th Street

. Phoenix, Arizona 85040

)

.