ML20052C256
| ML20052C256 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 04/16/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Borgmann E CINCINNATI GAS & ELECTRIC CO. |
| Shared Package | |
| ML20052C257 | List: |
| References | |
| NUDOCS 8205040540 | |
| Download: ML20052C256 (2) | |
See also: IR 05000358/1982002
Text
_
f
.
.
-
,
.*
APR 1 6 082
Docket No. 50-358(DPRP)
Cincinnati Gas and Electric
/7
- 3
.
Company
./
,a
g
ATTN:
Mr. Earl A. Borgmann
j
3 bp ;
,,
[.J
Senior Vice President
-7
-
O, WM ,. c WM -f
Engineering Services and
..
Electric Production
\\
s
'
139 East 4th Street
Q
y
%)N
Cincinnati, OH 45201
fiTCp
-Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
W. F. Christianson, T. P. Gwynn, K. D. Ward, and J. D. Schapker of this
office on February 1-5, 8-12, 16-19, 22-26, and March 1-5, 1982, of
~ activities at Wm. H. Zimmer Nuclear Power Station authorized by NRC
Construction Permit No. CPPR-88 and to the discussion of our findings
with Messrs. J. R. Schott, D. J. Schulte, and others at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten-(10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must-
i
8205040540 820416
'
rho f
' ^PDR ADOCK 05000358
I
e
PDn
pi
-_
</
.
O
.
,
- .
Cincinnati Gas and Electric
2
April 16, 1982
Company
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
4
Sincerely,
d
"Orfginal signed by R.L. spessard"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure:
Inspection Report
,
No. 50-358/82-02(DPRP)
cc w/ enc 1:
J. R. Schott, Plant Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Citizens Against a Radioactive
Environment
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
k
RII
RIII
RIII
hHunter
3[r#
M
v
Spps, ard,
w d/jp
Dage son
Streeter
- /f f *'
4/13/82
/
h
-