Text
i
4
'
1
March 16, 1982
h
9
Docket No. 50-254
9
/
Docket No. 50-265
d
__
INN
-
Commonwealth Edison Company
,
.
- 1TN:
Mr. Cordell Reed
I,
,
7982A - 3
'
Vice President
"
]y ,
tr a[ i
Post Office Box 767
Chicago, IL 60690
g
y.!
3"? @
\\
Gentlemen:
Al_W
This refers to a special inspection conducted by Messrs. S. DuPont and
J. Patterson of this office on January 26 and February 8, 1982, of activities
at Quad-Cities Nuclear Power Station, Units 1 and 2, and to the discussions
of our findings with Mr. N. Kalivianaskis and others of your staff at the
conclusion of the inspection.
This inspection of your prompt public notification / warning system was con-
ducted to determine whether your system as described in your letters of
December 14, 1981, and January 15, 1982, has been installed and tested.
Final judgment to determine if your system meets the full design objectives
of Appendix 3 of NUREG-0654 will be made jointly by NRC and FEMA in the
near future.
Our interim findings indicate that your system appears to meet the require-
ments of 10 CFR 50, Appendix E, Section IV.D.3.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
.NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
8205040502 820316
PDR ADOCK 05000254
-
G
<
_.
.
.
Commonwealth Edison Company
2
March 16, 1982
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
' part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
56
b
C.
. Pa
iello, Chief
Operational Support
Enclosure:
Inspection Reports
No. 50-254/82-04 and
No. 50-265/82-05
1
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII