Advises That Final Deficiency Rept Re Unit 1 Diesel Generator Control Cabinet Wiring Will Not Be Finalized Until 820524.Delay Due to Extensive Investigation & Corrective Action
ML20052C209
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/20/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20752-GHD, NUDOCS 8205040500
Download: ML20052C209 (2)


Text

._.

Docket Nos. 50-528/529/530 50.55 (e) Report JVTlJ Q r "',

AL9382rWLE

/; f}

IFUJ3123D 52 GIT 1WICDIs ONKPN PHOENIX, ARIZON A 85036 P. O. BOX 216 a 6 April 20, 1982 ANPP-20752-CHD/BSK 1 0 1 U. S. Nuclear Regulatory Commission g@

4 Region V O

\\

Creekside Oaks Office Park D

~

1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 g

Qqy gg 2

Attention:

Mr. T. W. Bishop, Chief

- ] g ~a ar p a Reactor Construction and

)j 3"awi n d Engineering Support Branch g t,O

)

Subject:

Time Extension for Report - DER 81-51 en i

A 50.55(e) Potentially Reportable Deficiency Relating l

to Unit 1 Diesel Generator Control Cabinets Wiring Not Separated Between Class 1E and Non-Class 1E i

Pile: 82-019-026 i

D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on December 30, 1981 (B) ANPP-20015, dated January 28, 1982 (Interim Report)

(C) ANPP-20483, dated March 19, 1982,(Extension)

.l.

4

Dear Sir:

The NRC was notified of the subject deficiency evaluation in Reference (A). An Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by April 23, 1982.

Due to the extensive investigation and corrective action required, it is now expected that this information will be finalized by May 24, 1982, at l

which time a complete report will be submitted.

There is no change to the Interim Report at this time.

1 Verytrulyyoy M!,*,I'O'H8 g

L C.

Clll.

LLL p E. E. Van Brunt, Jr.

b.n,El I,.c, 63....l 2 eel cd APS Vice President 7

t.

i r205040500 820420 Nuclear Projects PDR ADOCK 05000529 ANPP Project Director

//

.s.,h, S

PDR w

EEVBJr/GHDiske i

cet.See Attached Page 2 L

B2-10N

U. S. Nucis;r gegulgtory Commis2icn Attentiont Mr.

T. W. Bishop, Chief ANPP-20752-CHD/BSK April 20, 1982 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson l

R. W. Welcher R. M. Grant D. R. Hawkinson

]

L. E. Vorderbrueggen i

R. L. Greenfield i

Assistant Attorney General i

Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricin Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 t

i i

[

t i

e

. _.