ML20052C197

From kanterella
Jump to navigation Jump to search
Informs of Visual Exam of Core Spray Spargers & Associated Piping During Maint/Refueling Outage Currently in Progress, Per IE Bulletin 80-13, Cracking in Core Spray Spargers. No Cracking Detected
ML20052C197
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/22/1982
From: Beckhan J
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-80-13, NUDOCS 8205040488
Download: ML20052C197 (1)


Text

f" 3 Go ?q a Poe r Cr.'r Nny 8 T.O P e j '. ort Ave"uo e

> ' i Ge'na 10308

- # ' 404 s "

USNRC REGION :~

u .&g AMm AIL.ANId fy { C Ql*,lf fi t Off r+ Bcs 4545 A: .h Gosrg a 3937%

B2 APR 28 AID : 3

"'~ # ' *'#

J. T. Beckham. Jr.

lO. Pr ^ Tri amn Gs:rt rat ?},1 3y w mr cemu April 22,1982 r)} n

/i'/ ',

u

! ":9q % M i

, ,(N N ~. .

U. S. Nuclear Regulatory Commission

REFERENCE:

9 '.-

~

O

Office of Inspection and Enforcement RII: JP0 Region II - Suite 3100 50-366 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 80-13 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:

Pursuant to the requirements of NRC I&E Bulletin 80-13, " Cracking In Core Spray Spargers," please be advised that a visual examination was performed on the Hatch Unit 2 Core Spray spargers and associated piping during the maintenance / refueling outage currently in progress. The results were satisfactory and are as follows:

Using remote underwater television cameras (with the required viewing in situ of 0.001 in. diameter fine wires), no cracking of the Core Spray spargers or section of piping between the inlet nozzle and the vessel shroud was detected.

If you have any questions in this regard, please contact this office.

Sincerely yours, h,f_E f f/J. T. Beckham, Jr.

3 /mb xc: H. C. Nix, Jr.

R. F. Rogers, III NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection 8205040488 820422 PDR ADOCK 05000366 G PDR

[h/