ML20052C176

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-12 Re Installation of Instrument Clamps W/O Calculations for Thermal Expansion & Seismic Requirements.Submission of Final Rept Extended to 820510 from 820426
ML20052C176
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20778-GHD, NUDOCS 8205040464
Download: ML20052C176 (2)


Text

_-

Docket Nos. 50-528/529/530

50. 55 (e) Report

'^

j, C', "

SM$

j\\

W[STS M PNS O

Y P O. SQX 21666

  • PHOENIX, ARIZON A 85036 April 22,-1982-ANPP-20778-GHD/BSK
m.,,

,,p, U. S. Nuclear Regulatory Commission sp 7,,

g Region V-9/

[1 9

e m

j 9

.,. js Creekside Oaks Office Park x.J/

E F

w 5 'J3 m

1450 Maria Lane - Suite 210 3

Walnut Creek, California 94596-5368 3 GB2 #

t 3

h3 h

Attention:

Mr. T. W. Bishop, Chief e}

3 rcr Reactor Construction and ti.M g N

g.,

Engineering Support Branch p

a J

Subject:

Time Extension for Report - DER A 50.55(e) Potentially Reportable Deficiency Relating to Instrument Clamps Installed Without Calculations for Thermal Expansion and Seismic Requirements Pile: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. H. Duckworth on March 26, 1982

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A). At that time, it was estimated that a Final Report would be avail-1 able by April 26, 1982.

i Due to additional time being required for evaluation, it is now expected that this information will be finalized by May 10, 1982, when a complete report will be submitted.

Very truly yours Cllk

%LL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:skc I69 cc: See Attached Page 2 g

/ /

B205040464 820422 PDR ADOCK 05000528 S

PDR

$ck-l DN

U. S, Nucisg Keguletory Connaission Attention: Mr.

T. W. Bishop, Chief ANPP-20778-GHD/BSK April 22, 1982 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide I

J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant

~

D. K. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General

- i Bataan Memorial Euilding Santa Fe, New Mexico 87503 i

Ms. Patricia Lee Hourihan 6413 South 26th Street j

Phoenix, Arizona 85040 l

J i

i N

g a

e-