&J/D taos April 9,1982 Dockets ( 50-313 50-368
&g\\ p-
\\
Arkansas Power and Light Company ATTN: Mr. William Cavanaugh III ej'
?,,
Senior Vice President - Energy Supply ts
\\-
, _ 2 " @-
Post Office Box 551 T
Little Rock, Arkansas 72203 l
h(-
~ 3 Gentlemen:
&o
,y This letter is to confirm the agreements reached between you andgand d,
members of our respective staffs on April 8 and 9,1982, concerning-the ~
adequacy of your response to IE Bulletin 80-06, " Engineered Safety Feature (ESF) Reset Controls," dated March 13, 1980. During our discussion in a meeting in the Region IV office on April 8, and in telephone discussions on April 9, you indicated that you would reevaluate the ac'tions taken in response to IE Bulletin 80-06 to include:
a.
An engineering review of the electrical schematics for Unit 2 to identify all ESF components to be considered as required by IE Bulletin 80-06.
b.
Identification of ESF components which have not been tested as specified in Action Statement 2 of IE Bulletin 80-06.
c.
Evaluation of the safety implications of this failure to test. This safety evaluation would be documented and furnished to this office by April 16, 1982.
d.
Identification of any valves or other ESF components not modified as specified in IE Bulletin 80-06 and provision of your Dasis for not modifying them.
e.
Confimation that testing was performed to verify the adequacy of modification for any valves or ESF components previously modified to confom to guidance of Action Statement 3 of IE Bulletin 80-06.
f.
Definition of testing and any additional modifications necessary to be fully responsive to the actions specified in IE Bulletin 80-06 by April 16, 1982, such that these activities may be accomplished at the earliest opportunity for Unit 2, but not later than restaption of e'
operation following the next cold shutdown.
y[I 8205040406 820409
/
PDR ADOCK 05000313 y' '
[
G PDR RETURN-RECEIPT-REQUES p'
(
.0(JEaglfardo. EJA Y.0/4 IV
....I6.....
....RPS..0/db..RPB2....
P.&EP.......
l
- na>
hit....
M..
EHyhpnson REHafl/nh WCSeidle ns sunex >
4 * ".4/9/82" '
" ~4/9/82"
~ 4/9/82T
" 4/ 9/82 """
"'0 5 /82" "
9/82"'
i
.......... ~
.... ~ ~ ~
Nnc ronu si8 oo-so) NRCM ONO OFFICIAL RECORD COPY
,,. ~.
Arkansas Power and Light Company April 9, 1982 9
For Unit 1, evaluate the actions taken and correspondence previously furnished to the Nuclear Regulatory Comission to identify the need for additional corrective action or testing required as a result of the evaluations being perfonned for Unit 2.
You also indicated that if any problems are identified during your review of the schematics or perfonnance of testing, which after your verification would alter the conclusions previously reported to the Nuclear Regulatory Comission relative to IE Bulletin 80-06, you would promptly report this matter to us for our evaluation.
If your understanding of your comitments described above is not in accordance with your actual plans or actions, please contact this office within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of your receipt of this letter by telephone (817) 465-8100.
Sincerely, Original signed by John T. Collins John T. Collins Regional Administrator cc:
Arkansas Nuclear One ATTH: James P. O'Hanlon General Manager Post Office Box 608 Russellville, Arkansas 7?801 bcc to DMB for dist.
bec dist. by RIV BC NRR/DHFS RRI PM NRR/0LB Section Chief AE0D RAD ASMT BR Regional Admini.strator ELD RESEARCH Enforcement Assistant IE FILE LPDR Arkansas State Dept. of Health r
IE/RPRIB NSIC G. Vissing, NRR l