Discusses Review of 820304 Proposed Outline for Chapter 7 of Environ Rept Re Environ Effects of Accidents.Info on Class 9 Accidents May Be Addressed in Probabilistic Safety Study.Items to Be Addressed in Section 7.1.9 Listed
ML20052B950
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/08/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8205040182
Download: ML20052B950 (3)


Text

,

er DISTRIBUTION:

MDocketFileJ bec: TERA LB#1 Rdg.

PDR MService LPDR JGrant NSIC 0

Docket !!o.:

50-423 DEisenhut TIC SHanauer ACRS(1 RMattson o

cc s

Mr. W. G. Counsil, Sr. Vice President HThompson N

8, }/

c3

}!uclear Engineering & Operations RVollmer g

o j?

Northeast Nuclear Energy Conpany RHartfield, MPA 2

3'

/c0 44 g Post Office Box 270 OELD g

,[jfy i

Hartford, Connecticut 06101 OIE p

1.@ M LGHulman

Reference:

(1) Letter, M. G. Counsil to D. G. Eisenhut, dated March 4, g

, //

7

Dear ik. Counsil:

%4 3 tT -

Subject:

Discussion of Class 9 Accidents in the Environmental Report (Operating License)

Per your letter of !! arch 4,1982 (Counsil to Eisenhut), the staff has reviewed the proposed outline for Chapter 7 of the Millstone Unit No. 3 Operating License Environmental Report (ER), titled, " Discussion of Potential Environnental Effects of Accidents Involving the Station." The staff agrees that the information generally provided in Chapter 7 on Class-9 accidents nay be fully addressed in the Probabilistic Safety Study (PSS), and therefore, only referenced in Section 7.1.9, " Class 9 -

Accidents Beyond the Design Bases of the Millstone Unit No. 3 Plant." The PSS, a comprehensive probabilistic risk assessnent study being conducted for flillstone Unit flo. 3 is to be submitted by Northeast Utilities (NE) within six months of the FSAR docketing.

In addition to referencing the infornation for Class-9 accidents to the PSS, Northeast Utilities must also address at least the following in Section 7.1.9 of the ER:

1.

the intention to conply with the Commission's Statenent of Interim Policy (Federal Renister/Vol. 45/No.116), dated June 13, 1980, and titled "Huclear Power Plant Accident Considerations Under the National Environmental Policy Act of 1969,"

2.

the intention to fully address the above Interin Policy in the fli11 stone Unit No. 3 PSS, and 3.

the connitnent to indeed submit the PSS within six nonths of the FSAR docketing as stated in Reference 1.

R20504'O Wr.

o,,,m suaame >

om)

NRc,ORM 318 W80) NRCM Quo OFFIClAL RECORD COPY usceom-muo

~

u.

Mr. W. G. Counsil Apg gjggi Should you have any questions on the above, please contact the Millstone Unit flo. 3 Project Itanager, Jane Grant, at 301-492-7793.

Sincerely, Originhl SW N Robert L. Tedesco Robert L. Tedesco, Assistant Director for Licensing Division of Licensing cc: See next page 1

0$

B LGHulman 4/6/82 g

ndl

{"1. (....

.DL..:

. /...

omce > DL.:

J.9....j.J

,,,p,ph,.

,co,,,,

.j.y.g. g.

sua~=e>

om>

Nac rosu ais oo-eoi sacu o24o OFFICIAL RECORD COPY -

usam mi-m o L_

Mr. W. G. Counsil Senior Vice President Nuclear Engineer 1ng and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06101 cc: Mr. Harve L. Plasse, Manager R. W. Bishdp, Esq.

, City of Chicopee Electric Corporate Secretary Light Department Northeast Utilities 725 Front Street Post Office Box 270 Chicopee, Massachusetts 01014 Hartford, Connecticut 06101 Mr. Guy W. Nichols, President Mr. Richard T. Laudenat, Manager New England Electric System Generation Facilities Licensing

20. Turnpike Rd.

Norttieast Utilties Service Company Westborough, Massachasetts 01581 Post Office Box 270 l

Hartford, Connecticut 06101 Mr. Bruce R. Garlick Manager, Energy Supply Mr. J. C. Mattia Fitchburg Gas and Electric Resident NRC Inspector Light Company Office of Inspection and Enforcement 655 Main Street U. S. Nuclear Regulatory Commission Fitchburg, Massachusetts 01420 Post Office Box 128 Waterford, Connecticut 06385 Mr. D. Pierre G. Cameron, Jr.

General Counsel Mr. E. R. Foster, Director Public Service Company of Generation Construction New Hampshi;-=

Northeast Utilities Service Company 1000 Elm Street Post Office Box 270 Post Office Box 330 Hartford, Connecticut 06101 Manchester, New Hampshire 03105 Mr. Bruce McKinnon Gerald Garfield, Esq.

Power Contracting Manager Day, Barry & Howard Massachusetts Municipal Whblesale One Constitution Plaza Electric Company Hartford, Connecticut 06103 Post Office Box 426 Ludlow, Massachusetts 01056 John D. Fassett, Chairman &

Chief Executive Officer Mr. Bruce H. Grier The United Illuminating Company U. S. NRC, Rpgion I

. 80 Temple Street 631 Park Avenue New Haven, Connecticut 06506 King of Prussia, Pennsylvania 19406 Mr. R. O.,Bigelow, Vice President New England Power Company 20 Turnpike Road Westborough, Massachusetts 01581 rt