Forwards IE Insp Repts 50-259/82-09,50-260/82-09 & 50-296/82-09 on 820319-23.No Noncompliance Noted
ML20052B926
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/08/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20052B927 List:
References
NUDOCS 8205040153
Download: ML20052B926 (2)


See also: IR 05000259/1982009

Text

_ -

_ _

_

._.

. . . _ _

.._

-

.

.

.

[f 61)

APR

8 1982

QNk'S,/,4

Tennessee Valley Authority

O

Nc#

ATIN:

Mr. H. G. Parris

_

, .

Manager of Power

<-

500A Chestnut Street Tower II

gigB7.7 Q

'

,

Chattanooga, TN 37401

Ni

q "MuT6e9

-

-3

A

Gentlemen:

Eg)

  1. M

/

Subject:

Report Nos.h59/82-09) 50-260/82-09 and 50-296/Nkt

e

This refers to the routine safety inspection conducted by Mr. H. L. Whitener

of this office on March 19-23, 1982, of activities authorized by NRC Operating

License Nos. OPR-33, DPR-52 and DPR-68 for the Browns Ferry facility and to the

discussion of our findings held with Mr. G. Jones, Plant Manager, at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

j.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

,

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

'

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

i

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

,

!

them with you.

_

!

!

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

,

>

'

Enclosure:

See Page 2

i

8205040l53

fEo/ 4

~

.

,

.

.

Tennessee Valley Authority

2

Enclosure:

Inspection Report Nos. 50-259/82-09,

50-260/82-09 and 50-296/82-09

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

RII

RII

RII

RII

'fr*diL)

[ff'z

$Y

'k

rip

HLWhitener:ht

FJ e

ARHerdt

RButcher

FSCantrell

4/ 7/82

4/ 7/82

4/'I/82

4/7 /82

4/$'/82

.