_ -
_ _
_
._.
. . . _ _
.._
-
.
.
.
[f 61)
APR
8 1982
QNk'S,/,4
Tennessee Valley Authority
O
Nc#
ATIN:
Mr. H. G. Parris
_
, .
Manager of Power
<-
500A Chestnut Street Tower II
gigB7.7 Q
'
,
Chattanooga, TN 37401
Ni
q "MuT6e9
-
-3
A
Gentlemen:
Eg)
- M
/
Subject:
Report Nos.h59/82-09) 50-260/82-09 and 50-296/Nkt
e
This refers to the routine safety inspection conducted by Mr. H. L. Whitener
of this office on March 19-23, 1982, of activities authorized by NRC Operating
License Nos. OPR-33, DPR-52 and DPR-68 for the Browns Ferry facility and to the
discussion of our findings held with Mr. G. Jones, Plant Manager, at the con-
clusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
j.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
,
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
'
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
i
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
,
!
them with you.
_
!
!
Sincerely,
F. S. Cantrell, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
,
>
'
Enclosure:
See Page 2
i
8205040l53
fEo/ 4
~
.
,
.
.
Tennessee Valley Authority
2
Enclosure:
Inspection Report Nos. 50-259/82-09,
50-260/82-09 and 50-296/82-09
cc w/ encl:
H. J. Green, Director of Nuclear Power
G. T. Jones, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Tennessee
RII
RII
RII
RII
'fr*diL)
[ff'z
$Y
'k
rip
HLWhitener:ht
FJ e
ARHerdt
RButcher
FSCantrell
4/ 7/82
4/ 7/82
4/'I/82
4/7 /82
4/$'/82
.