ML20052B706
| ML20052B706 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/22/1982 |
| From: | Oprea G HOUSTON LIGHTING & POWER CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8205030479 | |
| Download: ML20052B706 (11) | |
Text
.
The Light Company in,1,si.,,, ugi, mig m>,m m n.,x imi n.7,si.,ii. i-,,mii mmes.mn March 22, 1982
~h ST-HL-AE-809
,4't
/
SFN: V-0100
's;j)
QN
/
y'9
'l
\\.-
o p '$
- a [p
- y Mr. John T. Collins db p
/
Regional Administrator, Region IV N:; ;
'xx N'M$y/
Nuclear Regulatory Connission 611 Ryan P1aza Dr., Suite 1000 Arlington, TX 76012
Dear Mr. Collins:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Response to Request for Information Pursuant to 10CFR50.54(f)
As requested by your letter of February 12, 1982, we are providing you with a description of the organizational structure and relationships among HL&P, Bechtel, and Ebasco with respect to responsibilities for quality assurance, design review, and design verification.
Should you require additional infonnation, please contact Mr. M. E.
Powell at (713) 877-3281.
Very tru y ours,,
x
/
/
. Opr' a, Jrf.
Executive Vice President LJK/blt Attachment r ~ r.-,
419 U b/
82,05030 f
'/
1
Ilouston IJghting & Power (kunpany cc:
G. W. Oprea, Jr.
March 22, 1982 J. H. Goldberg ST-HL-AE-809 J. G. Dewease SFN: V-0100 J. D. Parsons Page 2 D. G. Barker l
C. G. Robertson i
R. A. Frazar J. W. Williams J. W. Briskin i
J. E. Geiger R. L. Ulrey S. M. Dew i
J. T. Collins (NRC)
D. E. Sells (NRC)
W. M. Hill, Jr.
(NRC)
M. D. Schwarz (Baker &Botts)
R. Gordon Gooch (Baker &Botts)
J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 R. L. Range /G. W. Muench Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 d
R. L. Hancock/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. 0. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harnon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of-the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D..C.
20555 Revision Date 2-22-82 1
h
a UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter S
S Houston Lighting & Power S
Docket Nos. 50-498 Company, et al.,
S 50-499 S
South Texas Project S
Units 1 and 2 S
AFFIDAVIT G. W. Oprea, Jr. being duly sworn, hereby deposes and says that he is an Executive Vice President of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Response to Request For Infonnation; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief.
j j
G.' W. J)p(s'ai Execut ve Vice sident STATE OF TEXAS S
S COUNTY OF HARRIS S Subscribed and sworn to before me, ka Notary Public in and for Harris M
day of 11onc
, 1982.
County, Texas this
}EU1AS lkL
~
m l
h/
l Notary Public in er.d.for the U
State of Texas gultillifff My commission expires:
p p, l
BEVERLY J. FITE 5
Ue
% Nblic. State of Texa9 I
~ g:
g l
Mv enmmie w y
.at yr I
=
=
I i,1
!"E
'It
\\
ATTACHMENT l
l I.
Project Management Overview Houston Lighting & Power Company (HL&P), acting as PROJECT MANAGER for itself and the other owners, City Public Service Board of San Antonio, City of Austin, and Central Power and Light Company, has responsibility for design, engineering, procurement, fabrication, quality assurance, construction and, operation of the South Texas Project. HL&P has contracted with Westinghouse Electric Corporation (Westinghouse) for the design, fabrication and quality assurance (QA) services for the nuclear steam supply system, and with Bechtel Power Corporation (Bechtel) for plant design, procurement, engineering, con-struction management, QA and other related services including OA services for Westinghouse items upon receipt at the Project site.
HL&P has contracted with Ebasco Services Incorporated (Ebasco) for construction services including 0A and quality control (QC) for its scope of work.
Figure 1 shows the organizational structure and functional relationship among HL&P, Bechtel and Ebasco for the four major functional areas: 0A, Engineering, Construction, and Controls.
Project direction is provided from the HL&P Manager, South Texas Project, to the Project Manager of Bechtel. The HL&P Project organizations provide a performance overview of the respective Bechtel Project organizations.
Bechtel, as Construction Manager, directs the activities of Ebasco and performs a QA overview of Ebasco activities. Bechtel is responsible to assure that all Balance of Plant systems meet the NSSS interface requirements. Bechtel is also responsible for any necessary techni-cal review of the NSSS equipment and associated support services. HL&P project management provides programatic overview and direction relative to the Bechtel-Westinghouse interface.
The current internal organizational structures of HL&P, Bechtel and Ebasco for the South Texas Project are shown in Figures 2, 3 and 4, respec-tively.
Although there may be modifications to these internal structures, the functional relationships between the respective organizations will remain as indicated by Figure 1.
II, Quality Assurance The QA Program for STP is described in the Ouality Assurance Program Des-cription, Revision 3 (QAPD), which was submitted to NRC by letter dated March 9, 1982. Figure 5 shows key aspects of the relationships and responsibility of the respective QA organizations. The STP QA organizations coordinate with project management for day-to-day project direction, but report independent of project management for quality-related functions. The HL&P Project QA Manager reports to HL&P's Executive Vice President, Nuclear Group; the Bechtel Project
- QA Manager reports to the Bechtel Los Angeles Power Division QA Manager for Domestic Projects; and the Ebasco Quality Program Site Manager reports to the Ebasco Chief Quality Engineer.
, HL&P has QA responsibility for design, engineering, procurement, fabrica-tion, construction and operation of STP. As described in the QAPD, there is an HL&P perfomance overview of the QA activities of Bechtel and Ebasco, and a Bechtel performance overview of the Ebasco QA activities.
III. Design Review and Design Verification HL&P, as Applicant, has the responsibility for the design of STP. HL&P has contracted with Westinghouse for the Nuclear Steam Supply System which includes the appropriate design review and design verification as related to the W scope of supply. HL&P has contracted with Bechtel to perfom the design for the balance of plant systems and all structures. The requirements of 10CFR50, Appendix B Criterion III, Regulatory Guide 1.64 (Rev. 2) and ANSI N45.2.11-74 have been adopted for project design activities and are applied to Bechtel Engineering work in accordance with Bechtel's Quality Assurance Program documented in BQ-TOP-1, Rev. 3A (approved by the NRC) and the STP Quality Assurance Program Description, Rev. 3.
Bechtel will perfom and document design reviews and design verifications in accordance with its Engineering Department Procedures as implemented for the South Texas Project.
HL&P Engineering perfoms reviews of selected elements of the completed design, design documents and specifications to ensure that contractural requirements are met.
Figure 6 shows the key aspects of the relationship and responsibilities of the Bechtel and HL&P Engineering teams. The interface between HL&P and Bechtel Engineering is through the HL&P Manager, Engineering and the Bechtel Project Engineering Manager. At other Engineering levels there is a regular and routine comunication.
In addition to the HL&P Project Engineering perfomance overview of Bechtel separate reviews of certain elements of the plant design will be per-fomed by the recently created Engineering Assurance Department (EAD). These reviews will provide further confidence in the technical adequacy of the engi-neering and design of the STP.
The Engineering Assurance Department is a separate organization from the STP.
Therefore, Figures 2 and 6 do not reflect this organization. The Manager of the Engineering Assurance Department reports directly to the Vice President, Nuclear Engineering and Construction.
Ebasco, as Constructor, will implement the design issued to it by l
Bechtel.
The design documents will be forwarded to Ebasco through Bechtel Construction Management. As presently organized, all major design will be done by Bechtel.
Any required site design activities will either be perfomed by Bechtel Engineering or will be perfomed under the design control of Bechtel Engineering.
l l
SOUTH TEXAS PROJECT M ANAGEMENT ORGANIZATION MOUST04 LIGHilh G
& P0nta CO.
PROJE CT MAh AGE R I
MOU510h LIGHTehG
& POWE A CO.
ManactR SOUT M it R AS PROJE CT f
/ / /)
S E Chit L POWE R f
CO RPO R A1104 s
PROJE CT MAN AGE R
/ / //
I I
7///
i
~
~~
t hGit t E Rit G t h CI p i= G
/ / / /
l
.=..
... z
(
/,,,
l}
mi MA. !!Mt.,
- - - -- -- - t c;,i ; ;,',-
l
}
CO.!':5",0. [
/ / / /
l ket,*,*;,*,*;,=,*,*;;$
f f, /,
l l
ML&P SPC CONTROLSAto
= = - = * - - - - - - - - - "
ADuth151R AT10 h
/
SUPPORT SERV 6CES e
AND C0kTROLS
/N :
/ / /
~>
l f ///,
p.*.*?.*.*.'.*?..K.
j Mi&P SPC l.',
QUALITY A55Upantt.,.
Isa5C0 e...
QuatITY C ualit y
/- - %=.
ASSURatCE A$$uRahCE
- . Ah0 0uatI1v Conf Rot *.*
/ / / /'
e ;......*;;,***/.
LEGtto PROJECT DittCTIO4
PERFORMatCE OktRvite
- .. ** *** C0 0 R 0t h AT 10 4 l
5 MOU5104 LIGhil4G & Pont R I
M IE CMit L P0mt R CORP 0R Atl0m e."*.*.a.a.a.*....... -
gIalt0 I
i l
I Fig. 1 i
I HOUSTON LIGHTING O POWER COMPANY SOUTH TEXAS PROJECT PROJECT M ANAGEMENT MARCH 17.1902 I
I EXECUTIVE VICE PRESIDENT I
VICE PRESIDENT NUCLEAR ENGINEERING & CONSTRUCTION I
MANAGER SOtTTH TEXAS PROJECT I
I I
I SUPERVISING MANAGER MANAGER PROJECT ENGINEERING SUPPORT '4ERVICES QUALITY ASSURANCE MANAGER ENGINEER LICENSING LEGEND PROJECT DIRECTION PROJECT COORDINATION FIG 2
=.
s M TEMNCT BECHTEL POWER C0lWORATION ORGANIZATION BECHIE L POWE R CORPORATION PRE $10ENT ANO E XECUTIVE SPONSOR I
LOS ANGELES POWE R Olvi$10N VICE PRESIDENT ANO GENERAL MANAGE R l
LOS ANGELES POWEli O[V]SlcM HOUSTON VICE PRESIDENT PROJE CT QA aAANAGER OR DON PROMm V CE PR I NT PROGRAM MANAGER AND ARE A MANAGER I
l PROM CT PROJE CT ASST. PROJE CI MAN AGE R PROJE CT PROMCT ASSI. PROM CT MAN AGE R STRATE GIC PL ANNING ENGINEERING LICE NSING STARTUP AND TEST PROMCT CONTROL /
' QUALITY AS$URANCE FIOM CT MAN AGE R OF CON $iRUCilON MANAGER ANDPROCUREMENT MANAGER MANAGER ADMINISTRATID's MANAGER PROM CT PROM CT ENGINEERING PROCUREMENT MANAGER MANAGER LEGEle PROJECT LIRECTION PROJECTC00fWINATION Fig. 3
1..
\\
s t
\\
\\
s 1
e i
5'I i
t 11
\\
\\
gue 111
\\
i l
I C
l e
i e
1 "l
l g
s fI g n.
E g
e u
=
5 1
e I
e
?l l
I l
l i.I I
l l
3B5 l
[
1 i
1
~
gl bl 1
1I it Ii l
l l
T
%i s
e f
o e
e e
SOUTH TEXAS P,tOJECT E LECTRIC GEN E RATING STATION OUALITY ASSURANCE OaGANIZATIONS t
N CT esamaGast, STP teatNT asevaasCE
"""----9 gp matasta l
.I s
e es. ente,e nse assensue e ens even.a.a steesseitst e rs.e
- eau"n=a=na=*e m a t* -
.g e ata asosems mus
,5 s
8 r '
s s emientee one en.en,eee cnv umeva ne
=i====**
~
l seau l
swan.u e u.
"se*fu,g,emc1"e"sa'g'ne amoe -\\
- N 88 8eem:1 se l
m w
gggg o eMeme 8eeedWfE l
l m.c. Tee se seatII T asos esamu,anemanem g
een.
)
an=au mes enc e.ea 1
-j l
t erymeen scoenn e l
e 1
s i
l 1
l
, I m
i
't Guattf t lT5 fin &;
P.sGJIC14kattff a55easett pgs. gem ;Dat enf e?
I at C0e%
A0eneertfaafsee N
stes eat svet nytsca ce; etw a;synaeCl l
(
\\q g'
'#8 "*"
3
_ tuetav'sca l
sua n'tesattoms 3
suiwson
, i a
s y
s.
I.
J o ne,s.e a.4e n.,ce,.cn.v.
i e nwo.usu euc.m. ve.e J
. m.en.ncee cat emicine e ne 43 a en n.es.s.ca..e eu n sio,enu re i ne.u siw=t s..e.n l
e em.neu ve sa nun, ece ee see n e stm
% IIf Ff entff 9 5.m e
n.e.e c n ic ee e m eir m... u ec se
.nt.w au s eaa ns.sa s
A Sitad e seu. ues.ee,.it,e.es pe ns,eegt se mv.esms.ae.tt.ettseent l
coevee.t s,t. age. net t esataf f seats e amsta n ew een i
cues a. wics.se c ve tenu.ou.o.
a ai.c O
a.c o enn.ee 3
e e.s.n.o.a.n n.e,u sne s
,. one.n.as ue.n at iem.6 c c.m,s 3
m acne rue +catme no eerucisas a
I e ne.s.'a.cc'=e au-n,in
- oecew, c u.e.u.e n.e g e
na cet
.i e ne,ea,,i,c,re,,e,. uu.m, g n wmean emma n, o.i n 6 m.e
,aen
,e,,,,
ua.e ue o eve,ue. se.eeen, o,,en,,,,,,,,,,,
g Cucenen sa een==i e storenes agtetene a
y
. v i
I e
-a t
8 g
-6 g
BPC i I'
!r(~
==-~--- j Ouatif v assuaatCE
""""0 0 "
N f =e==d MastEtt I
e nem.,ia enia.nem s teene.enn unto c ame cess sec eep Mecettetet.
l Gertsas,et av es.se pas A c11 car m weseau.w ece,e varevitn eeve,c g
eenn euu e nwiums ate ments I
ma cn ustav anouni w
4 l
steer. metee.les esata v cm s eu un I
e m.u,nine.ee.c noenire s
g fee maeaste swege coatne g
smeesect retAc.t uanaste ase ette twateat s Tot l
states te teamet osatste i
l Amenasci pess 4 e.c oon aveoas, an t
g 1
I 1
D'leGe Of fitt l
+
Slf t lif t PRI4 CT Qualif f g
A311Raett 1 atiTT COef R06 Es&,tif v PROACT Qu PAGACT Sus
(
a13pS ett leGHILI A Giot t R et t e j
a
- m. =was a een,m
.s t
. eenucu.ea.eet.te..
e n n,e.en aca.
..a.e s
t no.e ue n up u ineenee e ne.
uceun e.uc.e ate n g.
.n.ee 1
. etet.pt.auf matteias ecessvestive seitaect ie 3 eaf.vt seremect f e u.u.; nun.ei mnues.s.ee s
auen o n e.u u ne.n us in.s.i 4
. en.n u neiee n m e, nein unnetu na un u
e ew.as amens ue ium.
eu e n,un.= wsun, g
.su,as iewi.ce. au sa as e.
out w ei..
m.
e I
l,
e platease gee.rtette cl teW1c
~
ves see n ptct centeac g
feelcGunf tte some as eHeste et ctSneer g
i I
I I
e i
EBASCO I
C0 elf svC fl0e esateTV PR04Raas 18 E8e0 Nae 4W4
$8TE thaea$1e gaf g pagg Pa0n C1 E"
e 84.p elitil pes caettesctico e gengevettaege teflinascel sea et tes se, err aseene seeceaemiet c seatne aseemen vase scent er m '
metee es seatete centest wres een see A'. '
e asseen t=at entes coe.vnet esmemece as tesectws pics,eeeeeseau sectes.s en e poemeesneesic etweeus 4
se vos ataves es vet a nasce ovatne asemasts paesaae to seance ssoasement tea teostenciesmaeasse ate star I
I agatsty assvenett Guattf T C0sta0L tuatnv atC0 A01 Sv*t evil 0e SUPT evtSca IUPlavtSOR Ss18 Sit t SIT E
- es pose +eis ses pesee.e e espeeseetg eee eescoes e seessee auv.iseee eeconsee f aces. cat e*etctnee see ggeme.cas esef c9het See Decta.G et 's e.e5 of esss46 4I5 e te twee evte e 'peegqq ese seteetle e st se u1890 seetect agene.imatewg gossa c4 te see>4.E'n n oteett a to 0415 e gogg gg agegeset t sansease.es M escoesett e ettoeast atent see See e pgsee,een seyectice e, DGestaccgb gasst eg g ette coegstec
- STte8 act e.te te, et alet Tiet actsenets cost actwndt e secessist eegge sec'g'es,eg ecletTS e EWE c e 41es seet set.sent paces eg e seecetteedsaWel eeveresse actose,tv Fig. 5
s o
e
- 9 r,
SOUTM TEE AS PROJFCT EmeGINEtmlNG TE AM ML&P
- MANAGER, e ese aus emme amo em one=== -====== - a== =m= eum -===
1 I
l I
I I
i g
&V5YEMS COMPONE NT S SITE E NGINE E m NG E NGIN E E MING E NGeh E E mlNG ENGINE E RING ADMINIST m ATIOed 1
- P.r,m.s.te in
.e,.
P.,.c.p.te ir.. tee,.,
. m.,e. S.it
,n,
.t
. A n.h et we e.n l
-t t. c oe.
m t et.
.e oce r.
.e oe a oe me.t c ethe pp-l Crlier te.
Creter m.
end Changes tae PE T.
i Cea.o of Pr ct m.w
..ec oe a
. C.or.,r,ete E r..r..eria.
. m
.e... ooe. r.
Docusveats eas casases.
Deaumeats end Casasse.
movies et Siertwe sad E acaeoriae Preseewees Operst6eas Precederes.
- Propere fee emmemption
- Prewtee teshalmel owpport
- Prewtoe support for l
for pursheen e Permanent Emeneuren Ee'wlpment end Enyaoering resteutlen e' pasas een ca ***
e penaledety eurbag operatieas Phoes Sunseavects.
of Coastewstica problemt.
e tenhalmel empport 9
- Prewtee techa6sse esopert e
l Perf arm E reggaeorlag te for laternal #rer ct for
- refect e
fwastierte, f*Me%
e ges for tae purchase E
of Operettenel Spare l
, g,,
g
,,,,gn,,
Porth E
Provide A/E performaace me ag e.im
)
raeadtergag espport.
Prowtos A/E pertermance a
- NS$$
moriswring ei.spPert.
l l
- Provide tachrhel ewopert for Br*ternet Project fwacWe%
l
- Prew6de torna. css eroport for purthese Of Peter *eaeat Englasered Eewlpment one l
Subceas ects e
I l
i I
g SouTM T E m AS PROJE CT ENGINEE meNG TE AM
.ECMTEL 1
I I
l e me amm amm e== een amas eum amme eum = eum ese== see - ess PROJECT E NGINE E msNG MANAGEm i
I I
I I
P moJE C T p mOJE CT p mOJE CT R E SIDE NT E NylNE E m ENGINE E m E NGINE E R PROJECT ENGINEE m SU PPO R T PLANT DESIGN SYSTEMS latorisco with L6eonelag e Pro,ect Asmlasseettaa e Ceaewuc* ten taittesten e
a Eagtaeorlag and o QA lawefece Cemettweteoa Cost Eettmete Enyaeoring Pienalag
- NSSS Convect Physical Dealea e Schedvie Deweseement e
<hiL*Structurel Sveiems Desiga
- C ost
-Ar enstec tures
- speae Levout 4secheaeces
- epe Strees
-Nweiser
<eatrots
-E sectrices I
l PROJECT OsmECTION INTE RF ACE emm amm mmune-FIGURE g l
l I
l l
l L