_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. .
-
. .
DAPR 131982
O)
c'
%
f
RECElVED
-9
Docket No. 50-295(DEPOS)
-
APR 291982w 1
g
5 kmu sexmm
Docket No. 50-304(DEPOS)
umas muuttia
y
Commonwealth Edison Company
Igg
ATTN:
Mr. Cordell Reed
Vice President
' /
Post Office Box 767
N
Chicago, IL 60690
Gentlemen:
This refers to a special inspection conducted by Messrs. W. L. Axelson and
J. P. Patterson of this office on January 30, 1982, of activities at the
Zion Nuclear Generating Station, Units 1 and 2, and to the discussions of
our findings with Mr. W. Brenner and others of your staff at the conclusion
of the inspec.. ion.
This inspection of your prompt public notification / warning system was con-
ducted to determine whether your system as described in your letters of
December 14 1981, and January 15, 1982, has been installed and tested.
7
Final judgment to determine if your system meets the full design objectives
of Appendix 3 of NUREG-0654 will be made jointly by NRC and FEMA in the near
future.
Our interim findings indicate that your system appears to meet the require-
ments of 10 CFR 50, Appendix E, Section IV.D.3.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure ~nder
u
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
W
8204 3 003(D
SQ
l
_ _ _
..
.
. .
Commonwealth Edison Company
2
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/&fAALL
C
J. Paperiello, Chief
Program Support Branch
Enclosure:
Inspection Reports
No. 50-295/82-05(DEPOS) and
No. 50-304/82-05(DEPOS)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
p
RIII
RIII
O
.
[H A965 f
Patterso so
Pap iello
4/9/82
M6.gp/
ORPl
.