ML20052B085
| ML20052B085 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/25/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20052B078 | List: |
| References | |
| NUDOCS 8204290672 | |
| Download: ML20052B085 (2) | |
Text
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISS' ION DOCKET NOS. 50-280 AND 50-281 VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES
- The U. S. Nuclear Regulatory Comission (the Commission) has issued Amendment No. 75 to Facility Operating License No. DPR-32 and Amendment No. 7,6 to Facility Operating License No. DPR-37 issued to Virginia Electric-and Power Company- (the licensee), which revised Technical Specifications for operation of the Surry Power Station, Unit Nos.1 and 2, respectively, (the facilities), located in Surry County, Virginia. The amendments are effective as of the date of issuance.
These amendments revise the Technical Specifications to change the frequency of calibrating seismic instrumentation from semi-annual to each re fueling.
The application for the amendments complies with the standards and requirements of the Atomic Energv Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate l
findings as required by the Act and the Commission's rules and regulations i
in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of' these amendments was not required since these amendments I
do not involve a significant hazards consideration.
The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(dl(.41 an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.
0 g204.29
f
~
7590-01 For.further details with respect to this action, see O) the appli-cation for amendments dated February 24,1982,(2) Amendment Nos.75 and 76 to License Nos. DPR-32 and DPR-37, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW., Washington, D.C. and at the Swem Library.-College of William and Mary, Williamsburg, Virginie 23185 A copy of items (2) and (3) may be obtained upon request add' essed to the U. S. Nuclear Regulatory Commission, Washington, D. C.
r 20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 25th day of March,1982.
F0k"HENUCL I, GULATORY COMMISSION-t f
i di y
Operating Reactors nch #1 Otvision of Licens l
4